DEFINITION - HEAT EXCHANGER
 Heat exchanger is a device built for efficient heat
transfer from one fluid to another, where the fluids
are separated by a solid wall, so that they never mix.
OR
 Heat exchanger is defined as a device used to
transfer heat from a fluids on one side of a barrier to
another fluid, flowing on the other side of the barrier.
TYPES OF SHELL AND TUBE
HEAT EXCHANGER
SHELL AND TUBE
TYPE
HEAT EXCHANGER
FIXED TUBESHEET
FLOATING
TUBESHEET
“U” BUNDLE
WITH SINGLE
TUBE SHEET
FIXED TUBESHEET
SUMMARY
 Two tube sheets with tube bundle assembled in
between, are fixed to both ends of the shell.
 Tube sheets are either directly welded to shell or
bolted to flanges which are welded to shell ends.
 Differential expansion if any, will develop stresses in
tubes & shell material.
 To take care of differential expansion, shell may
require expansion bellows.
FLOATING TUBESHEET
SUMMARY
 One tubesheet is fixed to one end of the shell.
 Other tubesheet is floating within the shell with
a floating head cover.
 This facilitates tube & shell to expand independently
without inducing any stresses due to differential expansion.
 No expansion bellow is required on the shell to take
care of differential expansion.
“U” BUNDLE WITH SINGLE
TUBESHEET
“U” TUBE BUNDLE, KETTLE
TYPE EXCHANGER
SUMMARY
 “U” bent tube bundle assembled on one tubesheet.
 Assembled tube bundle is inserted into the shell.
 Tube sheet is bolted to shell flange.
 “U” tubes can expand freely inside the shell.
 No stresses due to differential expansion.
 No expansion bellow is required on shell to take
care of differential expansion.
STANDARD CLASSIFICATION
AS PER TEMA CODE
 TEMA Class “R” for severe requirements of
petroleum / petroleum related application
 TEMA Class “C” for moderate requirements of
Commercial and General process application
 TEMA Class “B” for Chemical process service
MAJOR COMPONENTS
 SHELL
 NOZZLES
 CHANNEL
 D’END
 TUBESHEET
 TUBES
 BAFFLES
 TIE RODS
FUNCTION OF BAFFLES
 They guide the shell side flow in back & forth
as well as up & down direction, across the
tube field, increasing the velocity & the heat
transfer coefficient.
 They support the tubes and hold them in
proper position during assembly & operation.
 Prevent vibration of the tubes caused by flow
induced eddies.
TYPES OF BAFFLES
 Single Segmental Baffle Cuts
 Multi - Segmental Baffle Cuts
– Double Segment
– Triple Segment
 Disc & ring type
SINGLE SEGMENTAL BAFFLES
VERTICAL HORIZONTAL ROTATED
MULTI - SEGMENTAL BAFFLE
DOUBLE SEGMENTAL CUTS
MULTI - SEGMENTAL BAFFLE
TRIPLE SEGMENTAL CUTS
DISC & RING TYPE BAFFLE
TUBE # TUBESHEET WELDING
 Tube # tubesheet welding is defined as
“process of joining tube to tubesheet in a heat
exchanger by welding”.
VARIOUS TYPES OF TUBE #
TUBESHEET JOINTS
 Strength Expanded – Exp. Grooves in Tube
holes
 Strength Expanded – Without Exp. Grooves in
Tube holes
 Seal Welded & Strength Expanded
(With or Without Expansion Grooves)
 Strength Welded (Groove Weld Joint) & Light
Expanded
TUBE
TUBE SHEET
EXPANSION GROOVES
EXPANDED JOINT EXPANDED & SEAL
WELDED JOINT
TUBE
TUBE SHEET
STRENGTH WELDED JOINT
Strength Welded & Light
expanded
STRENTH WELD.
MINIMUM 2
PASSES
WELD GROOVE
T#TS Set up for Strength Weld
LIGHT EXPANDED AFTER WELDING
WELDER QUALIFICATION PROCEDURE
SCOPE
 This procedure covers
the requirements for
welding & testing of
tube # tubesheet joint
qualification
Reference documents
 Article F-3 of ASME
SEC.IX(QW193,page-9).
 ASME SEC.VIII
 Customer specification
PREPARATION OF MOCK UP BLOCK
 The tubesheet block shall be prepared on
a plate/forging of similar base material
(Thickness = or > 50 mm) for qualification
of welding procedure.
 For qualification of welder the tubesheet
block shall be prepared a plate/forging of similar base
material (Thickness = or > 38 mm).
 After machining, tube holes shall be drilled as per block
shown in fig-1.The hole size, pitch & weld edges shall
be identical to tubesheet of the equipment
WELDER TRAINING &
QUALIFICATION
 At the beginning, welder shall be given practice on
mock up block to achieve acceptable bead finish
as mentioned below :
1) Control of welding arc to avoid melt through in tube
wall.
2) Proper arc manipulation
3) Staggering of restart points
4) Acceptable bead finishes without excessive
reinforcement
IMPORTANT NOTE
 For procedure qualification 10 mock up welds
are to be produced within acceptable
standards, as mentioned in ASME SEC IX,
QW-193.1.
 After adequate practice welders are allowed
to weld in a qualification block. The number of
joints in welder qualification block will be 5
nos as per ASME SEC IX, QW-193.2.
PRECAUTIONS BEFORE TUBE #
TUBESHEET WELDING
 Uniform welding should be carried out while
welding tubesheet # shell .
 Excessive bow will lead to difficulties while in
tube insertion stage.
Ovality should be maintained at minimum
level, to allow smooth baffle assembly.
OPERATIONAL SEQUENCES FOR
TUBE # TUBESHEET WELDING
 Inside touchup
 Baffle insertion
 Tube insertion
 Setup of tube # tubesheet
 Welding of joints
 Tube trimming
 Leak test
INSIDE TOUCHUP
 Inside touchup of entire shell is to be done to
avoid any restrictions during baffle insertion.
 All inside seam should be checked for
minimum reinforcement.
BAFFLE INSERTION
 While drilling the baffles, the drill bit usually
gets deflected from the centre line of the
hole throughout entire stack.
 Hence, it is advisable to install the baffles
in the direction of drilling with respect to
the tubing direction.
 Baffles are inserted into the shell with the
help of fixture.
FIXTURE FOR BAFFLE INSERTION
TUBE INSERTION
 Cleaning of tube & tube sheet is the most
primary requirement before tube insertion.
Utmost care is to be given for the cleaning
process according to the standard practices.
 Tube insertion is done with the help of pilots
which provides ease in tube insertion.
STANDARD L&T PRACTICES
 The tube holes and out side surface of tube
shall be cleaned thoroughly to remove any
oil, grease, rust, dust from surfaces.
 Tube ends should be cleaned minimum upto
200 mm of length at both ends by wire
wheeling.
SETUP OF TUBE # TUBESHEET
 Setup is to be done in accordance to the
projection mentioned in the drawing.
 Projection rings are utilized to ensure the
projection of tubes with respect to tube sheet.
PREPARATORY ARRANGEMENT
BEFORE WELDING
 After insertion of tubes in tube holes, the tube ends
shall be pulled outside for cleaning of tube OD. The
corresponding hole ID on opposite end shall be
cleaned (35mm, minimum). In a row, one tube shall
be pulled forward and adjoining tube shall be
pushed backward for cleaning of tube OD and hole
ID alternatively.
 Availability of high purity argon cylinder duly cleared
by welding engg. For purity check, bead-on-plate
deposit shall be carried out. After grinding the bead
to remove the half thickness, PT check shall be
performed. Each tested and cleared cylinder shall
bear signature of welding engineer.
 Thoriated Tungsten (3.0 dia.)
 High frequency unit in welding m/c is working.
 Pre and post flow of shielding gas is properly
adjusted.
 Welders are qualified to weld that particular joint and
cleared RT of joint on mock -up piece before start of
welding.
 Gas cup with gas lenses.
 Leakage of shielding gas in connections
 Water cooling system and water circulation is in
order.
 Joint shall be cleaned with acetone just before start
of tack welding
PRECAUTIONS WHILE WELDING
 Follow the welding parameters as specified in WPS.
 Welding to be performed with shortest possible arc.
 Only vertical up progression is to the used.
 Projection of tungsten electrode from gas cup shall
be kept max 6.0 mm.
 Tungsten inclusion to the avoided. In case of any
doubt the point shall the dressed before proceeding
for further welding.
 Arc initiation shall be using high frequency limit.
 Restart point in a pass shall be kept at least 4mm
before the crater point of the bead. The restart of
successive passes shall be staggered w.r.t previous
passes.
 During PT after root pass it shall be ensured that
the penetrant (dye) is not entering the un-welded
joints. If the dye has entered the in welded joints,
the joint shall be cleaned thoroughly by pulling the
tubes forward and backward.
 Weld shape & size shall be controlled to meet the
requirement of visual inspection. For weld size
correct fillet gauge shall be used.
 Only one welder shall the allowed to complete a
joint. Mix up in a joint shall be avoided.
 Welding record of each T#TS joints shall be
maintained with data and welder stamp.
 The argon cylinder shall be replaced when there is
positive pressure. ( 10 kg per sq.cm)
 Filler wire shall be cleaned with emery paper
followed by acetone cleaning. After cleaning, it shall
be handled using cleaned cotton hand glove
 While using inconel filler wire, the arc shall be kept
on CS tubes to avoid excessive melting of SS
cladding.
 Joints shall be thoroughly cleaned after PT before
depositing next passes.
 Oxidized ends of filler wire shall be cut before
reusing it.
WELDING DEFECTS
TUBE TRIMMING
 Tube trimming is required to be done after
welding root pass of all tubes in one
tubesheet.
 It is done to remove excessive tube length by
machining on job.
 Supervisor should observe that minimum
tube length trimming ( < 10mm ) is required.
LEAK TEST
 Air and soap solution leak test.
 Helium leak test.
 Kerosene leak test.
 Hot oil test.
 Halogen leak test.
USEFUL CALCULATIONS
 Welder output.
 Counterweight calculation.
 Shell trimming.
WELDER OUTPUT
 Calculate welder output for a job with 10000 nos of tube with
20mm dia per shift?
 Assume that efficiency of average welder for tube # tubesheet
welding is 25mtr/12hrs.
 Circumference of tube = 2*pie*r
= 2*3.14159*10
= 62.83mm
= 63mm approx.
 Welder output/shift = Average efficiency/circumference
= 25*1000 / 63
= 397 passes (approx).
 No of passes/tube = 2 passes / tube
 Total nos of tube which could be welded/shift = 397/2
= 199 nos (approx)
COUNTER WEIGHT CLACULATION
 Counter weight = x
 X * RHS span = Weight of baffle * LHS span
 X * 5 = 10*5
 Hence, counterweight X = 10 ton
SHELL TRIMMING
Shell trimming for A-type weld configuration.
 X = L-2P-T1-T2-B1-B2+S
SHELL TRIMMING
Shell trimming for B-type weld configuration
 X = L-2P-T1-T2-B1-B2-2H-2R+S
ABBREVATIONS
 X = Distance from the edge of tubesheet to
shell edge (actual).
 T1 = Thickness of tierod tubesheet (actual).
 T2 = Thickness of second tubesheet (actual).
 P = Required tube projection
 L = Length of tubes (actual)
 H = Height of lip on second tubesheet
 R = Root gap between tubesheet & shell
 B1 = Bulge on tie rod tubesheet after welding
(actual)
 B2 = Expected bulge on second tubesheet
 S = Shrinkage of tubesheet
Heat Exchanger Tube to Tubesheet Welding Process

More Related Content

What's hot

B31.3 process piping course 02 metallic pipe &amp; fitting selection
B31.3 process piping course   02 metallic pipe &amp; fitting selectionB31.3 process piping course   02 metallic pipe &amp; fitting selection
B31.3 process piping course 02 metallic pipe &amp; fitting selectionAhmedhelal_Metito Helal
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentationMohamed Gaafar
 
178680732 pipe-hanger-design
178680732 pipe-hanger-design178680732 pipe-hanger-design
178680732 pipe-hanger-designTiago Farinhas
 
Welding Distortion Control.ppt
Welding Distortion Control.pptWelding Distortion Control.ppt
Welding Distortion Control.pptEhabGuirguis
 
Understanding Stress Analysis Topics
Understanding Stress Analysis TopicsUnderstanding Stress Analysis Topics
Understanding Stress Analysis TopicsZachary Swartz
 
ASME BOILER & PRESSURE SECTION VIII.ppt
ASME BOILER & PRESSURE SECTION VIII.pptASME BOILER & PRESSURE SECTION VIII.ppt
ASME BOILER & PRESSURE SECTION VIII.ppthesham ismail
 
Piping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingPiping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingAbhijeet Nagle
 
Heat Exchanger Inspection.pdf
Heat Exchanger Inspection.pdfHeat Exchanger Inspection.pdf
Heat Exchanger Inspection.pdfssuser80b094
 
Weld design symbols
Weld design symbolsWeld design symbols
Weld design symbolsRavi Shankar
 
Fabrication of storage buffer vessel
Fabrication of storage buffer vesselFabrication of storage buffer vessel
Fabrication of storage buffer vesselNishant Rao Boddeda
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Varun Patel
 
Repair a crack in pressure vessel head
Repair a crack in pressure vessel headRepair a crack in pressure vessel head
Repair a crack in pressure vessel headmohamed magdy khalifa
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 sJithu John
 
Welding distortion and its control
Welding distortion and its controlWelding distortion and its control
Welding distortion and its controlAnnamalai Ram
 

What's hot (20)

B31.3 process piping course 02 metallic pipe &amp; fitting selection
B31.3 process piping course   02 metallic pipe &amp; fitting selectionB31.3 process piping course   02 metallic pipe &amp; fitting selection
B31.3 process piping course 02 metallic pipe &amp; fitting selection
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentation
 
Pwht1
Pwht1Pwht1
Pwht1
 
178680732 pipe-hanger-design
178680732 pipe-hanger-design178680732 pipe-hanger-design
178680732 pipe-hanger-design
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
 
Welding Distortion Control.ppt
Welding Distortion Control.pptWelding Distortion Control.ppt
Welding Distortion Control.ppt
 
Understanding Stress Analysis Topics
Understanding Stress Analysis TopicsUnderstanding Stress Analysis Topics
Understanding Stress Analysis Topics
 
Welding electrode
Welding electrode Welding electrode
Welding electrode
 
ASME BOILER & PRESSURE SECTION VIII.ppt
ASME BOILER & PRESSURE SECTION VIII.pptASME BOILER & PRESSURE SECTION VIII.ppt
ASME BOILER & PRESSURE SECTION VIII.ppt
 
Piping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingPiping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / Hydrotesting
 
Heat Exchanger Inspection.pdf
Heat Exchanger Inspection.pdfHeat Exchanger Inspection.pdf
Heat Exchanger Inspection.pdf
 
Weld design symbols
Weld design symbolsWeld design symbols
Weld design symbols
 
Fabrication of storage buffer vessel
Fabrication of storage buffer vesselFabrication of storage buffer vessel
Fabrication of storage buffer vessel
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
 
How to Qualify a Welding Procedure
How to Qualify a Welding ProcedureHow to Qualify a Welding Procedure
How to Qualify a Welding Procedure
 
Repair a crack in pressure vessel head
Repair a crack in pressure vessel headRepair a crack in pressure vessel head
Repair a crack in pressure vessel head
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
 
Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
 
Welding distortion and its control
Welding distortion and its controlWelding distortion and its control
Welding distortion and its control
 
Shell rolling procedure
Shell rolling procedureShell rolling procedure
Shell rolling procedure
 

Similar to Heat Exchanger Tube to Tubesheet Welding Process

Inspection of heat exchanger during manufacturing
Inspection of heat exchanger  during manufacturingInspection of heat exchanger  during manufacturing
Inspection of heat exchanger during manufacturingKhurramYousaf7
 
pipes fittings &valves
 pipes fittings &valves pipes fittings &valves
pipes fittings &valvesYoga Sathish
 
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptxSPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptxAbhiSharma727808
 
PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARABHISHEK SINGH
 
Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsVijay Raj
 
Coupler (08102015)
Coupler (08102015)Coupler (08102015)
Coupler (08102015)Khairul Amri
 
Pipe Extrusion Line
Pipe Extrusion LinePipe Extrusion Line
Pipe Extrusion LineWali Khan
 
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app689198f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891AkashPatel747
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questionsKarthik Banari
 
Twi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsTwi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsThang Do Minh
 
Good practices in PSC work.ppt
Good practices in PSC work.pptGood practices in PSC work.ppt
Good practices in PSC work.pptssusercaf1a41
 
Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1dhiaa ebadi
 
Shell and Tube Heat Exchanger in heat Transfer
Shell and Tube Heat Exchanger in heat TransferShell and Tube Heat Exchanger in heat Transfer
Shell and Tube Heat Exchanger in heat TransferUsman Shah
 
Failure in synthesis converter
Failure in synthesis converterFailure in synthesis converter
Failure in synthesis converterPrem Baboo
 
Basic principles of_ tube_expanding
Basic principles of_ tube_expandingBasic principles of_ tube_expanding
Basic principles of_ tube_expandingUjwal Joshi
 
4. piping piping . piping . piping .ppt
4. piping  piping . piping . piping .ppt4. piping  piping . piping . piping .ppt
4. piping piping . piping . piping .pptHussamElddinKhasawne
 
Intake and Pipes joining
Intake and Pipes joiningIntake and Pipes joining
Intake and Pipes joiningLobsang Jampa
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trialNagesh H
 

Similar to Heat Exchanger Tube to Tubesheet Welding Process (20)

Inspection of heat exchanger during manufacturing
Inspection of heat exchanger  during manufacturingInspection of heat exchanger  during manufacturing
Inspection of heat exchanger during manufacturing
 
pipes fittings &valves
 pipes fittings &valves pipes fittings &valves
pipes fittings &valves
 
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptxSPECIFICATION WRITING II-FIRE FIGHTING.pptx
SPECIFICATION WRITING II-FIRE FIGHTING.pptx
 
PPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWARPPT ON CIM ,BHEL HARIDWAR
PPT ON CIM ,BHEL HARIDWAR
 
Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressureparts
 
Coupler (08102015)
Coupler (08102015)Coupler (08102015)
Coupler (08102015)
 
Pipe Extrusion Line
Pipe Extrusion LinePipe Extrusion Line
Pipe Extrusion Line
 
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app689198f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
98f5ce56 bca9-41ef-b8c9-095d7bf17a1c-151202050517-lva1-app6891
 
Thermoplastic Liners
Thermoplastic LinersThermoplastic Liners
Thermoplastic Liners
 
Fittings-Training PPT.pdf
Fittings-Training PPT.pdfFittings-Training PPT.pdf
Fittings-Training PPT.pdf
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
 
Twi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsTwi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questions
 
Good practices in PSC work.ppt
Good practices in PSC work.pptGood practices in PSC work.ppt
Good practices in PSC work.ppt
 
Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1
 
Shell and Tube Heat Exchanger in heat Transfer
Shell and Tube Heat Exchanger in heat TransferShell and Tube Heat Exchanger in heat Transfer
Shell and Tube Heat Exchanger in heat Transfer
 
Failure in synthesis converter
Failure in synthesis converterFailure in synthesis converter
Failure in synthesis converter
 
Basic principles of_ tube_expanding
Basic principles of_ tube_expandingBasic principles of_ tube_expanding
Basic principles of_ tube_expanding
 
4. piping piping . piping . piping .ppt
4. piping  piping . piping . piping .ppt4. piping  piping . piping . piping .ppt
4. piping piping . piping . piping .ppt
 
Intake and Pipes joining
Intake and Pipes joiningIntake and Pipes joining
Intake and Pipes joining
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
 

Recently uploaded

Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpmainac1
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonDelhi Call girls
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...ankitnayak356677
 
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制didi bibo
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
A level Digipak development Presentation
A level Digipak development PresentationA level Digipak development Presentation
A level Digipak development Presentationamedia6
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Douxkojalkojal131
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...Suhani Kapoor
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...Suhani Kapoor
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 

Recently uploaded (20)

Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUp
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
 
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
A level Digipak development Presentation
A level Digipak development PresentationA level Digipak development Presentation
A level Digipak development Presentation
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 

Heat Exchanger Tube to Tubesheet Welding Process

  • 1.
  • 2.
  • 3. DEFINITION - HEAT EXCHANGER  Heat exchanger is a device built for efficient heat transfer from one fluid to another, where the fluids are separated by a solid wall, so that they never mix. OR  Heat exchanger is defined as a device used to transfer heat from a fluids on one side of a barrier to another fluid, flowing on the other side of the barrier.
  • 4. TYPES OF SHELL AND TUBE HEAT EXCHANGER SHELL AND TUBE TYPE HEAT EXCHANGER FIXED TUBESHEET FLOATING TUBESHEET “U” BUNDLE WITH SINGLE TUBE SHEET
  • 6. SUMMARY  Two tube sheets with tube bundle assembled in between, are fixed to both ends of the shell.  Tube sheets are either directly welded to shell or bolted to flanges which are welded to shell ends.  Differential expansion if any, will develop stresses in tubes & shell material.  To take care of differential expansion, shell may require expansion bellows.
  • 8. SUMMARY  One tubesheet is fixed to one end of the shell.  Other tubesheet is floating within the shell with a floating head cover.  This facilitates tube & shell to expand independently without inducing any stresses due to differential expansion.  No expansion bellow is required on the shell to take care of differential expansion.
  • 9. “U” BUNDLE WITH SINGLE TUBESHEET
  • 10. “U” TUBE BUNDLE, KETTLE TYPE EXCHANGER
  • 11. SUMMARY  “U” bent tube bundle assembled on one tubesheet.  Assembled tube bundle is inserted into the shell.  Tube sheet is bolted to shell flange.  “U” tubes can expand freely inside the shell.  No stresses due to differential expansion.  No expansion bellow is required on shell to take care of differential expansion.
  • 12. STANDARD CLASSIFICATION AS PER TEMA CODE  TEMA Class “R” for severe requirements of petroleum / petroleum related application  TEMA Class “C” for moderate requirements of Commercial and General process application  TEMA Class “B” for Chemical process service
  • 13. MAJOR COMPONENTS  SHELL  NOZZLES  CHANNEL  D’END  TUBESHEET  TUBES  BAFFLES  TIE RODS
  • 14. FUNCTION OF BAFFLES  They guide the shell side flow in back & forth as well as up & down direction, across the tube field, increasing the velocity & the heat transfer coefficient.  They support the tubes and hold them in proper position during assembly & operation.  Prevent vibration of the tubes caused by flow induced eddies.
  • 15. TYPES OF BAFFLES  Single Segmental Baffle Cuts  Multi - Segmental Baffle Cuts – Double Segment – Triple Segment  Disc & ring type
  • 16. SINGLE SEGMENTAL BAFFLES VERTICAL HORIZONTAL ROTATED
  • 17. MULTI - SEGMENTAL BAFFLE DOUBLE SEGMENTAL CUTS
  • 18. MULTI - SEGMENTAL BAFFLE TRIPLE SEGMENTAL CUTS
  • 19. DISC & RING TYPE BAFFLE
  • 20.
  • 21. TUBE # TUBESHEET WELDING  Tube # tubesheet welding is defined as “process of joining tube to tubesheet in a heat exchanger by welding”.
  • 22. VARIOUS TYPES OF TUBE # TUBESHEET JOINTS  Strength Expanded – Exp. Grooves in Tube holes  Strength Expanded – Without Exp. Grooves in Tube holes  Seal Welded & Strength Expanded (With or Without Expansion Grooves)  Strength Welded (Groove Weld Joint) & Light Expanded
  • 23. TUBE TUBE SHEET EXPANSION GROOVES EXPANDED JOINT EXPANDED & SEAL WELDED JOINT
  • 24. TUBE TUBE SHEET STRENGTH WELDED JOINT Strength Welded & Light expanded STRENTH WELD. MINIMUM 2 PASSES WELD GROOVE T#TS Set up for Strength Weld LIGHT EXPANDED AFTER WELDING
  • 25. WELDER QUALIFICATION PROCEDURE SCOPE  This procedure covers the requirements for welding & testing of tube # tubesheet joint qualification Reference documents  Article F-3 of ASME SEC.IX(QW193,page-9).  ASME SEC.VIII  Customer specification
  • 26. PREPARATION OF MOCK UP BLOCK  The tubesheet block shall be prepared on a plate/forging of similar base material (Thickness = or > 50 mm) for qualification of welding procedure.  For qualification of welder the tubesheet block shall be prepared a plate/forging of similar base material (Thickness = or > 38 mm).  After machining, tube holes shall be drilled as per block shown in fig-1.The hole size, pitch & weld edges shall be identical to tubesheet of the equipment
  • 27.
  • 28. WELDER TRAINING & QUALIFICATION  At the beginning, welder shall be given practice on mock up block to achieve acceptable bead finish as mentioned below : 1) Control of welding arc to avoid melt through in tube wall. 2) Proper arc manipulation 3) Staggering of restart points 4) Acceptable bead finishes without excessive reinforcement
  • 29. IMPORTANT NOTE  For procedure qualification 10 mock up welds are to be produced within acceptable standards, as mentioned in ASME SEC IX, QW-193.1.  After adequate practice welders are allowed to weld in a qualification block. The number of joints in welder qualification block will be 5 nos as per ASME SEC IX, QW-193.2.
  • 30. PRECAUTIONS BEFORE TUBE # TUBESHEET WELDING  Uniform welding should be carried out while welding tubesheet # shell .  Excessive bow will lead to difficulties while in tube insertion stage.
  • 31. Ovality should be maintained at minimum level, to allow smooth baffle assembly.
  • 32. OPERATIONAL SEQUENCES FOR TUBE # TUBESHEET WELDING  Inside touchup  Baffle insertion  Tube insertion  Setup of tube # tubesheet  Welding of joints  Tube trimming  Leak test
  • 33. INSIDE TOUCHUP  Inside touchup of entire shell is to be done to avoid any restrictions during baffle insertion.  All inside seam should be checked for minimum reinforcement.
  • 34. BAFFLE INSERTION  While drilling the baffles, the drill bit usually gets deflected from the centre line of the hole throughout entire stack.  Hence, it is advisable to install the baffles in the direction of drilling with respect to the tubing direction.  Baffles are inserted into the shell with the help of fixture.
  • 35.
  • 36.
  • 37. FIXTURE FOR BAFFLE INSERTION
  • 38. TUBE INSERTION  Cleaning of tube & tube sheet is the most primary requirement before tube insertion. Utmost care is to be given for the cleaning process according to the standard practices.  Tube insertion is done with the help of pilots which provides ease in tube insertion.
  • 39. STANDARD L&T PRACTICES  The tube holes and out side surface of tube shall be cleaned thoroughly to remove any oil, grease, rust, dust from surfaces.  Tube ends should be cleaned minimum upto 200 mm of length at both ends by wire wheeling.
  • 40.
  • 41. SETUP OF TUBE # TUBESHEET  Setup is to be done in accordance to the projection mentioned in the drawing.  Projection rings are utilized to ensure the projection of tubes with respect to tube sheet.
  • 42.
  • 43. PREPARATORY ARRANGEMENT BEFORE WELDING  After insertion of tubes in tube holes, the tube ends shall be pulled outside for cleaning of tube OD. The corresponding hole ID on opposite end shall be cleaned (35mm, minimum). In a row, one tube shall be pulled forward and adjoining tube shall be pushed backward for cleaning of tube OD and hole ID alternatively.  Availability of high purity argon cylinder duly cleared by welding engg. For purity check, bead-on-plate deposit shall be carried out. After grinding the bead to remove the half thickness, PT check shall be performed. Each tested and cleared cylinder shall bear signature of welding engineer.
  • 44.  Thoriated Tungsten (3.0 dia.)  High frequency unit in welding m/c is working.  Pre and post flow of shielding gas is properly adjusted.  Welders are qualified to weld that particular joint and cleared RT of joint on mock -up piece before start of welding.  Gas cup with gas lenses.  Leakage of shielding gas in connections  Water cooling system and water circulation is in order.  Joint shall be cleaned with acetone just before start of tack welding
  • 45.
  • 46. PRECAUTIONS WHILE WELDING  Follow the welding parameters as specified in WPS.  Welding to be performed with shortest possible arc.  Only vertical up progression is to the used.  Projection of tungsten electrode from gas cup shall be kept max 6.0 mm.  Tungsten inclusion to the avoided. In case of any doubt the point shall the dressed before proceeding for further welding.  Arc initiation shall be using high frequency limit.  Restart point in a pass shall be kept at least 4mm before the crater point of the bead. The restart of successive passes shall be staggered w.r.t previous passes.
  • 47.  During PT after root pass it shall be ensured that the penetrant (dye) is not entering the un-welded joints. If the dye has entered the in welded joints, the joint shall be cleaned thoroughly by pulling the tubes forward and backward.  Weld shape & size shall be controlled to meet the requirement of visual inspection. For weld size correct fillet gauge shall be used.  Only one welder shall the allowed to complete a joint. Mix up in a joint shall be avoided.  Welding record of each T#TS joints shall be maintained with data and welder stamp.  The argon cylinder shall be replaced when there is positive pressure. ( 10 kg per sq.cm)
  • 48.  Filler wire shall be cleaned with emery paper followed by acetone cleaning. After cleaning, it shall be handled using cleaned cotton hand glove  While using inconel filler wire, the arc shall be kept on CS tubes to avoid excessive melting of SS cladding.  Joints shall be thoroughly cleaned after PT before depositing next passes.  Oxidized ends of filler wire shall be cut before reusing it.
  • 50.
  • 51. TUBE TRIMMING  Tube trimming is required to be done after welding root pass of all tubes in one tubesheet.  It is done to remove excessive tube length by machining on job.  Supervisor should observe that minimum tube length trimming ( < 10mm ) is required.
  • 52. LEAK TEST  Air and soap solution leak test.  Helium leak test.  Kerosene leak test.  Hot oil test.  Halogen leak test.
  • 53. USEFUL CALCULATIONS  Welder output.  Counterweight calculation.  Shell trimming.
  • 54. WELDER OUTPUT  Calculate welder output for a job with 10000 nos of tube with 20mm dia per shift?  Assume that efficiency of average welder for tube # tubesheet welding is 25mtr/12hrs.  Circumference of tube = 2*pie*r = 2*3.14159*10 = 62.83mm = 63mm approx.  Welder output/shift = Average efficiency/circumference = 25*1000 / 63 = 397 passes (approx).  No of passes/tube = 2 passes / tube  Total nos of tube which could be welded/shift = 397/2 = 199 nos (approx)
  • 55. COUNTER WEIGHT CLACULATION  Counter weight = x  X * RHS span = Weight of baffle * LHS span  X * 5 = 10*5  Hence, counterweight X = 10 ton
  • 56. SHELL TRIMMING Shell trimming for A-type weld configuration.  X = L-2P-T1-T2-B1-B2+S
  • 57. SHELL TRIMMING Shell trimming for B-type weld configuration  X = L-2P-T1-T2-B1-B2-2H-2R+S
  • 58. ABBREVATIONS  X = Distance from the edge of tubesheet to shell edge (actual).  T1 = Thickness of tierod tubesheet (actual).  T2 = Thickness of second tubesheet (actual).  P = Required tube projection  L = Length of tubes (actual)  H = Height of lip on second tubesheet  R = Root gap between tubesheet & shell  B1 = Bulge on tie rod tubesheet after welding (actual)  B2 = Expected bulge on second tubesheet  S = Shrinkage of tubesheet