ARYA
Institute of Engg. Tech. & Management
A Practical Training and Industrial Visit Presentation
On
Multi-Storey Residential Building
(Rajasthan Housing Board)
Submitted to:
Mr. Gori Shankar Soni
HOD, Civil Engg. Department
Submitted by:
Deepak Yadav
Roll No. 13EAOCE018
Content
• Introduction
• Company Overview
• Unit Plan
• Material Used for Construction
• Preparation of Foundation
• Equipment Used
• Brick Masonary
• Bonds Used in Brick Masonary
• Plastering
• Building By-Laws
• Conclusion
Introduction
• Name of Project
• Company Name
• Location of Site
• No. of Flats
• Project Start
• Project End
• Super Built up Area:
• Cost per flat
• Project Manager
: Multi-Storey Residential
Building(G+12)
: Rajasthan Housing Board
: B-2 Bypass, Mansarover,
Jaipur
: 93(3-BHK)
: 15 March 2015
: March 2017
185.83 Sq. m(per flat)
: 38 Lakhs
: Mr. J.P Chawla
Company Overview
• The Rajasthan Housing Board was established on 24th Feb,
1970 due to an RHB Act No. 4, of 1970 by the Government of
Rajasthan.
• It was Established to provide for measures to be taken to deal
with & satisfy the need of Housing accommodation in State of
Rajasthan.
• The Board consist of a chairman, appointed by The State
Government and of six non official members, nominated by
The Government .
Unit Plan
Materials Used for Construction
Cement:
• The function of cement is to combine with water and to form
cement paste. This paste sets and binds the aggregate
together into a stone like hard mass & thus provides strength,
durability .
Aggregates:
• Aggregates are small pieces of broken stones in irregular size
and shapes.
Types of Aggregates:
Fine Aggregate
Coarse Aggregate
Cont.….
Water:
• It is an important ingredient of concrete because it combines
with cement and forms a binding paste. The paste thus
formed fills up the voids of the sand and coarse aggregate
bringing them into close adhesion.
R.C.C:
• Though plain cement concrete has high compressive strength
and its tensile strength is relatively low.
• So it is reinforced by placing steel bars in the tensile zone of
the concrete beam so that the compressive stress is carried by
concrete and tensile stress is carried by steel reinforcing bars.
Preparation of Foundation
• A foundation is the element of any structure which connects it to the
ground, and transfers loads from the structure to the ground. Foundation
is a part of the sub structure. Sub structure is constructed according to soil
quality at that site.
It is of 2 Types;
A. Shallow Foundation.
B. Deep Foundation
A. Shallow Foundation: If soil have good bearing capacity than we use
shallow foundation in construction.
• Shallow foundations are also called spread footings or open footings.
• It is also of different types such as:
Cont.….
• Individual footing
• Strip footing
• Raft foundation
Individual Footing with plinth beam
Cont.….
• B. Deep Foundation:
• A deep foundation is a type of foundation which transfers building loads to
the earth farther down from the surface than a shallow foundation does,
to a subsurface layer or a range of depths.
• It is Mainly done by Pile Foundation
Equipment Used
Batching Machine:
• The measurement of materials for making concrete is known
as batching. The machines which used for batching is known
as batching machine.
Concrete Mixer:
• This is a power mechanically operated machine which is used
to mix the concrete. It consists a hollow cylindrical part with
inner side wings. In which cement, sand, aggregates and
water is mix properly.
Cont..…
Belt Conveyors:
• The process of carrying the concrete mix from the place of it’s
mixing to final position of deposition is termed as
transportation of concrete.
• At site it is done by belt conveyors.
Concrete mixer Belt Conveyors
Cont.….
Compactors:
• When the concrete has been placed, it shows a very loose
structure. Hence, it must be compacted to remove the air
bubbles and voids so as to make it dense and solid concrete to
obtain a high strength.
• At the site , Needle vibrator
was used.
Brick Masonary
• The bricks are obtained by moulding clay in rectangular block
of uniform size and then drying and burning these blocks.
Brick masonry easy to construct compare stone masonry.
• Less time consuming .
• There is no need of skilled labour to construct it.
• The bricks do not require dressing and the arty of laying bricks
is so simple.
• There are Mainly 3 classes of bricks:
• Class A
• Class B
• Class C
Cont.….
Brick work in Mud Mortar:
• In this type of brick work mud is used to fill up the joints. Mud
is mixer of sand and clay. The thickness of mortar joint is
12mm.
Brick Work In Lime Mortar:
• Lime mortar is mixer of lime and sand the thickness of joints
does not exceeds 10mm.
Brick Work In Cement Mortar:
• Cement mortar is mixer of cement and sand .
• The ratio of cement and sand varies according to construction
as in brick masonary it generally kept 1:6.The thickness of
joint does not exceeds 10mm.
Bonds Used in Brick Masonary
• Mainly, there are 4 types of bonds used in brick masonary.
Stretcher Bond :
• The bricks are laid along its length in all courses.
Cont.….
Header Bond:
• The bricks are laid along its width in all courses. A half and
three quarter bat is also used in alternative courses to break
the verticality of joints.
English Bond:
• Alternate courses consist of stretcher and header. A queen
closer is put next to quoin header to break the verticality of
joints.
• Generally such types of bond is provided in walls width is 9
inches
Cont.….
English Bond:
Flemish Bond:
• It also provides good strength. Stretcher and header is
provided in each course alternatively. A queen closer is put
next to quoin header in each alternate course to break the
verticality of joints.
Plastering
• The term plastering is used to describe thin cover that is
applied on the surface of walls. It removes unevenness of
surface of walls. Sometimes it is use for decorative purpose
also.
• The thickness of plaster should be at least 10-15 mm.
Building By-Laws
• For the construction of any building, certain restrictions are
laid down by Municipal bodies, Urban development
authorities ,and other government departments as town
planning trusts to clear open spaces to be left around the
buildings.
Plinth Area Regulations:
S.no Areaof plot Maximum permissible covered area
1 Less than 200 sq. m 66.66 % of the plot area on the ground.
2 201 to 500 sq. m 50% of the plot area or 133 sq. m whichever
is more.
3 501 to 1000 sq. m 40% of the plot area or 250 sq. m whichever
is more.
4 More than 1000 sq. m 33.33 % of the plot area or 400 sq. m
whichever is more.
Cont.….
Open Space Regulations:
• Width of street fronting the plot (m) Front open space minimum (m)
Upto7.5 1.5
7.5 to 18 3.0
18 to 30 4.5
Above 30 6.0
Rear and Side Open Space: Avg. width = 3 m
• At no place less than 1.8 m
• Can be reduced to 1.5 m for building ht. <7m
Conclusion
• Durability of a building depend mainly on proper construction
process and proper use of materials.
• As per my training ,I have conclude that , during my training
days I was familiar with the construction of brick masonry &
plastering and other works under a Rajasthan Housing Board
project.
• Plaster is necessary to cover and protect the masonry from
weathering factor.
deepakppt-170326hfyfyuftuffyyf210140.pptx

Mais conteúdo relacionado

Semelhante a deepakppt-170326hfyfyuftuffyyf210140.pptx

CONSTRUCTION PROCESSES in CIVIL ENGINEERING (HISTORICAL AND MODERN)
CONSTRUCTION PROCESSES  in CIVIL ENGINEERING (HISTORICAL AND MODERN) CONSTRUCTION PROCESSES  in CIVIL ENGINEERING (HISTORICAL AND MODERN)
CONSTRUCTION PROCESSES in CIVIL ENGINEERING (HISTORICAL AND MODERN) Hamza Waheed
 
Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction RAMPRASAD KUMAWAT
 
Types of Concrete
Types of ConcreteTypes of Concrete
Types of ConcreteMaliha Mehr
 
3. Part-I I Block masonry work.pptx
3. Part-I I Block  masonry work.pptx3. Part-I I Block  masonry work.pptx
3. Part-I I Block masonry work.pptxTarikuDessu
 
Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frameBurkaDinka
 
specifications of buildings.pptx
specifications of buildings.pptxspecifications of buildings.pptx
specifications of buildings.pptxrakesh11032000
 
Summer training at CPWD by Aaditi Dhyani
Summer training at CPWD by Aaditi DhyaniSummer training at CPWD by Aaditi Dhyani
Summer training at CPWD by Aaditi DhyaniAaditi Dhyani
 
Placing and compaction of cement concrete
Placing and compaction of cement concretePlacing and compaction of cement concrete
Placing and compaction of cement concretePramod GK
 
Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningANURAG KASHYAP
 
Process of manufacture of concrete
Process of manufacture of  concreteProcess of manufacture of  concrete
Process of manufacture of concreteManpreet Singh
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxJaySinghchib1
 
working in a building and all the procedures
working in a building and all the proceduresworking in a building and all the procedures
working in a building and all the proceduresazharbhattumz
 
Adv.Construction - assignement.pdf
Adv.Construction - assignement.pdfAdv.Construction - assignement.pdf
Adv.Construction - assignement.pdfDarshanLimbda
 
Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)RAMPRASAD KUMAWAT
 
concrete construction By Engr M Usman
concrete construction By Engr M Usmanconcrete construction By Engr M Usman
concrete construction By Engr M Usman3313mughal
 

Semelhante a deepakppt-170326hfyfyuftuffyyf210140.pptx (20)

CONSTRUCTION PROCESSES in CIVIL ENGINEERING (HISTORICAL AND MODERN)
CONSTRUCTION PROCESSES  in CIVIL ENGINEERING (HISTORICAL AND MODERN) CONSTRUCTION PROCESSES  in CIVIL ENGINEERING (HISTORICAL AND MODERN)
CONSTRUCTION PROCESSES in CIVIL ENGINEERING (HISTORICAL AND MODERN)
 
Compaction of concrete
Compaction of concreteCompaction of concrete
Compaction of concrete
 
Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction Conventional Construction : Concrete Construction
Conventional Construction : Concrete Construction
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
 
Types of Concrete
Types of ConcreteTypes of Concrete
Types of Concrete
 
Ferro cement by Dr.Vinay Kumar B M
Ferro cement by Dr.Vinay Kumar B MFerro cement by Dr.Vinay Kumar B M
Ferro cement by Dr.Vinay Kumar B M
 
3. Part-I I Block masonry work.pptx
3. Part-I I Block  masonry work.pptx3. Part-I I Block  masonry work.pptx
3. Part-I I Block masonry work.pptx
 
Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frame
 
specifications of buildings.pptx
specifications of buildings.pptxspecifications of buildings.pptx
specifications of buildings.pptx
 
Summer training at CPWD by Aaditi Dhyani
Summer training at CPWD by Aaditi DhyaniSummer training at CPWD by Aaditi Dhyani
Summer training at CPWD by Aaditi Dhyani
 
Fresh Concrete.pdf
Fresh Concrete.pdfFresh Concrete.pdf
Fresh Concrete.pdf
 
IPT Training
IPT TrainingIPT Training
IPT Training
 
Placing and compaction of cement concrete
Placing and compaction of cement concretePlacing and compaction of cement concrete
Placing and compaction of cement concrete
 
Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinning
 
Process of manufacture of concrete
Process of manufacture of  concreteProcess of manufacture of  concrete
Process of manufacture of concrete
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
working in a building and all the procedures
working in a building and all the proceduresworking in a building and all the procedures
working in a building and all the procedures
 
Adv.Construction - assignement.pdf
Adv.Construction - assignement.pdfAdv.Construction - assignement.pdf
Adv.Construction - assignement.pdf
 
Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)Repair techniques : Grouting (RR&S)
Repair techniques : Grouting (RR&S)
 
concrete construction By Engr M Usman
concrete construction By Engr M Usmanconcrete construction By Engr M Usman
concrete construction By Engr M Usman
 

Último

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Último (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

deepakppt-170326hfyfyuftuffyyf210140.pptx

  • 1. ARYA Institute of Engg. Tech. & Management A Practical Training and Industrial Visit Presentation On Multi-Storey Residential Building (Rajasthan Housing Board) Submitted to: Mr. Gori Shankar Soni HOD, Civil Engg. Department Submitted by: Deepak Yadav Roll No. 13EAOCE018
  • 2. Content • Introduction • Company Overview • Unit Plan • Material Used for Construction • Preparation of Foundation • Equipment Used • Brick Masonary • Bonds Used in Brick Masonary • Plastering • Building By-Laws • Conclusion
  • 3. Introduction • Name of Project • Company Name • Location of Site • No. of Flats • Project Start • Project End • Super Built up Area: • Cost per flat • Project Manager : Multi-Storey Residential Building(G+12) : Rajasthan Housing Board : B-2 Bypass, Mansarover, Jaipur : 93(3-BHK) : 15 March 2015 : March 2017 185.83 Sq. m(per flat) : 38 Lakhs : Mr. J.P Chawla
  • 4. Company Overview • The Rajasthan Housing Board was established on 24th Feb, 1970 due to an RHB Act No. 4, of 1970 by the Government of Rajasthan. • It was Established to provide for measures to be taken to deal with & satisfy the need of Housing accommodation in State of Rajasthan. • The Board consist of a chairman, appointed by The State Government and of six non official members, nominated by The Government .
  • 6. Materials Used for Construction Cement: • The function of cement is to combine with water and to form cement paste. This paste sets and binds the aggregate together into a stone like hard mass & thus provides strength, durability . Aggregates: • Aggregates are small pieces of broken stones in irregular size and shapes. Types of Aggregates: Fine Aggregate Coarse Aggregate
  • 7. Cont.…. Water: • It is an important ingredient of concrete because it combines with cement and forms a binding paste. The paste thus formed fills up the voids of the sand and coarse aggregate bringing them into close adhesion. R.C.C: • Though plain cement concrete has high compressive strength and its tensile strength is relatively low. • So it is reinforced by placing steel bars in the tensile zone of the concrete beam so that the compressive stress is carried by concrete and tensile stress is carried by steel reinforcing bars.
  • 8. Preparation of Foundation • A foundation is the element of any structure which connects it to the ground, and transfers loads from the structure to the ground. Foundation is a part of the sub structure. Sub structure is constructed according to soil quality at that site. It is of 2 Types; A. Shallow Foundation. B. Deep Foundation A. Shallow Foundation: If soil have good bearing capacity than we use shallow foundation in construction. • Shallow foundations are also called spread footings or open footings. • It is also of different types such as:
  • 9. Cont.…. • Individual footing • Strip footing • Raft foundation Individual Footing with plinth beam
  • 10. Cont.…. • B. Deep Foundation: • A deep foundation is a type of foundation which transfers building loads to the earth farther down from the surface than a shallow foundation does, to a subsurface layer or a range of depths. • It is Mainly done by Pile Foundation
  • 11. Equipment Used Batching Machine: • The measurement of materials for making concrete is known as batching. The machines which used for batching is known as batching machine. Concrete Mixer: • This is a power mechanically operated machine which is used to mix the concrete. It consists a hollow cylindrical part with inner side wings. In which cement, sand, aggregates and water is mix properly.
  • 12. Cont..… Belt Conveyors: • The process of carrying the concrete mix from the place of it’s mixing to final position of deposition is termed as transportation of concrete. • At site it is done by belt conveyors. Concrete mixer Belt Conveyors
  • 13. Cont.…. Compactors: • When the concrete has been placed, it shows a very loose structure. Hence, it must be compacted to remove the air bubbles and voids so as to make it dense and solid concrete to obtain a high strength. • At the site , Needle vibrator was used.
  • 14. Brick Masonary • The bricks are obtained by moulding clay in rectangular block of uniform size and then drying and burning these blocks. Brick masonry easy to construct compare stone masonry. • Less time consuming . • There is no need of skilled labour to construct it. • The bricks do not require dressing and the arty of laying bricks is so simple. • There are Mainly 3 classes of bricks: • Class A • Class B • Class C
  • 15. Cont.…. Brick work in Mud Mortar: • In this type of brick work mud is used to fill up the joints. Mud is mixer of sand and clay. The thickness of mortar joint is 12mm. Brick Work In Lime Mortar: • Lime mortar is mixer of lime and sand the thickness of joints does not exceeds 10mm. Brick Work In Cement Mortar: • Cement mortar is mixer of cement and sand . • The ratio of cement and sand varies according to construction as in brick masonary it generally kept 1:6.The thickness of joint does not exceeds 10mm.
  • 16. Bonds Used in Brick Masonary • Mainly, there are 4 types of bonds used in brick masonary. Stretcher Bond : • The bricks are laid along its length in all courses.
  • 17. Cont.…. Header Bond: • The bricks are laid along its width in all courses. A half and three quarter bat is also used in alternative courses to break the verticality of joints. English Bond: • Alternate courses consist of stretcher and header. A queen closer is put next to quoin header to break the verticality of joints. • Generally such types of bond is provided in walls width is 9 inches
  • 18. Cont.…. English Bond: Flemish Bond: • It also provides good strength. Stretcher and header is provided in each course alternatively. A queen closer is put next to quoin header in each alternate course to break the verticality of joints.
  • 19. Plastering • The term plastering is used to describe thin cover that is applied on the surface of walls. It removes unevenness of surface of walls. Sometimes it is use for decorative purpose also. • The thickness of plaster should be at least 10-15 mm.
  • 20. Building By-Laws • For the construction of any building, certain restrictions are laid down by Municipal bodies, Urban development authorities ,and other government departments as town planning trusts to clear open spaces to be left around the buildings. Plinth Area Regulations: S.no Areaof plot Maximum permissible covered area 1 Less than 200 sq. m 66.66 % of the plot area on the ground. 2 201 to 500 sq. m 50% of the plot area or 133 sq. m whichever is more. 3 501 to 1000 sq. m 40% of the plot area or 250 sq. m whichever is more. 4 More than 1000 sq. m 33.33 % of the plot area or 400 sq. m whichever is more.
  • 21. Cont.…. Open Space Regulations: • Width of street fronting the plot (m) Front open space minimum (m) Upto7.5 1.5 7.5 to 18 3.0 18 to 30 4.5 Above 30 6.0 Rear and Side Open Space: Avg. width = 3 m • At no place less than 1.8 m • Can be reduced to 1.5 m for building ht. <7m
  • 22. Conclusion • Durability of a building depend mainly on proper construction process and proper use of materials. • As per my training ,I have conclude that , during my training days I was familiar with the construction of brick masonry & plastering and other works under a Rajasthan Housing Board project. • Plaster is necessary to cover and protect the masonry from weathering factor.