FIRE PUMP DESIGN INTENT 
2003 NFPA 20, 2002 NFPA 13, and 2006 IBC & IFC 
To Accompany Architectural Review 
Plans  have  been  reviewed  for  compliance  with  the  2006  International  Building  Code  (IBC) 
(excluding  Chapter  11  and  27),  2006  International  Fire  Code  (IFC),  2006  International 
Mechanical  Code  (IMC),  2006  International  Fuel  Gas  Code  (IFC),  2008  NFPA  70  National 
Electrical Code [Rule 0780­02­01­.02] 
Correction lists are not all inclusive.  See additional comments on the cover sheet. 
Listed  items  require  revision  or  clarification  by  contractual  documentation  (i.e.,  revised 
drawings, specifications, addenda, etc.) before plans can be approved.  Answers in letter form 
are  not  acceptable.  Design  intent  must  be  submitted  by  a  fire  protection  sprinkler  system 
engineer or architect.  Starting construction before plan approval may be considered as 
just cause by the state to issue a stop work order. [Rule 0780­02­03­.02] 
Architectural 
1.  The fire pump room must be separated from all other spaces of the building by 2­hour fire 
rated construction. The rating may be reduced to 1­hour if the building is fully sprinklered 
with a NFPA 13 system. [NFPA 20 5.12.1.1] 
2.  Provide heat (NFPA 20 5.12.2), lighting (NFPA 20 5.12.3), emergency lighting (NFPA 20 
5.12.4),  ventilation  (NFPA  20  5.12.5),  and  a  floor  drain  in  the  pump  room  (NFPA  20 
5.12.6). 
Mechanical 
1.  Provide a plan and a cross section of the fire pump room.  Identify any equipment that is 
not fire pump related (plumbing, mechanical, electrical, etc.). [2006 IFC Section 913 and 
NFPA 20 5.2.3] 
2.  Identify the fire pump manufacturer and model with pump and driver ratings.  Identify the 
manufacturer of the controller and transfer switches (if applicable). [NFPA 20 5.7] 
3.  All controllers and transfer switches shall be specifically listed for electric­motor driven fire 
pump service. [NFPA 20 10.1.2.1] 
4.  Provide  a  fire  pump  system  schematic  showing all system components including valves, 
tamper  switches,  check  valves,  controllers,  pumps,  bypass,  test  header,  suction  and 
discharge  line.  If  the  system  supplies  standpipes  and  sprinklers,  show  all  main  system 
components on the schematic. 
5.  Provide a graph sheet showing the following information. 
A.  Water  supply  combined  curve  (i.e.,  separate  fire  pump  curve,  public  water  supply 
curve, and a third curve showing the combined pump and public water supply effect). 
[NFPA 13 Chapter 14, A.14.3.2, and Figures A.14.3.2(a) thru (d)]
Fire Pump Design Intent ­ 2006 Codes – NFPA 20, IBC, and IFC 
Revised 04‐01‐11  Page 2 of 3 
B.  Verify that pump operation does not reduce suction pressure head below allowable per 
NFPA  20  5.14.3.  Include  pressure  losses  from  the  backflow  preventer  and  meter  if 
needed. 
C.  Verify that the water supply is capable of delivering 150 percent of the pump’s rated 
capacity. [NFPA 20 5.6.5] 
6.  Show the fire department connection. It must be on the discharge side of the fire pump. 
[NFPA 13 6.8] 
7.  Provide a pump bypass and a means to test the pump. [NFPA 20 5.14.4 and 5.19.1] 
8.  Provide a pressure relief valve. [NFPA 20 5.18] 
9.  Provide a jockey pump. [NFPA 20 5.24]  Show check and control valves at the discharge 
piping, and a control valve at the suction piping. [NFPA 20 Figure A.5.24.4] 
10. Each  jockey  and  fire  pump  controller  must  have  separate  sensing  lines  and  be  located 
between  the  discharge  check  and  control  valves.  [NFPA  20  10.5.2.1  and  Figure 
A.10.5.2.1(a) & (b)]  Show this on the plans and diagram/section. 
11. For fire pumps in high­rise buildings where electric motors are used and the height of the 
structure  is  beyond  the  pumping  capability  of  fire  department  apparatus,  a  reliable 
emergency  source  of  power shall be provided. [NFPA 20 9.2]  For reliable sources, see 
NFPA 20 9.2. 
12. Provide earthquake protection based on seismic design requirements. [NFPA 20 5.27] 
13. Check valves and backflow prevention devices must be listed for fire protection service and 
when located upstream of the pump shall be located a minimum of ten pipe diameters from 
the pump suction flange. [NFPA 20 5.26.1, 5.26.3, and 5.14.3] 
Electrical 
1.  Power for electric motor driven fire pumps must be from a reliable source or two or more 
independent sources. [NFPA 20 9.2] 
2.  Where multiple electric power sources are provided, they shall be arranged so that a fire at 
one source will not cause an interruption at the other source. [NFPA 20 9.2.5.1] 
3.  Where power is supplied by a service, it must be arranged to minimize the possibility of 
damage by fire. [NFPA 20 9.2.2 and .3] Service­entrance conductors or fire pump feeder 
conductors must be physically routed outside the building and must be installed as service­ 
entrance conductors in compliance with 2005 NFPA 70, Article 230. When routed through 
or under the building, it must be encased in concrete at least 2” thick. [NFPA 20 9.1.3 and 
2005 NFPA 70, Article 695.6(A), 230.6(1), or (2)] 
4.  The power supply feeding the fire pump and accessories must be dedicated, and  directly 
connected with no disconnect device to the power source. [NFPA 20 9.2, 9.3, and A.9.3.2] 
Except that a single disconnecting means and associated over­current protective device is 
permitted  between  a  power  source  remote  from  the  fire  pump  room  and  controller  or 
transfer switch or listed combination of both. [NFPA 20 9.3.2.2.3.1] This disconnect must 
be supervised. [NFPA 20 9.3.2.2.3.2(E)]
Fire Pump Design Intent ­ 2006 Codes – NFPA 20, IBC, and IFC 
Revised 04‐01‐11  Page 3 of 3 
5.  Where alternate power is supplied by an on­site generator, the generator must be located 
and protected in accordance with 9.2.2 and Section 9.6. [NFPA 20 9.2.5.2] 
6.  All  controllers  must  be  located  close  to  the  motor  with  access  for  servicing.  [NFPA  20 
10.2.1] 
7.  Transfer of power to the fire pump controller between the normal supply and the alternate 
supply must take place within the fire pump room. [NFPA 20 9.6.4] 
8.  Manual  transfer  switches  may  not  be  used  to transfer power to the fire pump controller. 
[NFPA 20 10.8.1.2] 
9.  A fire pump controller may not be used as a junction box to supply other equipment (jockey 
or make­up controllers). [NFPA 20 10.3.4.6] 
10. No  remote  device  may  be  installed  that  will  prevent  automatic  operation  of  the  transfer 
switch. [NFPA 20 10.8.1.3] 
11. All  pump  room  wiring must be in rigid, intermediate, or liquid tight flexible metal conduit, 
LFNC­B, listed Type MC cable, Type MI cable, or other approved means. [NFPA 20 9.1.3 
and 2005 NFPA 70, Article 695.6(E)] 
12. If the pump is not constantly attended, the controller must have connections to provide an 
audible or visual alarm in a constantly attended location for the following conditions. [NFPA 
20 10.4.7] 
A.  Controller has operated into a motor running condition. 
B.  Loss of power to one of the phases on the line side of the motor contactor. 
C.  Phase reversal on the line side of the motor contactor. 
D.  Controller connected to alternate source where two sources of power are supplied. 
13. Engine generator sets supplying emergency or stand­by power to fire pump assemblies 
shall be periodically tested accordance with NFPA 110. (IFC 913.5.2)

Mais conteúdo relacionado

Mais procurados

Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20
guest5980d0
 
KEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXTKEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXT
Aled Long
 
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98
osers
 
contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14
David King
 

Mais procurados (16)

AWI20202 commercial
AWI20202 commercialAWI20202 commercial
AWI20202 commercial
 
meteodyn WT 5.0 new features
meteodyn WT 5.0 new features meteodyn WT 5.0 new features
meteodyn WT 5.0 new features
 
Cost Forecast Report
Cost Forecast ReportCost Forecast Report
Cost Forecast Report
 
PDD for GTCC
PDD for GTCCPDD for GTCC
PDD for GTCC
 
Monitoring Programme Review
Monitoring Programme ReviewMonitoring Programme Review
Monitoring Programme Review
 
SUA presentation of the Power Generation Station Project
SUA presentation of the Power Generation Station ProjectSUA presentation of the Power Generation Station Project
SUA presentation of the Power Generation Station Project
 
Cash Flow Portfolio
Cash Flow PortfolioCash Flow Portfolio
Cash Flow Portfolio
 
DAMAC Heights Project
DAMAC Heights ProjectDAMAC Heights Project
DAMAC Heights Project
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
 
Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20
 
Window Analysis @ 30-June-2012
Window Analysis @ 30-June-2012Window Analysis @ 30-June-2012
Window Analysis @ 30-June-2012
 
Scope of work
Scope of workScope of work
Scope of work
 
KEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXTKEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXT
 
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98
Spec05 pro-ka-kc151a -contractor_quality_control_dated_10-19-98
 
Mukusi Guesthouse
Mukusi GuesthouseMukusi Guesthouse
Mukusi Guesthouse
 
contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14
 

Semelhante a Firepumpdesignintent4.01

Fire sprinkler abcb reference document - automatice fire sprinkler system
Fire sprinkler   abcb reference document - automatice fire sprinkler systemFire sprinkler   abcb reference document - automatice fire sprinkler system
Fire sprinkler abcb reference document - automatice fire sprinkler system
Jorge Muno
 
8015-0151-LM11-22-320-EL-WP-0278_00
8015-0151-LM11-22-320-EL-WP-0278_008015-0151-LM11-22-320-EL-WP-0278_00
8015-0151-LM11-22-320-EL-WP-0278_00
SANDIP GOSWAMI
 
550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev A550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev A
Stephen Stuart
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
syedaliabl2023
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2
tfkc1212
 

Semelhante a Firepumpdesignintent4.01 (20)

TG-15595- report-and-analysis_powerpointviewer(1).doc
TG-15595- report-and-analysis_powerpointviewer(1).docTG-15595- report-and-analysis_powerpointviewer(1).doc
TG-15595- report-and-analysis_powerpointviewer(1).doc
 
Fire sprinkler abcb reference document - automatice fire sprinkler system
Fire sprinkler   abcb reference document - automatice fire sprinkler systemFire sprinkler   abcb reference document - automatice fire sprinkler system
Fire sprinkler abcb reference document - automatice fire sprinkler system
 
Svr part 4_e
Svr part 4_eSvr part 4_e
Svr part 4_e
 
MATS Compliant
MATS CompliantMATS Compliant
MATS Compliant
 
8015-0151-LM11-22-320-EL-WP-0278_00
8015-0151-LM11-22-320-EL-WP-0278_008015-0151-LM11-22-320-EL-WP-0278_00
8015-0151-LM11-22-320-EL-WP-0278_00
 
Draft Final Rulemaking Summary for PA Oil & Gas Chapter 78 & 78a - August 2015
Draft Final Rulemaking Summary for PA Oil & Gas Chapter 78 & 78a - August 2015Draft Final Rulemaking Summary for PA Oil & Gas Chapter 78 & 78a - August 2015
Draft Final Rulemaking Summary for PA Oil & Gas Chapter 78 & 78a - August 2015
 
550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev A550 ICA AS-550-900 Rev A
550 ICA AS-550-900 Rev A
 
Saes s-060
Saes s-060Saes s-060
Saes s-060
 
Gas Turbine Basics.pdf
Gas Turbine Basics.pdfGas Turbine Basics.pdf
Gas Turbine Basics.pdf
 
Rajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptxRajgir Sports Complex_Project Kick Off Presentation.pptx
Rajgir Sports Complex_Project Kick Off Presentation.pptx
 
2015 asme-code-changes
2015 asme-code-changes2015 asme-code-changes
2015 asme-code-changes
 
Pp2 coursework 2
Pp2 coursework  2Pp2 coursework  2
Pp2 coursework 2
 
Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...
Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...
Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...
 
Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...
Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...
Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...
 
Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...
Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...
Caterpillar Cat 416F2 Backhoe Loader (Prefix LYA) Service Repair Manual (LYA0...
 
ALIR.pdf
ALIR.pdfALIR.pdf
ALIR.pdf
 
Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...
Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...
Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...
 
Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...
Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...
Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...
 
Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...
Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...
Caterpillar Cat 420F2 Backhoe Loader (Prefix LYC) Service Repair Manual (LYC0...
 
PP2 - Assignment
PP2 - Assignment PP2 - Assignment
PP2 - Assignment
 

Último

Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 

Firepumpdesignintent4.01

  • 1. Fire Pump Design Intent ­ 2006 Codes – NFPA 20, IBC, and IFC  Revised 04‐01‐11  Page 1 of 3  FIRE PUMP DESIGN INTENT  2003 NFPA 20, 2002 NFPA 13, and 2006 IBC & IFC  To Accompany Architectural Review  Plans  have  been  reviewed  for  compliance  with  the  2006  International  Building  Code  (IBC)  (excluding  Chapter  11  and  27),  2006  International  Fire  Code  (IFC),  2006  International  Mechanical  Code  (IMC),  2006  International  Fuel  Gas  Code  (IFC),  2008  NFPA  70  National  Electrical Code [Rule 0780­02­01­.02]  Correction lists are not all inclusive.  See additional comments on the cover sheet.  Listed  items  require  revision  or  clarification  by  contractual  documentation  (i.e.,  revised  drawings, specifications, addenda, etc.) before plans can be approved.  Answers in letter form  are  not  acceptable.  Design  intent  must  be  submitted  by  a  fire  protection  sprinkler  system  engineer or architect.  Starting construction before plan approval may be considered as  just cause by the state to issue a stop work order. [Rule 0780­02­03­.02]  Architectural  1.  The fire pump room must be separated from all other spaces of the building by 2­hour fire  rated construction. The rating may be reduced to 1­hour if the building is fully sprinklered  with a NFPA 13 system. [NFPA 20 5.12.1.1]  2.  Provide heat (NFPA 20 5.12.2), lighting (NFPA 20 5.12.3), emergency lighting (NFPA 20  5.12.4),  ventilation  (NFPA  20  5.12.5),  and  a  floor  drain  in  the  pump  room  (NFPA  20  5.12.6).  Mechanical  1.  Provide a plan and a cross section of the fire pump room.  Identify any equipment that is  not fire pump related (plumbing, mechanical, electrical, etc.). [2006 IFC Section 913 and  NFPA 20 5.2.3]  2.  Identify the fire pump manufacturer and model with pump and driver ratings.  Identify the  manufacturer of the controller and transfer switches (if applicable). [NFPA 20 5.7]  3.  All controllers and transfer switches shall be specifically listed for electric­motor driven fire  pump service. [NFPA 20 10.1.2.1]  4.  Provide  a  fire  pump  system  schematic  showing all system components including valves,  tamper  switches,  check  valves,  controllers,  pumps,  bypass,  test  header,  suction  and  discharge  line.  If  the  system  supplies  standpipes  and  sprinklers,  show  all  main  system  components on the schematic.  5.  Provide a graph sheet showing the following information.  A.  Water  supply  combined  curve  (i.e.,  separate  fire  pump  curve,  public  water  supply  curve, and a third curve showing the combined pump and public water supply effect).  [NFPA 13 Chapter 14, A.14.3.2, and Figures A.14.3.2(a) thru (d)]
  • 2. Fire Pump Design Intent ­ 2006 Codes – NFPA 20, IBC, and IFC  Revised 04‐01‐11  Page 2 of 3  B.  Verify that pump operation does not reduce suction pressure head below allowable per  NFPA  20  5.14.3.  Include  pressure  losses  from  the  backflow  preventer  and  meter  if  needed.  C.  Verify that the water supply is capable of delivering 150 percent of the pump’s rated  capacity. [NFPA 20 5.6.5]  6.  Show the fire department connection. It must be on the discharge side of the fire pump.  [NFPA 13 6.8]  7.  Provide a pump bypass and a means to test the pump. [NFPA 20 5.14.4 and 5.19.1]  8.  Provide a pressure relief valve. [NFPA 20 5.18]  9.  Provide a jockey pump. [NFPA 20 5.24]  Show check and control valves at the discharge  piping, and a control valve at the suction piping. [NFPA 20 Figure A.5.24.4]  10. Each  jockey  and  fire  pump  controller  must  have  separate  sensing  lines  and  be  located  between  the  discharge  check  and  control  valves.  [NFPA  20  10.5.2.1  and  Figure  A.10.5.2.1(a) & (b)]  Show this on the plans and diagram/section.  11. For fire pumps in high­rise buildings where electric motors are used and the height of the  structure  is  beyond  the  pumping  capability  of  fire  department  apparatus,  a  reliable  emergency  source  of  power shall be provided. [NFPA 20 9.2]  For reliable sources, see  NFPA 20 9.2.  12. Provide earthquake protection based on seismic design requirements. [NFPA 20 5.27]  13. Check valves and backflow prevention devices must be listed for fire protection service and  when located upstream of the pump shall be located a minimum of ten pipe diameters from  the pump suction flange. [NFPA 20 5.26.1, 5.26.3, and 5.14.3]  Electrical  1.  Power for electric motor driven fire pumps must be from a reliable source or two or more  independent sources. [NFPA 20 9.2]  2.  Where multiple electric power sources are provided, they shall be arranged so that a fire at  one source will not cause an interruption at the other source. [NFPA 20 9.2.5.1]  3.  Where power is supplied by a service, it must be arranged to minimize the possibility of  damage by fire. [NFPA 20 9.2.2 and .3] Service­entrance conductors or fire pump feeder  conductors must be physically routed outside the building and must be installed as service­  entrance conductors in compliance with 2005 NFPA 70, Article 230. When routed through  or under the building, it must be encased in concrete at least 2” thick. [NFPA 20 9.1.3 and  2005 NFPA 70, Article 695.6(A), 230.6(1), or (2)]  4.  The power supply feeding the fire pump and accessories must be dedicated, and  directly  connected with no disconnect device to the power source. [NFPA 20 9.2, 9.3, and A.9.3.2]  Except that a single disconnecting means and associated over­current protective device is  permitted  between  a  power  source  remote  from  the  fire  pump  room  and  controller  or  transfer switch or listed combination of both. [NFPA 20 9.3.2.2.3.1] This disconnect must  be supervised. [NFPA 20 9.3.2.2.3.2(E)]
  • 3. Fire Pump Design Intent ­ 2006 Codes – NFPA 20, IBC, and IFC  Revised 04‐01‐11  Page 3 of 3  5.  Where alternate power is supplied by an on­site generator, the generator must be located  and protected in accordance with 9.2.2 and Section 9.6. [NFPA 20 9.2.5.2]  6.  All  controllers  must  be  located  close  to  the  motor  with  access  for  servicing.  [NFPA  20  10.2.1]  7.  Transfer of power to the fire pump controller between the normal supply and the alternate  supply must take place within the fire pump room. [NFPA 20 9.6.4]  8.  Manual  transfer  switches  may  not  be  used  to transfer power to the fire pump controller.  [NFPA 20 10.8.1.2]  9.  A fire pump controller may not be used as a junction box to supply other equipment (jockey  or make­up controllers). [NFPA 20 10.3.4.6]  10. No  remote  device  may  be  installed  that  will  prevent  automatic  operation  of  the  transfer  switch. [NFPA 20 10.8.1.3]  11. All  pump  room  wiring must be in rigid, intermediate, or liquid tight flexible metal conduit,  LFNC­B, listed Type MC cable, Type MI cable, or other approved means. [NFPA 20 9.1.3  and 2005 NFPA 70, Article 695.6(E)]  12. If the pump is not constantly attended, the controller must have connections to provide an  audible or visual alarm in a constantly attended location for the following conditions. [NFPA  20 10.4.7]  A.  Controller has operated into a motor running condition.  B.  Loss of power to one of the phases on the line side of the motor contactor.  C.  Phase reversal on the line side of the motor contactor.  D.  Controller connected to alternate source where two sources of power are supplied.  13. Engine generator sets supplying emergency or stand­by power to fire pump assemblies  shall be periodically tested accordance with NFPA 110. (IFC 913.5.2)