Logical Framework Analysis




                                                                                                      Guidance Notes No.4
WHAT IS LOGICAL FRAMEWORK ANALYSIS (LFA)?

A log frame (also known as a Project Framework) is a tool for planning and managing development
projects. It looks like a table (or framework) and aims to present information about the key
components of a project in a clear, concise, logical and systematic way. The log frame model was
developed in the United States and has since been adopted and adapted for use by many other
donors, including the Department for International Development (DFID).

A log frame summarises, in a standard format:

        • What the project is going to achieve?

        • What activities will be carried out to achieve its outputs and purpose?

        • What resources (inputs) are required?

        • What are the potential problems which could affect the success of the project?

        • How the progress and ultimate success of the project will be measured and verified?


WHY USE LFA?
                                                          The LFA is a way of describing a
Because most donors prefer it?
                                                          project in a logical way so that it is:
LFA can be a useful tool, both in the planning,
monitoring and evaluation management of
                                                          • Well designed.
development projects. It is not the only planning tool,
and should not be considered an end in itself, but
                                                          • Described objectively.
using it encourages the discipline of clear and
specific thinking about what the project aims to do
                                                          • Can be evaluated.
and how, and highlighting those aspects upon which
success depends.
                                                          • Clearly structured.
LFA also provides a handy summary to inform
project staff, donors, beneficiaries and other stakeholders, which can be referred to
throughout the lifecycle of the project. LFA should not be set in concrete. As the project
circumstances change it will probably need to reflect these changes but everyone involved will
have to be kept informed.

What is so intimidating about using LFA?
Perhaps because we are very conscious of the complexity of development projects, we find it hard
to believe that they can be reduced to one or two sides of A4. Remember that the log frame isn't
intended to show every detail of the project, nor to limit the scope of the project. It is simply a
convenient, logical summary of the key factors of the project.
WHAT DOES THE JARGON MEAN?

Some of the terminology involved in LFA may seem rather intimidating. Do not be put off by the language.
Remember that the goal, purpose, outputs and activities are all objectives but at different levels of the project
hierarchy. Different donors use slightly different terminology, but the logical frameworks are all the same in
principle. You will come across the following terms:




TERM                                MEANING                            EXAMPLE
___________________________________________________________________________________________
Narrative Summary         The goal, purpose, outputs and activities of See below.
                          the project as described in the left-hand
                          column of the logical framework.
                          (the Objectives column)
___________________________________________________________________________________________
Goal                      The ultimate result to which your project    Jamaica’s dominance of
                          is contributing - the impact of the project. competitive bobsledding.
___________________________________________________________________________________________
Purpose                   The change that occurs if the project        Jamaica wins the gold medal
                          outputs are achieved - the effect of the     for bobsledding at the 2002
                          project.                                     Winter Olympics.
___________________________________________________________________________________________
Outputs                   The specifically intended results of the     Team members selected by
                          project activities - used as milestones of   (date).
                          what has been accomplished at various        Team at full fitness by (date) etc.
                          stages during the life of the project.
___________________________________________________________________________________________
Activities                The actual tasks required producing the      Develop training schedule.
                          desired outputs.                             Find practice venue.
                                                                       Publicity campaign to recruit
                                                                       team member, etc.
___________________________________________________________________________________________
Indicators                Also referred to as measurable or            1. Team members capable of
                          objectively verifiable indicators (OVI)      running x metres in x seconds by
                          quantitative and qualitattive ways of        x time.
                          measuring progress and whether project       2. 4 year training schedule,
                          outputs; purpose and goal have been          budget and outcomes developed
                          achieved.                                    and agreed by x, etc.
___________________________________________________________________________________________
Means of                  M.O.V is the information or data             1. Fitness report from team
verification              required to assess progress against          doctor.
                          indicators and their sources.                2. Schedule written and agreed
                                                                       (signed) by coach, team
                                                                       members and team doctor.
___________________________________________________________________________________________
Assumptions               Factors external to the project which are    The Jamaican team qualities for
                          likely to influence the work of the project  the Games.
                          management has little control, and which     It snows enough for the Games
                          need to exist to permit progress to the      to be held, etc.
                          next level in the LFA.
___________________________________________________________________________________________
Super goal                The long-term results of continued           Hot countries seen as serious
                          achievement of the goal of the project.      competitors in winter sports.
___________________________________________________________________________________________
Inputs                    What materials, equipment, financial         Funding, Coach, Bob-sled,
                          and human resources are needed to carry      Snow, Medical Advisor, etc.
                          out the activities of the project?
___________________________________________________________________________________________




                                         BOND Guidance Notes Series                                                 2
WHO SHOULD BE INVOLVED?

The reality of funding proposals and completing log           If the log frame has
frames usually means a desk officer in the UK trying          to be written,
to summarise a project outline for a funding                  adapted or changed
application. However, if used correctly as a planning         in the UK, it is
tool, LFA ought to be developed first by, or working          important to feed the
closely with the person most closely involved in              detail back to
project implementation who will most likely be your           fieldworkers,
project co-ordinator or partner organisation overseas.        partners and other
The project detail can be more easily developed from          relevant
the log frame than the other way round.                       stakeholders
                                                              overseas. The input
Writing log frames in the UK is not participatory, which      to a log frame
has led to criticism of the log frame as a planning           should be a team
tool. Ideally it should be produced 'in country' so that      effort, as much as
during the planning stage participatory approaches            possible.
can be used to feed into the log frame as it is
developed. Whilst project beneficiaries may not
identify easily with the concept of LFA, they may be          If you are not the person closest to the project, it is
able to identify the factors that are critical to project     important to engage that person in developing the log
success, as well as the most appropriate indicators of        frame.
progress. In this way, participatory techniques can be        Always consider:
used to inform LFA.                                           • What impact the objectives & indicators will have on
                                                              their work.
The log frame can also provide a guide as to what             • What is realistically achievable?
information needs to be gathered through participatory        • Will they have enough time to collect the information
processes, and can be enhanced by combining the               you are asking for?
outcomes of other planning tools, such as social              • Are the assumptions are you making realistic to
mapping, wealth ranking, and problem and objective            them? Are you fully aware of their working
trees.                                                        conditions?




           WHAT DO I NEED TO PRODUCE A LOGICAL FRAMEWORK?

           • Supply of large sheets of paper, (preferably flip chart sheets).

           • Pencil, eraser and 'Post-it' notes or cards, so you can adjust and amend as you go along.

           • Somewhere to work without distractions.

           • Ideally, someone to discuss and 'bounce' ideas around with.

           • As much information about the planned project as possible - preferably do it 'on site'.




NOW, WHERE DO I NEED TO START?

Many people find it useful to start by developing a           All the statements must be written in negative terms.
Problem Tree. Try to identify what is the real problem        This will give you a problem tree in which a cause and
the project is to tackle and write it in the middle of a      effect relationship operates from the bottom to the top.
sheet of paper. Then consider the direct causes of the        You may also find it useful to work upwards from the
problem and write them in a horizontal line below the         original problem, identifying its effect etc.
problem.
                                                              Then changing the wording of each item into positive
Next, repeat the process for each of those on another         terms will change the Problem Tree into an Objective
horizontal line and continue to repeat as necessary.          Tree. Next, decide whether the original problem is still
                                          BOND Guidance Notes Series                                                 3
going to be the main focus (or goal) of the project.        information generated in the Objective Tree and:
This may now be higher or lower on the Objective
Tree.                                                       • Start at the top and work down
                                                            The objectives column - what is the project going
Having made that decision, the purpose, outputs and         to achieve?
activities should be present in the next three
horizontal lines of the Objective Tree. It will probably    • Then think laterally
be necessary to decide what to include at this stage,       How can the progress of the project be measured
as the project has to be of a manageable size.              against its objectives?
(See Figure 1 below: A Logical Framework -
DFID model)                                                 • Then reflect back up
                                                            What assumptions are to be included and what are
The key to completing log frames is to use the              their implications?



Figure 1: A Logical Framework (DFID model)
Taken from DFID’s “Guidelines on Humanitarian Assistance”, May 1997


       Objectives                 Measurable               Means of               Important
                                  indicators               verification           assumptions
       GOAL:                                               Cost-effective         (Goal to supergoal)
                                  Quantitative ways of
       Wider problem the                                   methods and            External factors
                                  measuring or
       project will help to                                sources to quantify    necessary to sustain
                                  qualitative ways of
       resolve                                             or assess indicators   objectives in the long
                                  judging timed
                                                                                  run
                                  achievement of goal
       PURPOSE:                   Quantitative ways of     Cost-effective         (Purpose to Goal)
       The immediate impact       measuring or             methods and            External conditions
       on the project area or     qualitative ways of      sources to quantify    necessary if achieved
       target group i.e. the      judging timed            or assess indicators   project purpose is to
       change or benefit to       achievement of                                  contribute to reaching
       be achieved by the         purpose                                         project goal
       project
       OUTPUTS:                   Quantitative ways of     Cost-effective         (Outputs to purpose)
       These are the              measuring or             methods and            Factors out of project
       specifically deliverable   qualitative ways of      sources to quantify    control which, if present,
       results expected from      judging timed            or assess indicators   could restrict progress
       the project to attain      production of outputs                           from outputs to
       the purpose                                                                achieving project
                                                                                  purpose
       ACTIVITIES:                                                                (Activity to output)
                                  INPUTS:
       These are the tasks to                                                     Factors out of project
                                  This is a summary of
       be done to produce                                                         control which, if present,
                                                           Financial out-turn
                                  the project budget
       the outputs                                                                could restrict progress
                                                           report as agreed in
                                                                                  from activities to
                                                           grant agreement
                                                                                  achieving outputs


            DFID describes the Logical Framework as quot;a tool to help designers of projects think
            logically about what the project is trying to achieve (the purpose), what things the
            project needs to do to bring that about (the outputs) and what needs to be done to
            produce these outputs (the activities). The purpose of the project from the DFID
            viewpoint is to serve our higher level objectives (the goal)quot;.

            NOTE: The two boxes in the centre of the quot;Activitiesquot; row are not used for Measurable
            Indicators and Means Of Verification as the progress and success of the Activities are
            measured at the Outputs level. Remember, the Activities are carried out to achieve the
            Outputs. These quot;sparequot; boxes can therefore be used to provide any useful additional
            information such as Inputs and Budgeting requirements.




                                           BOND Guidance Notes Series                                           4
THREE STAGES TO SUCCESS:
STAGE ONE     - TOP DOWN (OBJECTIVES)
STAGE TWO     - WORK ACROSS (MEASURABLE INDICATORS AND MEANS OF
                                  VERIFICATION)
STAGE THREE              - BOTTOM UP (ASSUMPTIONS)


STAGE ONE - TOP DOWN (OBJECTIVES)
1. GOAL                                                     4. ACTIVITIES
Starting at the top and using the information from the      List the activities, which are needed to achieve these
Objective Tree consider the overall goal of the             outputs. There may be several for each output.
project. What issue or problem is the project trying to     Statements should be brief and with an emphasis on
address? The goal may be beyond the reach of this           action words.
project on its own. What ultimate objective is the
project contributing to? This should be a brief             Example
statement or summary.                                       'Hold publicity campaign in (named region) to recruit
                                                            language teachers by (date)'. 'Agree and arrange
Example                                                     selection process & schedule for teacher recruitment
To increase literacy among young people in the sub-         involving existing teaching staff'. 'Hold training
Sahel region.                                               sessions for new teachers covering aims, approach,
                                                            customs, potential problems holding information
2. PURPOSE                                                  sessions, record-keeping, expenses'. 'Arrange
                                                            appropriate accommodation for teachers in each
What final result are you trying to achieve? This is the
                                                            village at least before arrival'. 'Plan and hold meetings
purpose of the project. This should be clear and brief.
                                                            in each village for families with school age children to
                                                            demonstrate the benefits of literacy' etc.
Example
School attendance and literary skills of 6-14 year olds
                                                            5. INPUTS
in (named region) of the sub-Sahel is increased.
                                                            When required to do so provide additional information,
3. OUTPUTS                                                  such as the inputs which are needed to carry out
                                                            these activities. Again, there may be several for each
What are the particular outputs needed to achieve
                                                            activity and it will help to run through each individually,
the Purpose of the project? There may be several
                                                            listing required inputs (resources, equipment, tools,
outputs.
                                                            people). Group the inputs and list each once rather
                                                            than repeatedly. This may include a summary of the
Example
                                                            project budget.
'Five new language teachers recruited and trained.'
'Classes running in all schools at times when
                                                            Example
children are not required to complete family duties.
                                                            Budget, Training space, Accommodation, Support for
''Information sessions for families with school age
                                                            existing teaching staff, Teaching materials, Transport
children held in each village demonstrating benefits of
                                                            to village, Project Co-ordinator / Fieldworker etc.
literacy.'



STAGE TWO - WORK ACROSS (MEASURABLE INDICATORS AND MEANS OF
VERIFICATION)
As you work down each step of your objectives, think:      hierarchy of objectives, begin to work across the log
                                                           frame, identifying the indicators for measuring your
• How the outputs and activities can be measured.          progress. Indicators need to define ‘QQT’, Quality,
• What indicators can be used to measure achievement       Quantity and Timing:
against?
• What information will be needed, and how it can be            Quality   - The kind (or nature) of the
gathered?                                                                   change.
• What problems, obstacles or barriers might arise to           Quantity - The scope (extent) of the
prevent the project from progressing as planned?                            change ie. by how much, how
• How can their impact be minimised?                                        many.
                                                                Timing - By when the change should
6. INDICATORS                                                               have taken place.
Starting either from the top or the bottom of your

                                         BOND Guidance Notes Series                                                  5
There are two kinds of indicators you will need to use:   Using Indicators at the Outputs Level:
                                                          Five language teachers recruited and trained by (date).
Process indicators                                        At least two classes running in all schools at times
Which measure the extent to which you have                when children are not required to complete family
achieved your stated objectives.                          duties by (date). At least three information sessions for
Example                                                   families with school-age children held in each village
How many children attending school by                     demonstrating benefits of literacy by (date).
(specified)time.
                                                          7. INFORMATION SOURCES
Impact indicators
Which help to monitor the achievement and the             Next, try and work out your means of verification for
impact of your work.                                      each indicator. What information will you need, and
Example                                                   how and from where can it be gathered?
How many children pass (specified) literacy test at
(specified) time.                                         Will project staff or others need to keep records, or can
                                                          they get the information from somewhere else?
In addition, indicators can also be:                      Consider the cost implications, if any, and build this into
                                                          the project budget.
Direct
Example                                                   Don't exclude anecdotal evidence (eg. views
The Number of children attending school.                  expressed by project beneficiaries, etc) if this is the
                                                          most appropriate source of information, but remember
Indirect (also known as soft or proxy).                   that donors can be wary of this evidence, and it may
Example                                                   later be necessary to demonstrate your claims!
More books borrowed from the school library -
                                                            Note:
suggesting more children reading, therefore wider
                                                            If you are confused about indicators - don't
literacy.
                                                            panic! Identifying indicators requires some
                                                            practice. Try to find a mentor with more
Examples
                                                            experience who can advise you. Or move on to
Using Indicators at the Purpose level:
                                                            look at means of verification - thinking about what
School attendance of 6-14 year olds is increased by
                                                            information you need, and how to get it, may help
200 per cent within 4 years. 90 per cent 6-14 years
                                                            to define what the indicator should be. If you
olds (in named region) of the sub-Sahel to have
                                                            come up with a long list of possible indicators try
gained (particular level) of literacy skills within 4
                                                            to narrow it down to the essential ones.
years.



STAGE THREE - BOTTOM UP (ASSUMPTIONS)

8. EXTERNAL FACTORS                                       9. DOUBLE CHECK

                                                          Following completion of your log frame, go over it,
What external factors (outside your control) could
                                                          from bottom to top, to check the logic of it:
affect the success of your project or prevent work
from progressing? These may be climatic, political,
                                                          • Will the inputs and activities clearly lead to the
economic, etc. but should be real (possible)
                                                          outputs required to achieve the purpose and
risks rather than a list of everything that could go
                                                          contribute to the goal?
wrong.

                                                          • Will the indicators and means of verification
Reflecting up from the bottom of your log frame,
                                                          effectively measure the progress of the project?
consider how, if each assumption holds, it will
be possible to move to the next stage of the
                                                          • Are the assumptions reasonable or do they indicate
project.
                                                          a level of risk, which suggests that the project is
                                                          unlikely to get off the ground or be completed? (The
Example
                                                          killer assumption)
There are sufficient rains to ensure that children are
not required to replant crops and therefore unable to
                                                          • Is the project staff committed to the objectives and
attend school.
                                                          indicators identified and see them as realistic and
And/or, Sufficient teachers with knowledge of local
                                                          achievable?
dialect are recruited.
And/or, Conflict from neighbouring region doesn't
                                                          • Are there any changes, which could be made which
spread into local area so that emergency needs take
                                                          will make the project it more practical and workable?
precedence over education.

                                           BOND Guidance Notes Series                                              6
10. WRITE IT UP                                             11. STAYING INFORMED

When the log frame has been checked (and                    And still you haven't finished; remember that LFA is a
rechecked) and it is truly logical, and representative of   flexible tool for planning, managing, monitoring and
the project, type (or write) it up onto A4 sheets.          reporting your project. As the project progresses
                                                            and situations change, return to the log frame and
At this point all the relevant stakeholders should          revise it accordingly. Agree these changes with the
have had a chance to contribute to (and agree) the          donor and other stakeholders and keep everyone
completed log frame.                                        informed so that they are able to keep up to date
                                                            with current progress of the project and its future
                                                            direction.




       WANT TO FIND OUT MORE?

       •Gosling L and Edwards M (1995) quot;Toolkits: a practical guide to assessment, monitoring,
       review and evaluationquot; Development Manual 5 pp. 178-192 Save The Children, £6.95 (New
       edition due in March 2003 with updated information on Logical Frameworks)

       • The DFID quot;Guidelines on Humanitarian Assistancequot; published in May 1997 includes guidance on
       preparing log frames, and is available on the DFID web-site at
       http://62.189.42.51./DFIDstage/faqs/files/guidelines_on_humanitarian_assistance_v5.0a.doc

       • DFID Chapter on Logical Frameworks in their Tools for Development series:
       http://62.189.42.51/DFIDstage/FOI/tools/chapter_05_frame.htm

       • The Civil Society Challenge Fund Guidelines 2002 include an Annex C on The Logical
       Framework:
       http://62.189.42.51/DFIDstage/Pubs/files/cscf_guide.htm

       • Akroyd, D. (1995), 'The Logical Framework Approach and the post-evaluation of health
       sector projects by the, African Development Bank', Project Appraisal, 10 (4), Pages 210-222.

       • Akroyd, D. (1995), 'Steps toward the adoption of Logical Framework Approach in the African
       Development Bank: some illustrations for agricultural sector projects', Project Appraisal, 10
       (1), 19-30.

       • Argeetey, E. (1998), 'Consultative processes in community development in Northern Ghana',
       Community Development Journal, 33 (4), 301-33.

       • Cordingley, D. (1995), 'Incorporating the Logical Framework into the Management of
       technical co-operation projects', Project Appraisal, 10 (2), 103-112.

       • Cracknell, B. (1996), 'Evaluating Development Aid', Evaluation, 2 (1) 23-33.

       • Eggers, H. W. (1998), 'Project Cycle Management Revisited', The Courier May/June 1998, 69-
       72, Brussels: European Commission

       • Gasper, D. (1999), 'Problems in the Logical Framework Approach and the challenges for
       Project Cycle Management', The Courier, Jan/Feb 1999, 173, 75-77. Brussels: European
       Commission

       • Jackson, B, Designing Projects and Project Evaluations using the Logical Framework Approach:
       http://iucn.org/themes/eval/english/lfa.htm

       • Nancholas, S. (1998), 'How to (or not to do)... A Logical Framework', Health Policy and Planning,
       13 (2), 189-193.



                                          BOND Guidance Notes Series                                             7
Top Tips

                                                           • Don't leave it to the last minute. Start working
                                                           on your log frame when you begin planning the
                                                           project. You may need to gather information as
                                                           you go along that will be difficult to get later (eg
                                                           baseline data against which to measure
                              ABOUT BOND                   progress).

                                                           •Try and get the person planning and
                          BOND is the network
                          of over 270 UK-                  implementing the project to complete the log
                          based non-                       frame. If this is not possible consider the
                          governmental                     implications of the objectives, indicators &
organisations (NGOs) working in international              verification on field staff and partners.
development and development education.
                                                           • Develop a problem tree. By turning the
BOND aims to improve the extent and quality of             problems into objectives, this should help clarify
the UK and Europe’s contribution to international          the goal, purpose, outputs and activities of your
development, the eradication of global poverty             project.
and the upholding of human rights.
                                                           • Find a mentor with experience of writing log
                                                           frames who can offer you advice & assistance.
The Guidance Notes Series aims to provide
                                                           • If you get stuck, don't panic - move on to the
‘how-to’ information on a variety of topics for the
development sector. This edition also provides             next stage and come back to the tricky bit later.
signposts to resources for those keen to pursue
                                                           • Work in pencil so you can erase things and
the topic further.
                                                           make amendments easily, and use a large sheet
                                                           of paper with plenty of room for 'thinking' then
Disclaimer: BOND’s Guidance Notes aim to                   reduce it down to A4 later.
encourage good practice through practical
                                                           • It is difficult to get it right first time, keep
advice, however, BOND cannot be held
responsible for the outcome of any actions taken           reflecting and revising until you are satisfied that
as a result of the information contained in the            the project is workable and the log frame is
Guidance Notes series.                                     clearly logical!

                                                           • Use the log frame as the basis of the funding
                                                           application and then throughout the project
                                                           lifecycle to track progress and adapt to changing
                                                           situations. You can use the log frame to review
                                                           assumptions and implications, and to keep
                                                           donors and other stakeholders informed of
                                                           significant changes.


Acknowledgements

These guidance notes are drawn from training on LFA conducted for BOND by:
• Laurence Taylor (formerly Tutor Development Studies at Selly Oak Colleges), 37 Yardley Wood Road,
Moseley, Birmingham B13 9JA

• Neil Thin, Department of Social Anthropology, University of Edinburgh, Adam Ferguson Building,
George Square, Edinburgh EH8 9LL

• John Sartain, Tamarind Associates, Trebeck Hall, Bishop's Drive, Southwell, Nottinghamshire NG25
0JP


       © Copyright March 2003: BOND, Regent’s Wharf, 8 All Saints Street, London, N1 9RL Tel: 020 7837 8344
          Fax: 020 7837 4220 Email: bond@bond.org.uk Website: www.bond.org.uk Charity No. 1068839

Mais conteúdo relacionado

Mais procurados

Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKLogical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKMADHUR VERMA
 
Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Agus Suhanto
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessRuffin Veal and Associates, Inc.
 
Project Management Principles and Process
Project Management Principles and ProcessProject Management Principles and Process
Project Management Principles and ProcessCharles Cotter, PhD
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 
Impact assessment , monitoring and evaluation
Impact assessment , monitoring and evaluationImpact assessment , monitoring and evaluation
Impact assessment , monitoring and evaluationSakthivel R
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniquesTata Dinyuy
 
Attributes of Project Manager
Attributes of Project ManagerAttributes of Project Manager
Attributes of Project ManagerKhurram Shakeel
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdfGourhariBiswas1
 
Project management
Project managementProject management
Project managementJay Raval
 
13 project monitoring and evaluation
13 project monitoring and evaluation13 project monitoring and evaluation
13 project monitoring and evaluationrajkpandey2000
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasMazen Zbib
 
Project Management, Planning And Analysis Tools
Project Management, Planning And Analysis ToolsProject Management, Planning And Analysis Tools
Project Management, Planning And Analysis Toolsahmad bassiouny
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management Yesica Adicondro
 
Basics of Project Planning
Basics of Project PlanningBasics of Project Planning
Basics of Project PlanningZilicus
 

Mais procurados (20)

Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKLogical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
 
Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Project Communications Management - PMBOK6
Project Communications Management - PMBOK6
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
Project Management Principles and Process
Project Management Principles and ProcessProject Management Principles and Process
Project Management Principles and Process
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
Impact assessment , monitoring and evaluation
Impact assessment , monitoring and evaluationImpact assessment , monitoring and evaluation
Impact assessment , monitoring and evaluation
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
Attributes of Project Manager
Attributes of Project ManagerAttributes of Project Manager
Attributes of Project Manager
 
Stakeholder management _1
Stakeholder management _1Stakeholder management _1
Stakeholder management _1
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdf
 
Project management
Project managementProject management
Project management
 
13 project monitoring and evaluation
13 project monitoring and evaluation13 project monitoring and evaluation
13 project monitoring and evaluation
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
Lfa
LfaLfa
Lfa
 
Monitoring and Evaluation
Monitoring and EvaluationMonitoring and Evaluation
Monitoring and Evaluation
 
Tools and Techniques for Project Management
Tools and Techniques for Project Management Tools and Techniques for Project Management
Tools and Techniques for Project Management
 
Project Management, Planning And Analysis Tools
Project Management, Planning And Analysis ToolsProject Management, Planning And Analysis Tools
Project Management, Planning And Analysis Tools
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management
 
Basics of Project Planning
Basics of Project PlanningBasics of Project Planning
Basics of Project Planning
 

Destaque

Preparing a logical framework for your project
Preparing a logical framework for your projectPreparing a logical framework for your project
Preparing a logical framework for your projectKarzen & Karzen d.o.o.
 
Lfa Logical Framework Analysis
Lfa   Logical Framework AnalysisLfa   Logical Framework Analysis
Lfa Logical Framework AnalysisJFM Lohith Shetty
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Erik Kijne
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframeWesley Opaki
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalnooone
 
Project cycle management
Project cycle managementProject cycle management
Project cycle managementPK Agrawal
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal WritingTony
 
Proposal format
Proposal formatProposal format
Proposal formatMr SMAK
 
A Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisA Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisTony
 
Lfa problem tree analysis
Lfa   problem tree analysisLfa   problem tree analysis
Lfa problem tree analysisLiris Thomas
 
Training workshop on project cycle management
Training workshop on project cycle management Training workshop on project cycle management
Training workshop on project cycle management mohamed osama hussein
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: IndicatorsTony
 
wfp-opev-philippines-prro200296-evaluation-report
wfp-opev-philippines-prro200296-evaluation-reportwfp-opev-philippines-prro200296-evaluation-report
wfp-opev-philippines-prro200296-evaluation-reportNashrudin Modin
 
Kakuma kenya
Kakuma kenyaKakuma kenya
Kakuma kenyapucmm
 

Destaque (20)

Preparing a logical framework for your project
Preparing a logical framework for your projectPreparing a logical framework for your project
Preparing a logical framework for your project
 
Lfa Logical Framework Analysis
Lfa   Logical Framework AnalysisLfa   Logical Framework Analysis
Lfa Logical Framework Analysis
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframe
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposal
 
Project cycle management
Project cycle managementProject cycle management
Project cycle management
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
 
Proposal format
Proposal formatProposal format
Proposal format
 
LOGICAL FRAMEWORK
LOGICAL FRAMEWORKLOGICAL FRAMEWORK
LOGICAL FRAMEWORK
 
A Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisA Guide to Logical Framework Analysis
A Guide to Logical Framework Analysis
 
Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...
 
Lfa problem tree analysis
Lfa   problem tree analysisLfa   problem tree analysis
Lfa problem tree analysis
 
Project management
Project managementProject management
Project management
 
Training workshop on project cycle management
Training workshop on project cycle management Training workshop on project cycle management
Training workshop on project cycle management
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: Indicators
 
wfp-opev-philippines-prro200296-evaluation-report
wfp-opev-philippines-prro200296-evaluation-reportwfp-opev-philippines-prro200296-evaluation-report
wfp-opev-philippines-prro200296-evaluation-report
 
Kakuma kenya
Kakuma kenyaKakuma kenya
Kakuma kenya
 
Handbook part 1
Handbook part 1Handbook part 1
Handbook part 1
 
RBM and LFA
RBM and LFARBM and LFA
RBM and LFA
 
2. The Logical Framework
2. The Logical Framework2. The Logical Framework
2. The Logical Framework
 

Semelhante a Beginners Guide To Logical Framework Approach (BOND)

Performance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxPerformance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxdanhaley45372
 
CMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting ActivityCMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting Activitytmschaf
 
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docxgilbertkpeters11344
 
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docxgerardkortney
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptxAtulBhagwat6
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET Journal
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1Jonathan Joyce
 
using the logic model for program planning.pdf
using the logic model for program planning.pdfusing the logic model for program planning.pdf
using the logic model for program planning.pdfOuheb Group
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment helpassignmenthelpp
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
 
Proposed project plan template
Proposed project plan templateProposed project plan template
Proposed project plan templateMichelle Joja
 
Group 3 Questions.docx
Group 3 Questions.docxGroup 3 Questions.docx
Group 3 Questions.docxwrite31
 
Group 3 Questions.docx
Group 3 Questions.docxGroup 3 Questions.docx
Group 3 Questions.docxwrite4
 
Global strategy execution and it accountability an accelerator approach
Global strategy execution and it accountability   an accelerator approachGlobal strategy execution and it accountability   an accelerator approach
Global strategy execution and it accountability an accelerator approachReddappa Gowd Bandi
 
How To Develop A Project Management Plan
How To Develop A Project Management PlanHow To Develop A Project Management Plan
How To Develop A Project Management PlanOrangescrum
 
Good scheduling practice
Good scheduling practiceGood scheduling practice
Good scheduling practicekrunalchem
 
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...GlobalSkillup
 

Semelhante a Beginners Guide To Logical Framework Approach (BOND) (20)

Performance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxPerformance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docx
 
CMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting ActivityCMGT 410 Week 1 Supporting Activity
CMGT 410 Week 1 Supporting Activity
 
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
 
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
 
grp 9.pptx
grp 9.pptxgrp 9.pptx
grp 9.pptx
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1
 
Project Management Sample
Project Management SampleProject Management Sample
Project Management Sample
 
using the logic model for program planning.pdf
using the logic model for program planning.pdfusing the logic model for program planning.pdf
using the logic model for program planning.pdf
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
Proposed project plan template
Proposed project plan templateProposed project plan template
Proposed project plan template
 
Group 3 Questions.docx
Group 3 Questions.docxGroup 3 Questions.docx
Group 3 Questions.docx
 
Group 3 Questions.docx
Group 3 Questions.docxGroup 3 Questions.docx
Group 3 Questions.docx
 
Global strategy execution and it accountability an accelerator approach
Global strategy execution and it accountability   an accelerator approachGlobal strategy execution and it accountability   an accelerator approach
Global strategy execution and it accountability an accelerator approach
 
How To Develop A Project Management Plan
How To Develop A Project Management PlanHow To Develop A Project Management Plan
How To Develop A Project Management Plan
 
Good scheduling practice
Good scheduling practiceGood scheduling practice
Good scheduling practice
 
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
 
Assignment
Assignment Assignment
Assignment
 

Mais de rexcris

Go green! go led go solar!
Go green! go led go solar!Go green! go led go solar!
Go green! go led go solar!rexcris
 
Insulated ring terminals
Insulated ring terminalsInsulated ring terminals
Insulated ring terminalsrexcris
 
CDA Citizens Charter
CDA Citizens CharterCDA Citizens Charter
CDA Citizens Charterrexcris
 
Creative eWriting for Basic Education-A Project Profile
Creative eWriting for Basic Education-A Project ProfileCreative eWriting for Basic Education-A Project Profile
Creative eWriting for Basic Education-A Project Profilerexcris
 
The eLearning Club as a Support Strategy in Technology Integration
The eLearning Club as a Support Strategy in Technology IntegrationThe eLearning Club as a Support Strategy in Technology Integration
The eLearning Club as a Support Strategy in Technology Integrationrexcris
 
ICT and Cooperative Learning-Reinventing the Classroom
ICT and Cooperative Learning-Reinventing the ClassroomICT and Cooperative Learning-Reinventing the Classroom
ICT and Cooperative Learning-Reinventing the Classroomrexcris
 
ICT And Cooperative Learning Reinventing The Classroom
ICT And Cooperative Learning   Reinventing The ClassroomICT And Cooperative Learning   Reinventing The Classroom
ICT And Cooperative Learning Reinventing The Classroomrexcris
 
Issues and Prospects in ICT in Education in Continuing Teacher Professional D...
Issues and Prospects in ICT in Education in Continuing Teacher Professional D...Issues and Prospects in ICT in Education in Continuing Teacher Professional D...
Issues and Prospects in ICT in Education in Continuing Teacher Professional D...rexcris
 
Issues and Prospects in Pre-Service Teacher Education
Issues and Prospects in Pre-Service Teacher EducationIssues and Prospects in Pre-Service Teacher Education
Issues and Prospects in Pre-Service Teacher Educationrexcris
 
Status of ICTs in Philippine Basic Education
Status of ICTs in Philippine Basic EducationStatus of ICTs in Philippine Basic Education
Status of ICTs in Philippine Basic Educationrexcris
 
ICTs in the Classroom-Why Use Them
ICTs in the Classroom-Why Use ThemICTs in the Classroom-Why Use Them
ICTs in the Classroom-Why Use Themrexcris
 
Happy Christmas (War is Over)
Happy Christmas (War is Over)Happy Christmas (War is Over)
Happy Christmas (War is Over)rexcris
 
Best Practices on the Practice of Overhead
Best Practices on the Practice of OverheadBest Practices on the Practice of Overhead
Best Practices on the Practice of Overheadrexcris
 
A Local Take on Rich Dad, Poor Dad
A Local Take on Rich Dad, Poor DadA Local Take on Rich Dad, Poor Dad
A Local Take on Rich Dad, Poor Dadrexcris
 
Activity-Based Costing
Activity-Based CostingActivity-Based Costing
Activity-Based Costingrexcris
 
Project Budget And Accounting (BOND)
Project Budget And Accounting (BOND)Project Budget And Accounting (BOND)
Project Budget And Accounting (BOND)rexcris
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluationrexcris
 
ROPMS - Results-Oriented Project Management System
ROPMS - Results-Oriented Project Management SystemROPMS - Results-Oriented Project Management System
ROPMS - Results-Oriented Project Management Systemrexcris
 
Introduksyon sa Microfinance in Filipino
Introduksyon sa Microfinance in FilipinoIntroduksyon sa Microfinance in Filipino
Introduksyon sa Microfinance in Filipinorexcris
 
Business Registration and Licensing
Business Registration and LicensingBusiness Registration and Licensing
Business Registration and Licensingrexcris
 

Mais de rexcris (20)

Go green! go led go solar!
Go green! go led go solar!Go green! go led go solar!
Go green! go led go solar!
 
Insulated ring terminals
Insulated ring terminalsInsulated ring terminals
Insulated ring terminals
 
CDA Citizens Charter
CDA Citizens CharterCDA Citizens Charter
CDA Citizens Charter
 
Creative eWriting for Basic Education-A Project Profile
Creative eWriting for Basic Education-A Project ProfileCreative eWriting for Basic Education-A Project Profile
Creative eWriting for Basic Education-A Project Profile
 
The eLearning Club as a Support Strategy in Technology Integration
The eLearning Club as a Support Strategy in Technology IntegrationThe eLearning Club as a Support Strategy in Technology Integration
The eLearning Club as a Support Strategy in Technology Integration
 
ICT and Cooperative Learning-Reinventing the Classroom
ICT and Cooperative Learning-Reinventing the ClassroomICT and Cooperative Learning-Reinventing the Classroom
ICT and Cooperative Learning-Reinventing the Classroom
 
ICT And Cooperative Learning Reinventing The Classroom
ICT And Cooperative Learning   Reinventing The ClassroomICT And Cooperative Learning   Reinventing The Classroom
ICT And Cooperative Learning Reinventing The Classroom
 
Issues and Prospects in ICT in Education in Continuing Teacher Professional D...
Issues and Prospects in ICT in Education in Continuing Teacher Professional D...Issues and Prospects in ICT in Education in Continuing Teacher Professional D...
Issues and Prospects in ICT in Education in Continuing Teacher Professional D...
 
Issues and Prospects in Pre-Service Teacher Education
Issues and Prospects in Pre-Service Teacher EducationIssues and Prospects in Pre-Service Teacher Education
Issues and Prospects in Pre-Service Teacher Education
 
Status of ICTs in Philippine Basic Education
Status of ICTs in Philippine Basic EducationStatus of ICTs in Philippine Basic Education
Status of ICTs in Philippine Basic Education
 
ICTs in the Classroom-Why Use Them
ICTs in the Classroom-Why Use ThemICTs in the Classroom-Why Use Them
ICTs in the Classroom-Why Use Them
 
Happy Christmas (War is Over)
Happy Christmas (War is Over)Happy Christmas (War is Over)
Happy Christmas (War is Over)
 
Best Practices on the Practice of Overhead
Best Practices on the Practice of OverheadBest Practices on the Practice of Overhead
Best Practices on the Practice of Overhead
 
A Local Take on Rich Dad, Poor Dad
A Local Take on Rich Dad, Poor DadA Local Take on Rich Dad, Poor Dad
A Local Take on Rich Dad, Poor Dad
 
Activity-Based Costing
Activity-Based CostingActivity-Based Costing
Activity-Based Costing
 
Project Budget And Accounting (BOND)
Project Budget And Accounting (BOND)Project Budget And Accounting (BOND)
Project Budget And Accounting (BOND)
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
ROPMS - Results-Oriented Project Management System
ROPMS - Results-Oriented Project Management SystemROPMS - Results-Oriented Project Management System
ROPMS - Results-Oriented Project Management System
 
Introduksyon sa Microfinance in Filipino
Introduksyon sa Microfinance in FilipinoIntroduksyon sa Microfinance in Filipino
Introduksyon sa Microfinance in Filipino
 
Business Registration and Licensing
Business Registration and LicensingBusiness Registration and Licensing
Business Registration and Licensing
 

Último

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 

Último (20)

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 

Beginners Guide To Logical Framework Approach (BOND)

  • 1. Logical Framework Analysis Guidance Notes No.4 WHAT IS LOGICAL FRAMEWORK ANALYSIS (LFA)? A log frame (also known as a Project Framework) is a tool for planning and managing development projects. It looks like a table (or framework) and aims to present information about the key components of a project in a clear, concise, logical and systematic way. The log frame model was developed in the United States and has since been adopted and adapted for use by many other donors, including the Department for International Development (DFID). A log frame summarises, in a standard format: • What the project is going to achieve? • What activities will be carried out to achieve its outputs and purpose? • What resources (inputs) are required? • What are the potential problems which could affect the success of the project? • How the progress and ultimate success of the project will be measured and verified? WHY USE LFA? The LFA is a way of describing a Because most donors prefer it? project in a logical way so that it is: LFA can be a useful tool, both in the planning, monitoring and evaluation management of • Well designed. development projects. It is not the only planning tool, and should not be considered an end in itself, but • Described objectively. using it encourages the discipline of clear and specific thinking about what the project aims to do • Can be evaluated. and how, and highlighting those aspects upon which success depends. • Clearly structured. LFA also provides a handy summary to inform project staff, donors, beneficiaries and other stakeholders, which can be referred to throughout the lifecycle of the project. LFA should not be set in concrete. As the project circumstances change it will probably need to reflect these changes but everyone involved will have to be kept informed. What is so intimidating about using LFA? Perhaps because we are very conscious of the complexity of development projects, we find it hard to believe that they can be reduced to one or two sides of A4. Remember that the log frame isn't intended to show every detail of the project, nor to limit the scope of the project. It is simply a convenient, logical summary of the key factors of the project.
  • 2. WHAT DOES THE JARGON MEAN? Some of the terminology involved in LFA may seem rather intimidating. Do not be put off by the language. Remember that the goal, purpose, outputs and activities are all objectives but at different levels of the project hierarchy. Different donors use slightly different terminology, but the logical frameworks are all the same in principle. You will come across the following terms: TERM MEANING EXAMPLE ___________________________________________________________________________________________ Narrative Summary The goal, purpose, outputs and activities of See below. the project as described in the left-hand column of the logical framework. (the Objectives column) ___________________________________________________________________________________________ Goal The ultimate result to which your project Jamaica’s dominance of is contributing - the impact of the project. competitive bobsledding. ___________________________________________________________________________________________ Purpose The change that occurs if the project Jamaica wins the gold medal outputs are achieved - the effect of the for bobsledding at the 2002 project. Winter Olympics. ___________________________________________________________________________________________ Outputs The specifically intended results of the Team members selected by project activities - used as milestones of (date). what has been accomplished at various Team at full fitness by (date) etc. stages during the life of the project. ___________________________________________________________________________________________ Activities The actual tasks required producing the Develop training schedule. desired outputs. Find practice venue. Publicity campaign to recruit team member, etc. ___________________________________________________________________________________________ Indicators Also referred to as measurable or 1. Team members capable of objectively verifiable indicators (OVI) running x metres in x seconds by quantitative and qualitattive ways of x time. measuring progress and whether project 2. 4 year training schedule, outputs; purpose and goal have been budget and outcomes developed achieved. and agreed by x, etc. ___________________________________________________________________________________________ Means of M.O.V is the information or data 1. Fitness report from team verification required to assess progress against doctor. indicators and their sources. 2. Schedule written and agreed (signed) by coach, team members and team doctor. ___________________________________________________________________________________________ Assumptions Factors external to the project which are The Jamaican team qualities for likely to influence the work of the project the Games. management has little control, and which It snows enough for the Games need to exist to permit progress to the to be held, etc. next level in the LFA. ___________________________________________________________________________________________ Super goal The long-term results of continued Hot countries seen as serious achievement of the goal of the project. competitors in winter sports. ___________________________________________________________________________________________ Inputs What materials, equipment, financial Funding, Coach, Bob-sled, and human resources are needed to carry Snow, Medical Advisor, etc. out the activities of the project? ___________________________________________________________________________________________ BOND Guidance Notes Series 2
  • 3. WHO SHOULD BE INVOLVED? The reality of funding proposals and completing log If the log frame has frames usually means a desk officer in the UK trying to be written, to summarise a project outline for a funding adapted or changed application. However, if used correctly as a planning in the UK, it is tool, LFA ought to be developed first by, or working important to feed the closely with the person most closely involved in detail back to project implementation who will most likely be your fieldworkers, project co-ordinator or partner organisation overseas. partners and other The project detail can be more easily developed from relevant the log frame than the other way round. stakeholders overseas. The input Writing log frames in the UK is not participatory, which to a log frame has led to criticism of the log frame as a planning should be a team tool. Ideally it should be produced 'in country' so that effort, as much as during the planning stage participatory approaches possible. can be used to feed into the log frame as it is developed. Whilst project beneficiaries may not identify easily with the concept of LFA, they may be If you are not the person closest to the project, it is able to identify the factors that are critical to project important to engage that person in developing the log success, as well as the most appropriate indicators of frame. progress. In this way, participatory techniques can be Always consider: used to inform LFA. • What impact the objectives & indicators will have on their work. The log frame can also provide a guide as to what • What is realistically achievable? information needs to be gathered through participatory • Will they have enough time to collect the information processes, and can be enhanced by combining the you are asking for? outcomes of other planning tools, such as social • Are the assumptions are you making realistic to mapping, wealth ranking, and problem and objective them? Are you fully aware of their working trees. conditions? WHAT DO I NEED TO PRODUCE A LOGICAL FRAMEWORK? • Supply of large sheets of paper, (preferably flip chart sheets). • Pencil, eraser and 'Post-it' notes or cards, so you can adjust and amend as you go along. • Somewhere to work without distractions. • Ideally, someone to discuss and 'bounce' ideas around with. • As much information about the planned project as possible - preferably do it 'on site'. NOW, WHERE DO I NEED TO START? Many people find it useful to start by developing a All the statements must be written in negative terms. Problem Tree. Try to identify what is the real problem This will give you a problem tree in which a cause and the project is to tackle and write it in the middle of a effect relationship operates from the bottom to the top. sheet of paper. Then consider the direct causes of the You may also find it useful to work upwards from the problem and write them in a horizontal line below the original problem, identifying its effect etc. problem. Then changing the wording of each item into positive Next, repeat the process for each of those on another terms will change the Problem Tree into an Objective horizontal line and continue to repeat as necessary. Tree. Next, decide whether the original problem is still BOND Guidance Notes Series 3
  • 4. going to be the main focus (or goal) of the project. information generated in the Objective Tree and: This may now be higher or lower on the Objective Tree. • Start at the top and work down The objectives column - what is the project going Having made that decision, the purpose, outputs and to achieve? activities should be present in the next three horizontal lines of the Objective Tree. It will probably • Then think laterally be necessary to decide what to include at this stage, How can the progress of the project be measured as the project has to be of a manageable size. against its objectives? (See Figure 1 below: A Logical Framework - DFID model) • Then reflect back up What assumptions are to be included and what are The key to completing log frames is to use the their implications? Figure 1: A Logical Framework (DFID model) Taken from DFID’s “Guidelines on Humanitarian Assistance”, May 1997 Objectives Measurable Means of Important indicators verification assumptions GOAL: Cost-effective (Goal to supergoal) Quantitative ways of Wider problem the methods and External factors measuring or project will help to sources to quantify necessary to sustain qualitative ways of resolve or assess indicators objectives in the long judging timed run achievement of goal PURPOSE: Quantitative ways of Cost-effective (Purpose to Goal) The immediate impact measuring or methods and External conditions on the project area or qualitative ways of sources to quantify necessary if achieved target group i.e. the judging timed or assess indicators project purpose is to change or benefit to achievement of contribute to reaching be achieved by the purpose project goal project OUTPUTS: Quantitative ways of Cost-effective (Outputs to purpose) These are the measuring or methods and Factors out of project specifically deliverable qualitative ways of sources to quantify control which, if present, results expected from judging timed or assess indicators could restrict progress the project to attain production of outputs from outputs to the purpose achieving project purpose ACTIVITIES: (Activity to output) INPUTS: These are the tasks to Factors out of project This is a summary of be done to produce control which, if present, Financial out-turn the project budget the outputs could restrict progress report as agreed in from activities to grant agreement achieving outputs DFID describes the Logical Framework as quot;a tool to help designers of projects think logically about what the project is trying to achieve (the purpose), what things the project needs to do to bring that about (the outputs) and what needs to be done to produce these outputs (the activities). The purpose of the project from the DFID viewpoint is to serve our higher level objectives (the goal)quot;. NOTE: The two boxes in the centre of the quot;Activitiesquot; row are not used for Measurable Indicators and Means Of Verification as the progress and success of the Activities are measured at the Outputs level. Remember, the Activities are carried out to achieve the Outputs. These quot;sparequot; boxes can therefore be used to provide any useful additional information such as Inputs and Budgeting requirements. BOND Guidance Notes Series 4
  • 5. THREE STAGES TO SUCCESS: STAGE ONE - TOP DOWN (OBJECTIVES) STAGE TWO - WORK ACROSS (MEASURABLE INDICATORS AND MEANS OF VERIFICATION) STAGE THREE - BOTTOM UP (ASSUMPTIONS) STAGE ONE - TOP DOWN (OBJECTIVES) 1. GOAL 4. ACTIVITIES Starting at the top and using the information from the List the activities, which are needed to achieve these Objective Tree consider the overall goal of the outputs. There may be several for each output. project. What issue or problem is the project trying to Statements should be brief and with an emphasis on address? The goal may be beyond the reach of this action words. project on its own. What ultimate objective is the project contributing to? This should be a brief Example statement or summary. 'Hold publicity campaign in (named region) to recruit language teachers by (date)'. 'Agree and arrange Example selection process & schedule for teacher recruitment To increase literacy among young people in the sub- involving existing teaching staff'. 'Hold training Sahel region. sessions for new teachers covering aims, approach, customs, potential problems holding information 2. PURPOSE sessions, record-keeping, expenses'. 'Arrange appropriate accommodation for teachers in each What final result are you trying to achieve? This is the village at least before arrival'. 'Plan and hold meetings purpose of the project. This should be clear and brief. in each village for families with school age children to demonstrate the benefits of literacy' etc. Example School attendance and literary skills of 6-14 year olds 5. INPUTS in (named region) of the sub-Sahel is increased. When required to do so provide additional information, 3. OUTPUTS such as the inputs which are needed to carry out these activities. Again, there may be several for each What are the particular outputs needed to achieve activity and it will help to run through each individually, the Purpose of the project? There may be several listing required inputs (resources, equipment, tools, outputs. people). Group the inputs and list each once rather than repeatedly. This may include a summary of the Example project budget. 'Five new language teachers recruited and trained.' 'Classes running in all schools at times when Example children are not required to complete family duties. Budget, Training space, Accommodation, Support for ''Information sessions for families with school age existing teaching staff, Teaching materials, Transport children held in each village demonstrating benefits of to village, Project Co-ordinator / Fieldworker etc. literacy.' STAGE TWO - WORK ACROSS (MEASURABLE INDICATORS AND MEANS OF VERIFICATION) As you work down each step of your objectives, think: hierarchy of objectives, begin to work across the log frame, identifying the indicators for measuring your • How the outputs and activities can be measured. progress. Indicators need to define ‘QQT’, Quality, • What indicators can be used to measure achievement Quantity and Timing: against? • What information will be needed, and how it can be Quality - The kind (or nature) of the gathered? change. • What problems, obstacles or barriers might arise to Quantity - The scope (extent) of the prevent the project from progressing as planned? change ie. by how much, how • How can their impact be minimised? many. Timing - By when the change should 6. INDICATORS have taken place. Starting either from the top or the bottom of your BOND Guidance Notes Series 5
  • 6. There are two kinds of indicators you will need to use: Using Indicators at the Outputs Level: Five language teachers recruited and trained by (date). Process indicators At least two classes running in all schools at times Which measure the extent to which you have when children are not required to complete family achieved your stated objectives. duties by (date). At least three information sessions for Example families with school-age children held in each village How many children attending school by demonstrating benefits of literacy by (date). (specified)time. 7. INFORMATION SOURCES Impact indicators Which help to monitor the achievement and the Next, try and work out your means of verification for impact of your work. each indicator. What information will you need, and Example how and from where can it be gathered? How many children pass (specified) literacy test at (specified) time. Will project staff or others need to keep records, or can they get the information from somewhere else? In addition, indicators can also be: Consider the cost implications, if any, and build this into the project budget. Direct Example Don't exclude anecdotal evidence (eg. views The Number of children attending school. expressed by project beneficiaries, etc) if this is the most appropriate source of information, but remember Indirect (also known as soft or proxy). that donors can be wary of this evidence, and it may Example later be necessary to demonstrate your claims! More books borrowed from the school library - Note: suggesting more children reading, therefore wider If you are confused about indicators - don't literacy. panic! Identifying indicators requires some practice. Try to find a mentor with more Examples experience who can advise you. Or move on to Using Indicators at the Purpose level: look at means of verification - thinking about what School attendance of 6-14 year olds is increased by information you need, and how to get it, may help 200 per cent within 4 years. 90 per cent 6-14 years to define what the indicator should be. If you olds (in named region) of the sub-Sahel to have come up with a long list of possible indicators try gained (particular level) of literacy skills within 4 to narrow it down to the essential ones. years. STAGE THREE - BOTTOM UP (ASSUMPTIONS) 8. EXTERNAL FACTORS 9. DOUBLE CHECK Following completion of your log frame, go over it, What external factors (outside your control) could from bottom to top, to check the logic of it: affect the success of your project or prevent work from progressing? These may be climatic, political, • Will the inputs and activities clearly lead to the economic, etc. but should be real (possible) outputs required to achieve the purpose and risks rather than a list of everything that could go contribute to the goal? wrong. • Will the indicators and means of verification Reflecting up from the bottom of your log frame, effectively measure the progress of the project? consider how, if each assumption holds, it will be possible to move to the next stage of the • Are the assumptions reasonable or do they indicate project. a level of risk, which suggests that the project is unlikely to get off the ground or be completed? (The Example killer assumption) There are sufficient rains to ensure that children are not required to replant crops and therefore unable to • Is the project staff committed to the objectives and attend school. indicators identified and see them as realistic and And/or, Sufficient teachers with knowledge of local achievable? dialect are recruited. And/or, Conflict from neighbouring region doesn't • Are there any changes, which could be made which spread into local area so that emergency needs take will make the project it more practical and workable? precedence over education. BOND Guidance Notes Series 6
  • 7. 10. WRITE IT UP 11. STAYING INFORMED When the log frame has been checked (and And still you haven't finished; remember that LFA is a rechecked) and it is truly logical, and representative of flexible tool for planning, managing, monitoring and the project, type (or write) it up onto A4 sheets. reporting your project. As the project progresses and situations change, return to the log frame and At this point all the relevant stakeholders should revise it accordingly. Agree these changes with the have had a chance to contribute to (and agree) the donor and other stakeholders and keep everyone completed log frame. informed so that they are able to keep up to date with current progress of the project and its future direction. WANT TO FIND OUT MORE? •Gosling L and Edwards M (1995) quot;Toolkits: a practical guide to assessment, monitoring, review and evaluationquot; Development Manual 5 pp. 178-192 Save The Children, £6.95 (New edition due in March 2003 with updated information on Logical Frameworks) • The DFID quot;Guidelines on Humanitarian Assistancequot; published in May 1997 includes guidance on preparing log frames, and is available on the DFID web-site at http://62.189.42.51./DFIDstage/faqs/files/guidelines_on_humanitarian_assistance_v5.0a.doc • DFID Chapter on Logical Frameworks in their Tools for Development series: http://62.189.42.51/DFIDstage/FOI/tools/chapter_05_frame.htm • The Civil Society Challenge Fund Guidelines 2002 include an Annex C on The Logical Framework: http://62.189.42.51/DFIDstage/Pubs/files/cscf_guide.htm • Akroyd, D. (1995), 'The Logical Framework Approach and the post-evaluation of health sector projects by the, African Development Bank', Project Appraisal, 10 (4), Pages 210-222. • Akroyd, D. (1995), 'Steps toward the adoption of Logical Framework Approach in the African Development Bank: some illustrations for agricultural sector projects', Project Appraisal, 10 (1), 19-30. • Argeetey, E. (1998), 'Consultative processes in community development in Northern Ghana', Community Development Journal, 33 (4), 301-33. • Cordingley, D. (1995), 'Incorporating the Logical Framework into the Management of technical co-operation projects', Project Appraisal, 10 (2), 103-112. • Cracknell, B. (1996), 'Evaluating Development Aid', Evaluation, 2 (1) 23-33. • Eggers, H. W. (1998), 'Project Cycle Management Revisited', The Courier May/June 1998, 69- 72, Brussels: European Commission • Gasper, D. (1999), 'Problems in the Logical Framework Approach and the challenges for Project Cycle Management', The Courier, Jan/Feb 1999, 173, 75-77. Brussels: European Commission • Jackson, B, Designing Projects and Project Evaluations using the Logical Framework Approach: http://iucn.org/themes/eval/english/lfa.htm • Nancholas, S. (1998), 'How to (or not to do)... A Logical Framework', Health Policy and Planning, 13 (2), 189-193. BOND Guidance Notes Series 7
  • 8. Top Tips • Don't leave it to the last minute. Start working on your log frame when you begin planning the project. You may need to gather information as you go along that will be difficult to get later (eg baseline data against which to measure ABOUT BOND progress). •Try and get the person planning and BOND is the network of over 270 UK- implementing the project to complete the log based non- frame. If this is not possible consider the governmental implications of the objectives, indicators & organisations (NGOs) working in international verification on field staff and partners. development and development education. • Develop a problem tree. By turning the BOND aims to improve the extent and quality of problems into objectives, this should help clarify the UK and Europe’s contribution to international the goal, purpose, outputs and activities of your development, the eradication of global poverty project. and the upholding of human rights. • Find a mentor with experience of writing log frames who can offer you advice & assistance. The Guidance Notes Series aims to provide • If you get stuck, don't panic - move on to the ‘how-to’ information on a variety of topics for the development sector. This edition also provides next stage and come back to the tricky bit later. signposts to resources for those keen to pursue • Work in pencil so you can erase things and the topic further. make amendments easily, and use a large sheet of paper with plenty of room for 'thinking' then Disclaimer: BOND’s Guidance Notes aim to reduce it down to A4 later. encourage good practice through practical • It is difficult to get it right first time, keep advice, however, BOND cannot be held responsible for the outcome of any actions taken reflecting and revising until you are satisfied that as a result of the information contained in the the project is workable and the log frame is Guidance Notes series. clearly logical! • Use the log frame as the basis of the funding application and then throughout the project lifecycle to track progress and adapt to changing situations. You can use the log frame to review assumptions and implications, and to keep donors and other stakeholders informed of significant changes. Acknowledgements These guidance notes are drawn from training on LFA conducted for BOND by: • Laurence Taylor (formerly Tutor Development Studies at Selly Oak Colleges), 37 Yardley Wood Road, Moseley, Birmingham B13 9JA • Neil Thin, Department of Social Anthropology, University of Edinburgh, Adam Ferguson Building, George Square, Edinburgh EH8 9LL • John Sartain, Tamarind Associates, Trebeck Hall, Bishop's Drive, Southwell, Nottinghamshire NG25 0JP © Copyright March 2003: BOND, Regent’s Wharf, 8 All Saints Street, London, N1 9RL Tel: 020 7837 8344 Fax: 020 7837 4220 Email: bond@bond.org.uk Website: www.bond.org.uk Charity No. 1068839