SlideShare a Scribd company logo
1 of 56
®



    Dennis Reilly Arch/SE
    POSTEN Engineering Systems
In the last 100 years, the
Population of the World
has grown from 2 billion
to 6.5 billion people.

With the highest standard
of living in the World, the
United States consumes 25%
of the World’s Natural Resources.

If the rest of the World lived
by our standards (which they
trying to do), we would need
5 planet Earths to sustain us.
                                    Population growth over the last 2,000 years
    New Mandatory Regulations:
      Across the country, Cities, Counties and States are
     creating (& in some cases already mandating)
     Regulations, which require compliance with GREEN
     Building or LEED standards.
It just makes sense:
    Sustainable Design of Post-tensioned Structures
     saves money and increases overall building efficiency;
    While Sustainable Design of other structural building
     materials normally requires new construction methods
     or structural systems that lack a track record &, as a
     result, increase Professional Liability Risk,
      Sustainable Post-tensioning means simply designing
     efficiently to get the most from a well tested system,
     with a 40 year track record.
  Reduce  the slab or beam thickness to it’s
   minimum;
  Reduce the amount of steel used; and

  With that in mind, as much as possible,
   promote the use of Moment Frame Structures,
   instead of Shear Wall Structures, which saves
   concrete & steel.
    Even an inefficient Post-tensioned structure uses less
     concrete & steel than Reinforced Concrete.         So,
     shouldn’t Post-tensioning already be Sustainable?
    To be honest - No!! As shown in the first slide, the
     Standard of Care is NOT Sustainable. Because of the
     cost of steel and concrete, Post-tensioning is already
     the Standard of Care.
    What is required for Sustainability is to reduce the use
     of concrete & steel & maximize the efficiency of the
     building.
Carbon Footprint
(How much Carbon Dioxide is
released to the Environment in the
manufacture, delivery of materials
& long term use of the building)

           Solid Waste
          Resource Use
Energy Use (aka Embodied Energy)
         Water Polution
           Air Pollution
                                     Carbon Footprint of Materials
Concrete:
  If you could reduce the thickness of a typical 150 ft x 300 ft
  concrete slab by just 1”, you would reduce the Carbon
  Emissions from it’s manufacture by the same amount as is
  produced by 4 automobiles in one year.
Steel:
   Steel is the real culprit, making Conventionally Reinforced
  Concrete Buildings & Especially Steel Frame Buildings
  inherently Non-Green. Reducing Steel Use is Paramount!
Let’s look at
a typical
Interior Bay
Flat Plate
To illustrate the stark difference between Post-
tensioned Concrete & Reinforced Concrete:
Compared to an
Efficiently designed 8.5” thick Post-tensioned
slab,
the comparable Conventionally Reinforced
Concrete Slab is 12” thick with a lot of rebar.
Span 2 – Reinf. Conc. Flat Slab Output
12” CONC. SLAB W/480 FT
OF #5 REBAR PER SPAN

This is why we Post-tension in
the first place!
Now - The Path to Sustainable Design:
Stage One: Reduce the Amount of Concrete used.
Using POSTEN Multistory,
The “Auto Depth Option” automatically determines
the thinnest slab section possible based upon the
minimum Effective Pre-stress at the specific “User
selected” spans &, with that, provides a full design.
POSTEN
Multistory   Design Procedures 1, 2 & 3
Computer
             Automatically produce an
Input        Efficient Design of the
             Rebar, Tendons & Drapes

             We will use Design Procedure 1,
             using
             Allowable Tensile Strength
             as our Control.
POSTEN
  Multistory
  Computer
  Input

The Auto Depth Option
determines the
thinnest Concrete
section possible &
Proceeds with a full
design.
POSTEN
  Multistory
  Computer
  Input


To improve efficiency,
we will allow the
program to add
pre-stress at the
outer spans, if
necessary.
POSTEN
  Multistory
  Computer
  Input


We will start out with a
9.5” thick slab and see
if we can reduce the
Thickness of this slab.
Minimum
Thickness
Output


            The Output shows that POSTEN reduced the slab thickness
            from 9.5” to 8.5”
            (A savings of 1” in slab thickness) and proceeded with the
            design of the thinner slab.
Span 2 - Minimum Thickness Output
Span 2 - Minimum Thickness Output
Span 2 -
Minimum
Thickness
Output
Now that we have reduced our Carbon
Footprint, by minimizing the thickness of the
slab,

the Next Step,

Reduce the amount of Steel used.
From analyzing Post-tensioning designs, we learned
that at interior spans and cantilevers there are usually
residual compressive stresses remaining at the
tension faces.

By analyzing & Balancing the Stresses in the sections,
the efficiency of the tendons can be maximized,
resulting in less steel.
POSTEN Multistory’s
“Drape & Pre-stress Optimization” algorithms starts
out by performing an Efficient Proportional Load
Balancing Design. Once this design is completed, the
program immediately proceeds with 10 cycles of
balancing the stresses in the sections, thereby
creating the most efficient design.
Since “Drape & Pre-stress Optimization” starts out
with Proportional Load Balancing, the program knows
how much steel was required by Proportional Load
Balancing, and as a result, prints out the amount of
steel saved in the process of Stress Balancing.
 Sometimes the savings is significant and sometimes the
savings is minor. Normally, there is a savings.
Using the same computer input from Example 2,
we need only turn off the “Auto Depth Option”, turn on
the “Drape & Pre-stress Optimization Option” and re-
run the program to get the Sustainable Design (with
both the minimum concrete & steel).
Clear Auto Depth Option


POSTEN
Multistory
Computer
Input
POSTEN
  Multistory
  Computer
  Input


Select
“Drape & Pre-stress
Optimization”
& run the design.
This output shows the percentage of savings (9.2%) of steel that was saved by
Performing Stress Balancing (above & beyond the Efficient Design produced by
POSTEN’s Proportional Load Balancing).




                          Minimum Steel Output
Span 2 - Minimum Steel Output
Span 2 - Minimum Steel Output
Span 2 - Minimum Steel Output
Our Sustainable Design Resulted from:
    Determining the Thinnest Section of Slab or Beam
     (saving 1” in the post-tension design or saving 3.5”
     when compared to Conventional Reinf. Conc.)
    Determining the least amount of Steel through Stress
     Balancing (saving an additional 9% of the steel)
POSTEN’s Automatic LEED Documentation
SLAB OR FLAT PLATE SCHEDULE
(SEE TYPICAL DETAIL FOR NOTATION)
 NAME      SPAN   WIDTH   DEPTH   TOP LEFT   TOP RIGHT   BOT "BM"   END DIST   BOT "BX"   ANCH'D
 s1        30.00 192.00   12.00        6#5       17#5         8#5   "D.F.L."        3#5   ENDS?
NOMINAL LENGTH, "NL"               5.2 FT     9.8 FT     18.4 FT     3.6 FT    27.3 FT    NONE

 NAME      SPAN   WIDTH   DEPTH   TOP LEFT   TOP RIGHT   BOT "BM"   END DIST   BOT "BX"   ANCH'D
 s2        32.00 192.00   12.00       17#5       15#5         6#5   "D.F.L."        2#5   ENDS?
NOMINAL LENGTH, "NL"              10.2 FT     9.5 FT     17.4 FT     7.9 FT    29.3 FT    NONE

 NAME      SPAN   WIDTH   DEPTH   TOP LEFT   TOP RIGHT   BOT "BM"   END DIST   BOT "BX"   ANCH'D
 s3    R. 32.00 192.00    12.00       15#5       17#5         6#5   "D.F.L."        2#5   ENDS?
NOMINAL LENGTH, "NL"               9.5 FT    10.1 FT     17.6 FT     6.7 FT    29.3 FT    NONE

 NAME      SPAN   WIDTH   DEPTH   TOP LEFT   TOP RIGHT   BOT "BM"   END DIST   BOT "BX"   ANCH'D
  END      30.00 192.00   12.00       17#5       42#5         8#5   "D.F.L."        3#5   ENDS?
NOMINAL LENGTH, "NL"               9.7 FT     5.6 FT     18.5 FT     7.9 FT    27.3 FT    NONE
POSTEN’s Automatic LEED Documentation
SLAB OR FLAT PLATE SCHEDULE
(SEE TYPICAL DETAIL FOR NOTATION)

BAR LENGTHS SHOWN ARE NOMINAL LENGTHS, PRIOR TO ADDING ANCHORAGE FOR FULL BAR DEVELOPMENT.

NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES
L1  30.00 288.00 8.50  4#5      5#5                "D.F.L."          ENDS?                     STRESS L. MID. R.
NOMINAL LENGTH, "NL"   5.3 FT   9.8 FT                               NONE                      514.K 4.2 1.4 7.1

NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES
L2   32.00 288.00 8.50 5#5      4#5                "D.F.L."         ENDS?                     STRESS L. MID. R.
NOMINAL LENGTH, "NL"   10.1 FT 9.5 FT                               NONE                       439.K 7.1 1.4 7.1

NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES
L3   32.00 288.00 8.50 4#5      4#5                "D.F.L."         ENDS?                     STRESS L. MID. R.
NOMINAL LENGTH, "NL"   9.5 FT  10.0 FT                              NONE                       439.K 7.1 1.4 7.1

NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES
END 30.00 288.00 8.50  4#5      4#5                "D.F.L."         ENDS?                     STRESS L. MID. R.
NOMINAL LENGTH, "NL"   9.7 FT   6.3 FT                              NONE                       495.K 7.1 1.4 4.6
POSTEN’s Automatic LEED Documentation
SLAB OR FLAT PLATE SCHEDULE
(SEE TYPICAL DETAIL FOR NOTATION)
BAR LENGTHS SHOWN ARE NOMINAL LENGTHS, PRIOR TO ADDING ANCHORAGE FOR FULL BAR DEVELOPMENT.

NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES
L1  30.00 288.00 8.50  4#5      4#5                "D.F.L."          ENDS?                     STRESS L. MID. R.
NOMINAL LENGTH, "NL"   5.3 FT   9.8 FT                               NONE                      512.K 4.2 1.4 7.1

NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES
L2   32.00 288.00 8.50 4#5      5#5                "D.F.L."         ENDS?                     STRESS L. MID. R.
NOMINAL LENGTH, "NL"   10.1 FT 9.5 FT                               NONE                       370.K 7.1 1.4 7.1

NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES
L3   32.00 288.00 8.50 5#5      4#5                "D.F.L."         ENDS?                     STRESS L. MID. R.
NOMINAL LENGTH, "NL"   9.5 FT  10.0 FT                              NONE                       370.K 7.1 1.4 7.1

NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES
END 30.00 288.00 8.50  4#5      4#5                "D.F.L."         ENDS?                     STRESS L. MID. R.
NOMINAL LENGTH, "NL"   9.7 FT   6.3 FT                              NONE                       475.K 7.1 1.4 4.2
POSTEN’s Automatic LEED Documentation


Minimum
Thickness
Output
POSTEN’s Automatic LEED Documentation
&
Ultimately
Minimum
Steel
Output
Using POSTEN Multistory,
Post-tensioned Moment
Frames Preserved the
Historic Fabric of this
National Historic
Landmark.

     ®
When designing for Wind or Seismic Forces, the
  Post-tensioned Concrete Moment Frame
  Structure is the Sustainable Alternative.
  Using  less Steel and Concrete; and
  Significantly    improving    overall    building
   efficiency by eliminating shear walls.
To do this:
  The    columns must be accurately designed
   simultaneously with the Post-tensioned floors and roof,
   using    the    correct    columns      stiffness’s   (not
   approximations);
  The correct wind or seismic lateral forces (along with the
   P-delta magnification factors) must be inputted into the
   Post-tensioned floors & roof designs; and
  Correct design procedures must be used to design the
   Moment Frame
To obtain the correct Lateral (Wind or Seismic)
   Forces, the Magnification Factors for P-Delta
   and/or the correct Column Stiffness’s (floor by
   floor) – we recommend using a Multistory
   Concrete Frame Analysis Program, such as:
  ETABS by CSI or
  EZframe by POSTEN Engineering Systems
We strongly recommend against Finite Element Analysis
POSTEN
Multistory
Computer
Input




             In this example, each floor level is designed, one level
             at a time, based upon the lateral forces & P-delta
             magnification factors from a 2nd order Multistory
             Frame Analysis for the full structure.
POSTEN
     Multistory
     Computer
     Input

Moment Frames are
designed by
Activating
Q5 – First Order Design
Q7 - Gravity Force Design
or
Q9 – Second Order Design
POSTEN
   Multistory
   Computer
   Input
Two additional Input
Screens appear to
include the Column
Properties, Design Criteria,
Lateral Forces &
Magnification Factors
For Post-tensioned
Moment Frame Design.
POSTEN
Multistory
Computer
Input
Span 1 Beam – Moment Frame Design
Span 2 Beam – Moment Frame Design
Span 3 Beam – Moment Frame Design
Columns – Moment Frame Design
POSTEN
Multistory
Computer
Graphic Output

Span 1 of 3
Post-tensioned
Moment Frame
POSTEN
Multistory
Computer
Graphic Output

Span 2 of 3
Post-tensioned
Moment Frame
POSTEN
Multistory
Computer
Graphic Output

Span 3 of 3
Post-tensioned
Moment Frame
Sustainable Post-tensioning Advantages
  Less Weight
  Less Steel
  Lower Building Height or Higher Building
   Volume
  Lower Construction Cost
  Lower Carbon Footprint
  Lower Embodied Energy, Waste & Pollution
Despite Post-tensioning’s inherent advantages
   over Reinforced Concrete & Steel Frame,
   Sustainability additionally requires:
  Minimizing Materials (i.e. conc. & steel);

  Maximizing Efficiency (thin sections, stress
   analysis &/or moment frames); and
  The Proper Documentation to back it up.

Post-tensioning can provide it all – Like No Other.
Thank you for listening.


              ®

                       Dennis Reilly Arch/SE
                       POSTEN Engineering Systems
                       510-275-4750
                       sales@postensoft.com
                       www.postensoft.com
                       www.postensoft.blogspot.com

More Related Content

Similar to Sustainability Advantage of Post-tensioning in Buildings

PCB manufacture design rule
PCB manufacture design rulePCB manufacture design rule
PCB manufacture design ruleJane Soong
 
Visual Dictionary - Archess
Visual Dictionary - ArchessVisual Dictionary - Archess
Visual Dictionary - ArchessArchess
 
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputCasing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputGaurav Singh Rajput
 
casing-design for drilling engineering-2005.ppt
casing-design for drilling engineering-2005.pptcasing-design for drilling engineering-2005.ppt
casing-design for drilling engineering-2005.pptmohammedsaaed1
 
Wood House Presentation.pdf
Wood House Presentation.pdfWood House Presentation.pdf
Wood House Presentation.pdfssuserc95113
 
4 bit cmos full adder in submicron technology with low leakage and groun...
4 bit  cmos  full  adder  in submicron  technology with low leakage and groun...4 bit  cmos  full  adder  in submicron  technology with low leakage and groun...
4 bit cmos full adder in submicron technology with low leakage and groun...shireesha pallepati
 
STEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdfSTEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdfAdnan Lazem
 
1pre_engineered_building_system
1pre_engineered_building_system1pre_engineered_building_system
1pre_engineered_building_systemManju natha
 
pressreleasescurprurl1579103474899626198.pdf
pressreleasescurprurl1579103474899626198.pdfpressreleasescurprurl1579103474899626198.pdf
pressreleasescurprurl1579103474899626198.pdfFatemehDehghan12
 
True Value 12 9 09 Meeting Final
True Value 12 9 09 Meeting FinalTrue Value 12 9 09 Meeting Final
True Value 12 9 09 Meeting Finalguestf16575
 
Coeso (hpl compact postforming) worldwide project presentation pl spa (abet...
Coeso (hpl compact postforming)   worldwide project presentation pl spa (abet...Coeso (hpl compact postforming)   worldwide project presentation pl spa (abet...
Coeso (hpl compact postforming) worldwide project presentation pl spa (abet...Renato Viganò
 
Reduction of backpressure by subham
Reduction of backpressure by subhamReduction of backpressure by subham
Reduction of backpressure by subhamSubham kumar
 
Visual dictionary-Sp10Ashlar
Visual dictionary-Sp10AshlarVisual dictionary-Sp10Ashlar
Visual dictionary-Sp10AshlarSp10Ashlar
 
Clinic update.pdf
Clinic update.pdfClinic update.pdf
Clinic update.pdfNayMin39
 
Moving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building EnclosuresMoving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building EnclosuresRDH Building Science
 
ASEP Steel Handbook
ASEP Steel HandbookASEP Steel Handbook
ASEP Steel HandbookMonique Carr
 
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptxLecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptxAbelMulugeta8
 

Similar to Sustainability Advantage of Post-tensioning in Buildings (20)

PCB manufacture design rule
PCB manufacture design rulePCB manufacture design rule
PCB manufacture design rule
 
Visual Dictionary - Archess
Visual Dictionary - ArchessVisual Dictionary - Archess
Visual Dictionary - Archess
 
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputCasing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
 
casing-design for drilling engineering-2005.ppt
casing-design for drilling engineering-2005.pptcasing-design for drilling engineering-2005.ppt
casing-design for drilling engineering-2005.ppt
 
Casing_Design(1).ppt
Casing_Design(1).pptCasing_Design(1).ppt
Casing_Design(1).ppt
 
Wood House Presentation.pdf
Wood House Presentation.pdfWood House Presentation.pdf
Wood House Presentation.pdf
 
4 bit cmos full adder in submicron technology with low leakage and groun...
4 bit  cmos  full  adder  in submicron  technology with low leakage and groun...4 bit  cmos  full  adder  in submicron  technology with low leakage and groun...
4 bit cmos full adder in submicron technology with low leakage and groun...
 
STEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdfSTEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdf
 
Audiotorium Calcs.pdf
Audiotorium Calcs.pdfAudiotorium Calcs.pdf
Audiotorium Calcs.pdf
 
1pre_engineered_building_system
1pre_engineered_building_system1pre_engineered_building_system
1pre_engineered_building_system
 
pressreleasescurprurl1579103474899626198.pdf
pressreleasescurprurl1579103474899626198.pdfpressreleasescurprurl1579103474899626198.pdf
pressreleasescurprurl1579103474899626198.pdf
 
True Value 12 9 09 Meeting Final
True Value 12 9 09 Meeting FinalTrue Value 12 9 09 Meeting Final
True Value 12 9 09 Meeting Final
 
Coeso (hpl compact postforming) worldwide project presentation pl spa (abet...
Coeso (hpl compact postforming)   worldwide project presentation pl spa (abet...Coeso (hpl compact postforming)   worldwide project presentation pl spa (abet...
Coeso (hpl compact postforming) worldwide project presentation pl spa (abet...
 
Deformation Machining
Deformation MachiningDeformation Machining
Deformation Machining
 
Reduction of backpressure by subham
Reduction of backpressure by subhamReduction of backpressure by subham
Reduction of backpressure by subham
 
Visual dictionary-Sp10Ashlar
Visual dictionary-Sp10AshlarVisual dictionary-Sp10Ashlar
Visual dictionary-Sp10Ashlar
 
Clinic update.pdf
Clinic update.pdfClinic update.pdf
Clinic update.pdf
 
Moving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building EnclosuresMoving Towards More Energy Efficient Wood Frame Building Enclosures
Moving Towards More Energy Efficient Wood Frame Building Enclosures
 
ASEP Steel Handbook
ASEP Steel HandbookASEP Steel Handbook
ASEP Steel Handbook
 
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptxLecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
Lecture-7-Detailing-PHG-A1-Rev-10-2-Nov-16-Print.pptx
 

More from Dennis Reilly

San Leandro High School
San Leandro High SchoolSan Leandro High School
San Leandro High SchoolDennis Reilly
 
California Pediatric Emergency Dept
California Pediatric Emergency DeptCalifornia Pediatric Emergency Dept
California Pediatric Emergency DeptDennis Reilly
 
Jarrett Residence Expansion
Jarrett Residence ExpansionJarrett Residence Expansion
Jarrett Residence ExpansionDennis Reilly
 
Consolidated Properties
Consolidated PropertiesConsolidated Properties
Consolidated PropertiesDennis Reilly
 
Childrens Hospital Lab
Childrens Hospital LabChildrens Hospital Lab
Childrens Hospital LabDennis Reilly
 
Vacaville Waste Water Treatment Plant
Vacaville Waste Water Treatment PlantVacaville Waste Water Treatment Plant
Vacaville Waste Water Treatment PlantDennis Reilly
 
Herrick Circle Drive
Herrick Circle DriveHerrick Circle Drive
Herrick Circle DriveDennis Reilly
 

More from Dennis Reilly (11)

San Leandro High School
San Leandro High SchoolSan Leandro High School
San Leandro High School
 
California Pediatric Emergency Dept
California Pediatric Emergency DeptCalifornia Pediatric Emergency Dept
California Pediatric Emergency Dept
 
Arioso Apartments
Arioso ApartmentsArioso Apartments
Arioso Apartments
 
Vizcaya Townhomes
Vizcaya TownhomesVizcaya Townhomes
Vizcaya Townhomes
 
Jarrett Residence Expansion
Jarrett Residence ExpansionJarrett Residence Expansion
Jarrett Residence Expansion
 
Oriental Warehouse
Oriental WarehouseOriental Warehouse
Oriental Warehouse
 
Consolidated Properties
Consolidated PropertiesConsolidated Properties
Consolidated Properties
 
John Le Building
John Le BuildingJohn Le Building
John Le Building
 
Childrens Hospital Lab
Childrens Hospital LabChildrens Hospital Lab
Childrens Hospital Lab
 
Vacaville Waste Water Treatment Plant
Vacaville Waste Water Treatment PlantVacaville Waste Water Treatment Plant
Vacaville Waste Water Treatment Plant
 
Herrick Circle Drive
Herrick Circle DriveHerrick Circle Drive
Herrick Circle Drive
 

Recently uploaded

A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...itnewsafrica
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkPixlogix Infotech
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesBernd Ruecker
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 

Recently uploaded (20)

A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App Framework
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architectures
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 

Sustainability Advantage of Post-tensioning in Buildings

  • 1. ® Dennis Reilly Arch/SE POSTEN Engineering Systems
  • 2. In the last 100 years, the Population of the World has grown from 2 billion to 6.5 billion people. With the highest standard of living in the World, the United States consumes 25% of the World’s Natural Resources. If the rest of the World lived by our standards (which they trying to do), we would need 5 planet Earths to sustain us. Population growth over the last 2,000 years
  • 3.   New Mandatory Regulations: Across the country, Cities, Counties and States are creating (& in some cases already mandating) Regulations, which require compliance with GREEN Building or LEED standards.
  • 4. It just makes sense:   Sustainable Design of Post-tensioned Structures saves money and increases overall building efficiency;   While Sustainable Design of other structural building materials normally requires new construction methods or structural systems that lack a track record &, as a result, increase Professional Liability Risk, Sustainable Post-tensioning means simply designing efficiently to get the most from a well tested system, with a 40 year track record.
  • 5.   Reduce the slab or beam thickness to it’s minimum;   Reduce the amount of steel used; and   With that in mind, as much as possible, promote the use of Moment Frame Structures, instead of Shear Wall Structures, which saves concrete & steel.
  • 6.   Even an inefficient Post-tensioned structure uses less concrete & steel than Reinforced Concrete. So, shouldn’t Post-tensioning already be Sustainable?   To be honest - No!! As shown in the first slide, the Standard of Care is NOT Sustainable. Because of the cost of steel and concrete, Post-tensioning is already the Standard of Care.   What is required for Sustainability is to reduce the use of concrete & steel & maximize the efficiency of the building.
  • 7. Carbon Footprint (How much Carbon Dioxide is released to the Environment in the manufacture, delivery of materials & long term use of the building) Solid Waste Resource Use Energy Use (aka Embodied Energy) Water Polution Air Pollution Carbon Footprint of Materials
  • 8. Concrete: If you could reduce the thickness of a typical 150 ft x 300 ft concrete slab by just 1”, you would reduce the Carbon Emissions from it’s manufacture by the same amount as is produced by 4 automobiles in one year. Steel: Steel is the real culprit, making Conventionally Reinforced Concrete Buildings & Especially Steel Frame Buildings inherently Non-Green. Reducing Steel Use is Paramount!
  • 9. Let’s look at a typical Interior Bay Flat Plate
  • 10. To illustrate the stark difference between Post- tensioned Concrete & Reinforced Concrete: Compared to an Efficiently designed 8.5” thick Post-tensioned slab, the comparable Conventionally Reinforced Concrete Slab is 12” thick with a lot of rebar.
  • 11. Span 2 – Reinf. Conc. Flat Slab Output
  • 12. 12” CONC. SLAB W/480 FT OF #5 REBAR PER SPAN This is why we Post-tension in the first place!
  • 13. Now - The Path to Sustainable Design: Stage One: Reduce the Amount of Concrete used. Using POSTEN Multistory, The “Auto Depth Option” automatically determines the thinnest slab section possible based upon the minimum Effective Pre-stress at the specific “User selected” spans &, with that, provides a full design.
  • 14. POSTEN Multistory Design Procedures 1, 2 & 3 Computer Automatically produce an Input Efficient Design of the Rebar, Tendons & Drapes We will use Design Procedure 1, using Allowable Tensile Strength as our Control.
  • 15. POSTEN Multistory Computer Input The Auto Depth Option determines the thinnest Concrete section possible & Proceeds with a full design.
  • 16. POSTEN Multistory Computer Input To improve efficiency, we will allow the program to add pre-stress at the outer spans, if necessary.
  • 17. POSTEN Multistory Computer Input We will start out with a 9.5” thick slab and see if we can reduce the Thickness of this slab.
  • 18. Minimum Thickness Output The Output shows that POSTEN reduced the slab thickness from 9.5” to 8.5” (A savings of 1” in slab thickness) and proceeded with the design of the thinner slab.
  • 19. Span 2 - Minimum Thickness Output
  • 20. Span 2 - Minimum Thickness Output
  • 22. Now that we have reduced our Carbon Footprint, by minimizing the thickness of the slab, the Next Step, Reduce the amount of Steel used.
  • 23. From analyzing Post-tensioning designs, we learned that at interior spans and cantilevers there are usually residual compressive stresses remaining at the tension faces. By analyzing & Balancing the Stresses in the sections, the efficiency of the tendons can be maximized, resulting in less steel.
  • 24. POSTEN Multistory’s “Drape & Pre-stress Optimization” algorithms starts out by performing an Efficient Proportional Load Balancing Design. Once this design is completed, the program immediately proceeds with 10 cycles of balancing the stresses in the sections, thereby creating the most efficient design.
  • 25. Since “Drape & Pre-stress Optimization” starts out with Proportional Load Balancing, the program knows how much steel was required by Proportional Load Balancing, and as a result, prints out the amount of steel saved in the process of Stress Balancing. Sometimes the savings is significant and sometimes the savings is minor. Normally, there is a savings.
  • 26. Using the same computer input from Example 2, we need only turn off the “Auto Depth Option”, turn on the “Drape & Pre-stress Optimization Option” and re- run the program to get the Sustainable Design (with both the minimum concrete & steel).
  • 27. Clear Auto Depth Option POSTEN Multistory Computer Input
  • 28. POSTEN Multistory Computer Input Select “Drape & Pre-stress Optimization” & run the design.
  • 29. This output shows the percentage of savings (9.2%) of steel that was saved by Performing Stress Balancing (above & beyond the Efficient Design produced by POSTEN’s Proportional Load Balancing). Minimum Steel Output
  • 30. Span 2 - Minimum Steel Output
  • 31. Span 2 - Minimum Steel Output
  • 32. Span 2 - Minimum Steel Output
  • 33. Our Sustainable Design Resulted from:   Determining the Thinnest Section of Slab or Beam (saving 1” in the post-tension design or saving 3.5” when compared to Conventional Reinf. Conc.)   Determining the least amount of Steel through Stress Balancing (saving an additional 9% of the steel)
  • 34. POSTEN’s Automatic LEED Documentation SLAB OR FLAT PLATE SCHEDULE (SEE TYPICAL DETAIL FOR NOTATION) NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D s1 30.00 192.00 12.00 6#5 17#5 8#5 "D.F.L." 3#5 ENDS? NOMINAL LENGTH, "NL" 5.2 FT 9.8 FT 18.4 FT 3.6 FT 27.3 FT NONE NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D s2 32.00 192.00 12.00 17#5 15#5 6#5 "D.F.L." 2#5 ENDS? NOMINAL LENGTH, "NL" 10.2 FT 9.5 FT 17.4 FT 7.9 FT 29.3 FT NONE NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D s3 R. 32.00 192.00 12.00 15#5 17#5 6#5 "D.F.L." 2#5 ENDS? NOMINAL LENGTH, "NL" 9.5 FT 10.1 FT 17.6 FT 6.7 FT 29.3 FT NONE NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D END 30.00 192.00 12.00 17#5 42#5 8#5 "D.F.L." 3#5 ENDS? NOMINAL LENGTH, "NL" 9.7 FT 5.6 FT 18.5 FT 7.9 FT 27.3 FT NONE
  • 35. POSTEN’s Automatic LEED Documentation SLAB OR FLAT PLATE SCHEDULE (SEE TYPICAL DETAIL FOR NOTATION) BAR LENGTHS SHOWN ARE NOMINAL LENGTHS, PRIOR TO ADDING ANCHORAGE FOR FULL BAR DEVELOPMENT. NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES L1 30.00 288.00 8.50 4#5 5#5 "D.F.L." ENDS? STRESS L. MID. R. NOMINAL LENGTH, "NL" 5.3 FT 9.8 FT NONE 514.K 4.2 1.4 7.1 NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES L2 32.00 288.00 8.50 5#5 4#5 "D.F.L." ENDS? STRESS L. MID. R. NOMINAL LENGTH, "NL" 10.1 FT 9.5 FT NONE 439.K 7.1 1.4 7.1 NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES L3 32.00 288.00 8.50 4#5 4#5 "D.F.L." ENDS? STRESS L. MID. R. NOMINAL LENGTH, "NL" 9.5 FT 10.0 FT NONE 439.K 7.1 1.4 7.1 NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES END 30.00 288.00 8.50 4#5 4#5 "D.F.L." ENDS? STRESS L. MID. R. NOMINAL LENGTH, "NL" 9.7 FT 6.3 FT NONE 495.K 7.1 1.4 4.6
  • 36. POSTEN’s Automatic LEED Documentation SLAB OR FLAT PLATE SCHEDULE (SEE TYPICAL DETAIL FOR NOTATION) BAR LENGTHS SHOWN ARE NOMINAL LENGTHS, PRIOR TO ADDING ANCHORAGE FOR FULL BAR DEVELOPMENT. NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES L1 30.00 288.00 8.50 4#5 4#5 "D.F.L." ENDS? STRESS L. MID. R. NOMINAL LENGTH, "NL" 5.3 FT 9.8 FT NONE 512.K 4.2 1.4 7.1 NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES L2 32.00 288.00 8.50 4#5 5#5 "D.F.L." ENDS? STRESS L. MID. R. NOMINAL LENGTH, "NL" 10.1 FT 9.5 FT NONE 370.K 7.1 1.4 7.1 NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES L3 32.00 288.00 8.50 5#5 4#5 "D.F.L." ENDS? STRESS L. MID. R. NOMINAL LENGTH, "NL" 9.5 FT 10.0 FT NONE 370.K 7.1 1.4 7.1 NAME SPAN WIDTH DEPTH TOP LEFT TOP RIGHT BOT "BM" END DIST BOT "BX" ANCH'D BOT LEFT BOT RIGHT PRE- TENDON ORDINATES END 30.00 288.00 8.50 4#5 4#5 "D.F.L." ENDS? STRESS L. MID. R. NOMINAL LENGTH, "NL" 9.7 FT 6.3 FT NONE 475.K 7.1 1.4 4.2
  • 37. POSTEN’s Automatic LEED Documentation Minimum Thickness Output
  • 38. POSTEN’s Automatic LEED Documentation & Ultimately Minimum Steel Output
  • 39. Using POSTEN Multistory, Post-tensioned Moment Frames Preserved the Historic Fabric of this National Historic Landmark. ®
  • 40. When designing for Wind or Seismic Forces, the Post-tensioned Concrete Moment Frame Structure is the Sustainable Alternative.   Using less Steel and Concrete; and   Significantly improving overall building efficiency by eliminating shear walls.
  • 41. To do this:   The columns must be accurately designed simultaneously with the Post-tensioned floors and roof, using the correct columns stiffness’s (not approximations);   The correct wind or seismic lateral forces (along with the P-delta magnification factors) must be inputted into the Post-tensioned floors & roof designs; and   Correct design procedures must be used to design the Moment Frame
  • 42. To obtain the correct Lateral (Wind or Seismic) Forces, the Magnification Factors for P-Delta and/or the correct Column Stiffness’s (floor by floor) – we recommend using a Multistory Concrete Frame Analysis Program, such as:   ETABS by CSI or   EZframe by POSTEN Engineering Systems We strongly recommend against Finite Element Analysis
  • 43. POSTEN Multistory Computer Input In this example, each floor level is designed, one level at a time, based upon the lateral forces & P-delta magnification factors from a 2nd order Multistory Frame Analysis for the full structure.
  • 44. POSTEN Multistory Computer Input Moment Frames are designed by Activating Q5 – First Order Design Q7 - Gravity Force Design or Q9 – Second Order Design
  • 45. POSTEN Multistory Computer Input Two additional Input Screens appear to include the Column Properties, Design Criteria, Lateral Forces & Magnification Factors For Post-tensioned Moment Frame Design.
  • 47. Span 1 Beam – Moment Frame Design
  • 48. Span 2 Beam – Moment Frame Design
  • 49. Span 3 Beam – Moment Frame Design
  • 50. Columns – Moment Frame Design
  • 51. POSTEN Multistory Computer Graphic Output Span 1 of 3 Post-tensioned Moment Frame
  • 52. POSTEN Multistory Computer Graphic Output Span 2 of 3 Post-tensioned Moment Frame
  • 53. POSTEN Multistory Computer Graphic Output Span 3 of 3 Post-tensioned Moment Frame
  • 54. Sustainable Post-tensioning Advantages   Less Weight   Less Steel   Lower Building Height or Higher Building Volume   Lower Construction Cost   Lower Carbon Footprint   Lower Embodied Energy, Waste & Pollution
  • 55. Despite Post-tensioning’s inherent advantages over Reinforced Concrete & Steel Frame, Sustainability additionally requires:   Minimizing Materials (i.e. conc. & steel);   Maximizing Efficiency (thin sections, stress analysis &/or moment frames); and   The Proper Documentation to back it up. Post-tensioning can provide it all – Like No Other.
  • 56. Thank you for listening. ® Dennis Reilly Arch/SE POSTEN Engineering Systems 510-275-4750 sales@postensoft.com www.postensoft.com www.postensoft.blogspot.com