SlideShare uma empresa Scribd logo
1 de 12
PROJECT
    QUALITY
MANAGEMENT
        TRAINING
[
TRAINING




                              OBJECTIVE
               To qualify the student to understand the vital connection between
               the quality management and the project success.




           TRAINING CONTENT
               At the end of the course the student will be able to:


               ✓✓Understand the quality cost
               ✓✓Plan quality policies and standards;
               ✓✓Identify the quality target audience
               ✓✓Perform Quality Assurance
               ✓✓Understand and apply the ISO 21500 that concerns the
                 quality in projects

               ✓✓Use the basic quality control tools in the projects
               ✓✓Understand and apply the configuration management
                 process

               ✓✓Assess the change requests and their impact on project
                 quality

                                                 © Macrosolutions SA. All rights reserved.   2/12
[
TRAINING




                         FACT SHEET
                                                                                DESCRIPTION

                                                           Course number of hours. The number of days depends
           COURSE DURATION
                                                           on the daily number of hours dedicated in each course.
           16 Hours.

                                                           The minimum number of students suggested to ensure
           NUMBER OF PARTICIPANTS
                                                           the training economic viability.
           Minimum 20 students per class.

           TARGET AUDIENCE
           Project managers, project team members, sponsors and others stakeholders interested in the
           project management process.

           REQUIREMENTS
           Desirable basic project management knowledge.

                                                           The language in which the training is ministered.
           LANGUAGE(S)
           Portuguese, English and Spanish.

           LOCAL
           Provided by the contractor. Worldwide attendance.

                                                           Closed classes are hired by a particular organization
           CLOSED CLASSES
                                                           or group. In this case all the participants are selected/
           (IN COMPANY)?                                   chosen by the contracting organization.
           Yes.

                                                           Open classes offer public access in which the
           OPEN CLASSES?
                                                           registration is done by each participant, individually.
           No.

                                                           Professional Development Units are the measuring
           CERTIFICATION AND PDU
                                                           units issued by the Project Management Institute for
           All training participants will receive a        the credential holders. With these units the credential
           participation certificate with 16 PMI’s PDUs.   holders can maintain their certifications.
           (PMI R.E.P. activity number: Macro009)



                                                                            © Macrosolutions SA. All rights reserved.   3/12
[
TRAINING




STANDARDS AND
METHODOLOGIES
                                              Project management standards and methodologies discussed
                                              and addressed in the training.


               Project Management Institute (PMI)                   UK Office of Government Commerce (OGC)

    PMBOK Guide                                              PRINCE2 (Projects in Controlled Environments)

    PMI Practice Standard for Estimating                     MSP (Managing Successful Programmes)                      —

    PMI Practice Standard for Earned Value Management    —   M_O_R (Management of Risks)                               —

    PMI Practice Standard for Configuration                  P3M3 (Portfolio, Programme, and Project
                                                                                                                       —
    Management                                               Management Maturity Model)

    PMI Practice Standard for Risk Management            —   P3O (Portfolio, Programme and Project Offices)            —

    PMI Practice Standard for Work Breakdown Structure       MoP (Management of Portfolios)                            —

    PMI Practice Standard for Scheduling                     MoV (Management of Value)                                 —

    PMI Standard for Portfolio Management                —
                                                                                  Scrum Alliance
    PMI Standard for Program Management                  —
                                                             Scrum Methodology                                         —
    PMI Project Manager Development Competency
                                                         —
    Framework
                                                               International Project Management Association (IPMA)
    Organizational Project Management Maturity Model
                                                         —   ICB® IPMA Competence Baseline
    (OPM3®)                                                                                                            —



                                                                                 © Macrosolutions SA. All rights reserved.   4/12
[
TRAINING




                  BASIC
               PROGRAM
    [
    COURSE OPENING


    [
    THE QUALITY MOVEMENT
    ›› Qualty stories
    ›› The greatest quality innovators
    ›› Historical lessons to be applied today
    ›› Quality on today’s competitive environment


    [
    QUALITY MANAGEMENT FUNDAMENTALS
    ›› What is quality?
    ›› The benefits of a quality management program
    ›› The cost of quality
    ›› The role of the project manager


    [
    QUALITY PLANNING
    ›› Quality planning activities
    ›› “Inputs” and “Outputs”
    ›› Stakeholder analysis and their quality expectations
    ›› Quality standards
    ›› Tools and techniques

                                                             © Macrosolutions SA. All rights reserved.   5/12
[
TRAINING
BASIC PROGRAM




    [
    QUALITY ASSURANCE (QA)
    ›› The role of QA in the management process
    ›› What a Quality Plan must contain
    ›› The role of QA on the project’s life cycle
    ›› Tools and techniques


    [
    QUALITY CONTROL
    ›› Collecting measurement data
    ›› Determining the process
    ›› Controlling the process variables
    ›› Quality Control Reports
    ›› Tools and techniques


    [
    CHANGE MANAGEMENT
    ›› The change control process
    ›› Configuration management related to the project scope
    ›› Configuration control team


    [
    IMPROVEMENT PROCESSES
    ›› Analysing collected measures
    ›› Evaluation and metrics
    ›› Variance
    ›› Strategies for continuous improvements


    [
    COMMITMENT TO QUALITY
    ›› Leading quality initiatives
    ›› Quality Management in the new millenium
    ›› Nurturing a corporation towards quality


    [
    ISO 21500
    ›› Standard concept and approach
    ›› Application to the projects context
    ›› ISO 21500 and the PMBOK Guide
    ›› ISO 21500 and PRINCE2 methodology


    [
    COURSE CLOSE-OUT

                                                               © Macrosolutions SA. All rights reserved.   6/12
[
TRAINING




    PMCOASTER                                                                    ®


      DYNAMIC
                       It is a dynamics developed to simulate the real
                       projects environment.
                       Divided into teams, the participants will plan and
                       execute the construction of a functional high speed
                       roller coaster prototype for a theme park.
                        Students will define the work, evaluate the project
           feasible budget and time in order to execute it. They will do so
           concerning the time and costs constraints. Then, students will
           execute and monitor the project to demonstrate the effectiveness
           of the plan in adverse conditions.
           The approximate duration of the dynamics is 2 hours and its main
           objective is to show the interrelationship between the scope
           required, deadlines and available budget. In addition, the aspects
           related to the teamwork quality are directly addressed.

                                            © Macrosolutions SA. All rights reserved.   7/12
[
TRAINING
PMCOASTER DYNAMIC




       Features     1- Shows the direct relationship between
                    project SCOPE, TIME and COSTS.
                    2- It highlights the importance of the
                    DECISION MAKING in resource-limited
                    settings.
                    3- Enables participants to understand the
                    mechanisms directly related to the creation of
                    the project schedule.




                                           © Macrosolutions SA. All rights reserved.   8/12
[
TRAINING




                                ADDITIONAL
                                 DYNAMICS
                                    As part of our methodology, in this course the following dynamics
                                    will be used:



    [
    CASE STUDIES
    › Ricardo Vargas and the Macrosolutions’ team have selected a relevant set of case studies and
      exercises that allow the participants to associate real and fictional cases the to daily work.
    › All case studies are appropriate to the nature of the client and the training audience.


    [
    VIDEOS SELECTION
    › In order to facilitate the student learning, videos that cover various parts of movies,
      commercials, home videos, etc. are used in the classroom environment to fix concepts and
      associate technical issues with the reality of work and also to introduce new concepts.
    › They are short videos with direct focus on specific topics, tools and cases.


    [
    GROUP WORK
    › Several studies and exercises will be proposed by the instructor in order to present a particular
      topic or discuss a particular approach to project management.
    › Throughout the training the teamwork will be encouraged and strengthened as a mean for the
      group to learn.


    [
    LEARNING EXERCISES
    › During the training, students perform concepts retaining quick exercises. Usually the exercises
      are quick and direct and involve some kind of mathematical calculation.

                                                                      © Macrosolutions SA. All rights reserved.   9/12
[
TRAINING




EXCLUSIVE STUDENT
     ACCESS AREA
                                                          In addition to the exclusive printed material,
                                                          all participants will have access to the
                                                          courseware’s electronic version, to the files
                                                          of exercises and to the work done in the
                                                          classroom.
                                                          The access is given through the restricted
                                                          site that is available and prepared by the
                                                          Macrosolutions team considering each
                                                          course that we provide. This initiative is a
                                                          pioneer in the educational market and also
                                                          anticipates trends related to the documents’
                                                          electronic management
    Student Area’s on the website macrosolutions.com.br

                                                                       © Macrosolutions SA. All rights reserved.   10/12
[
TRAINING




            REQUIRED
           EQUIPMENT
            The equipment required for the proper realization of the course is:




           [ HIGH RESOLUTION PROJECTOR (1024X768)


           [ SOUND SYSTEM FOR VIDEO DISPLAY


           [ INTERNET ACCESS


           [ VARIABLE ILLUMINATION INSIDE THE CLASSROOM


           [ 01 TABLE FOR EACH GROUP OF FIVE STUDENTS


           [ 01 FLIP CHART FOR EACH GROUP OF FIVE STUDENTS

                                              © Macrosolutions SA. All rights reserved.   11/12
[
TRAINING




         FURTHER
     INFORMATION
           For further information about this course, please contact:


           Phone: +55 31 3024-3003
           Fax: +55 31 3024-3005
           email: info@macrosolutions.com.br

                                            © Macrosolutions SA. All rights reserved.   12/12

Mais conteúdo relacionado

Mais procurados

Macrosolutions Training: Project Procurement Management
Macrosolutions Training: Project Procurement ManagementMacrosolutions Training: Project Procurement Management
Macrosolutions Training: Project Procurement ManagementMacrosolutions SA
 
Macrosolutions Training: Risk Management
Macrosolutions Training: Risk ManagementMacrosolutions Training: Risk Management
Macrosolutions Training: Risk ManagementMacrosolutions SA
 
Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...Macrosolutions SA
 
Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions SA
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions SA
 
Macrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project ManagersMacrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project ManagersMacrosolutions SA
 
Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Brian Phillips
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondekLucie Budíková
 
Intl. pm standards prince2, pmi & co. - potifob 2011
Intl. pm standards   prince2, pmi & co. - potifob 2011Intl. pm standards   prince2, pmi & co. - potifob 2011
Intl. pm standards prince2, pmi & co. - potifob 2011POTIFOB
 
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…netmind
 
Future Africa
Future AfricaFuture Africa
Future AfricaLarsStork
 
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions SA
 
Macrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications ManagementMacrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications ManagementMacrosolutions SA
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefitsPOTIFOB1
 
Pdc capmhandbook
Pdc capmhandbookPdc capmhandbook
Pdc capmhandbookjohnlucy
 
Pdc pmphandbook
Pdc pmphandbookPdc pmphandbook
Pdc pmphandbookjohnlucy
 
P3M3 - Discovery Assessment
P3M3 - Discovery AssessmentP3M3 - Discovery Assessment
P3M3 - Discovery AssessmentProfeo
 
P3 M3 Services 2v0 App
P3 M3 Services 2v0 AppP3 M3 Services 2v0 App
P3 M3 Services 2v0 AppAndyMurray
 
Analysis of Critical Success Factors Relevance along SAP Implementation Phases
Analysis of Critical Success Factors Relevance along SAP Implementation PhasesAnalysis of Critical Success Factors Relevance along SAP Implementation Phases
Analysis of Critical Success Factors Relevance along SAP Implementation PhasesJose Esteves
 
P3 m3 intro long
P3 m3 intro longP3 m3 intro long
P3 m3 intro longKadlaa
 

Mais procurados (20)

Macrosolutions Training: Project Procurement Management
Macrosolutions Training: Project Procurement ManagementMacrosolutions Training: Project Procurement Management
Macrosolutions Training: Project Procurement Management
 
Macrosolutions Training: Risk Management
Macrosolutions Training: Risk ManagementMacrosolutions Training: Risk Management
Macrosolutions Training: Risk Management
 
Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...
 
Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)
 
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
 
Macrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project ManagersMacrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project Managers
 
Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondek
 
Intl. pm standards prince2, pmi & co. - potifob 2011
Intl. pm standards   prince2, pmi & co. - potifob 2011Intl. pm standards   prince2, pmi & co. - potifob 2011
Intl. pm standards prince2, pmi & co. - potifob 2011
 
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
 
Future Africa
Future AfricaFuture Africa
Future Africa
 
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projects
 
Macrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications ManagementMacrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications Management
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefits
 
Pdc capmhandbook
Pdc capmhandbookPdc capmhandbook
Pdc capmhandbook
 
Pdc pmphandbook
Pdc pmphandbookPdc pmphandbook
Pdc pmphandbook
 
P3M3 - Discovery Assessment
P3M3 - Discovery AssessmentP3M3 - Discovery Assessment
P3M3 - Discovery Assessment
 
P3 M3 Services 2v0 App
P3 M3 Services 2v0 AppP3 M3 Services 2v0 App
P3 M3 Services 2v0 App
 
Analysis of Critical Success Factors Relevance along SAP Implementation Phases
Analysis of Critical Success Factors Relevance along SAP Implementation PhasesAnalysis of Critical Success Factors Relevance along SAP Implementation Phases
Analysis of Critical Success Factors Relevance along SAP Implementation Phases
 
P3 m3 intro long
P3 m3 intro longP3 m3 intro long
P3 m3 intro long
 

Destaque

Social media analysis Telcel, Izzi, Axtel
Social media analysis Telcel, Izzi, AxtelSocial media analysis Telcel, Izzi, Axtel
Social media analysis Telcel, Izzi, AxtelElife Brasil
 
TECNALIA. Welcome to Inspiring Business. Welcome to TECNALIA. (español) 10/2013
TECNALIA. Welcome to Inspiring Business. Welcome to TECNALIA. (español) 10/2013TECNALIA. Welcome to Inspiring Business. Welcome to TECNALIA. (español) 10/2013
TECNALIA. Welcome to Inspiring Business. Welcome to TECNALIA. (español) 10/2013TECNALIA Research & Innovation
 
Palestra google marketing em goiânia 20 fevereiro2013
Palestra google marketing em goiânia 20 fevereiro2013Palestra google marketing em goiânia 20 fevereiro2013
Palestra google marketing em goiânia 20 fevereiro2013Flávio Aquino Sabugo
 
Novas Formas de Publicidade para o Novo [e-Consumidor]
Novas Formas de Publicidade para o Novo [e-Consumidor]Novas Formas de Publicidade para o Novo [e-Consumidor]
Novas Formas de Publicidade para o Novo [e-Consumidor]Flávio Aquino Sabugo
 
How To Make Amazing Presentations
How To Make Amazing PresentationsHow To Make Amazing Presentations
How To Make Amazing PresentationsPrezentate
 
Case Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and FieldCase Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and FieldAMSYSCO Inc.
 
Batalha de páginas easy taxi, 99 taxis e uber
Batalha de páginas   easy taxi, 99 taxis e uberBatalha de páginas   easy taxi, 99 taxis e uber
Batalha de páginas easy taxi, 99 taxis e uberElife Brasil
 
для педсовета психологічний клімат у колективі
для педсовета  психологічний клімат у колективідля педсовета  психологічний клімат у колективі
для педсовета психологічний клімат у колективіНаталья Полищук
 
Symmetrical Components Fault Calculations
Symmetrical Components Fault CalculationsSymmetrical Components Fault Calculations
Symmetrical Components Fault Calculationsmichaeljmack
 
Leadership challenges in project management
Leadership challenges in project managementLeadership challenges in project management
Leadership challenges in project managementalokkushwah07
 
three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...Vikram Rawani
 
How to write a Newspaper Article
How to write a Newspaper ArticleHow to write a Newspaper Article
How to write a Newspaper Articleomneya2010
 

Destaque (19)

Social media analysis Telcel, Izzi, Axtel
Social media analysis Telcel, Izzi, AxtelSocial media analysis Telcel, Izzi, Axtel
Social media analysis Telcel, Izzi, Axtel
 
TECNALIA. Welcome to Inspiring Business. Welcome to TECNALIA. (español) 10/2013
TECNALIA. Welcome to Inspiring Business. Welcome to TECNALIA. (español) 10/2013TECNALIA. Welcome to Inspiring Business. Welcome to TECNALIA. (español) 10/2013
TECNALIA. Welcome to Inspiring Business. Welcome to TECNALIA. (español) 10/2013
 
Multimedia Privacy
Multimedia PrivacyMultimedia Privacy
Multimedia Privacy
 
Palestra google marketing em goiânia 20 fevereiro2013
Palestra google marketing em goiânia 20 fevereiro2013Palestra google marketing em goiânia 20 fevereiro2013
Palestra google marketing em goiânia 20 fevereiro2013
 
Chapter 2 2.1.4
Chapter 2 2.1.4Chapter 2 2.1.4
Chapter 2 2.1.4
 
Novas Formas de Publicidade para o Novo [e-Consumidor]
Novas Formas de Publicidade para o Novo [e-Consumidor]Novas Formas de Publicidade para o Novo [e-Consumidor]
Novas Formas de Publicidade para o Novo [e-Consumidor]
 
How To Make Amazing Presentations
How To Make Amazing PresentationsHow To Make Amazing Presentations
How To Make Amazing Presentations
 
Case Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and FieldCase Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and Field
 
Lecture 18
Lecture 18Lecture 18
Lecture 18
 
Functional Food Strategies for Creating Consumer Awareness
Functional Food Strategies for Creating Consumer AwarenessFunctional Food Strategies for Creating Consumer Awareness
Functional Food Strategies for Creating Consumer Awareness
 
Forced harmonic motion
Forced harmonic motionForced harmonic motion
Forced harmonic motion
 
Curso pintor parte 1
Curso pintor   parte 1Curso pintor   parte 1
Curso pintor parte 1
 
Batalha de páginas easy taxi, 99 taxis e uber
Batalha de páginas   easy taxi, 99 taxis e uberBatalha de páginas   easy taxi, 99 taxis e uber
Batalha de páginas easy taxi, 99 taxis e uber
 
для педсовета психологічний клімат у колективі
для педсовета  психологічний клімат у колективідля педсовета  психологічний клімат у колективі
для педсовета психологічний клімат у колективі
 
10. Ethical issues
10. Ethical issues10. Ethical issues
10. Ethical issues
 
Symmetrical Components Fault Calculations
Symmetrical Components Fault CalculationsSymmetrical Components Fault Calculations
Symmetrical Components Fault Calculations
 
Leadership challenges in project management
Leadership challenges in project managementLeadership challenges in project management
Leadership challenges in project management
 
three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...three phase fault analysis with auto reset for temporary fault and trip for p...
three phase fault analysis with auto reset for temporary fault and trip for p...
 
How to write a Newspaper Article
How to write a Newspaper ArticleHow to write a Newspaper Article
How to write a Newspaper Article
 

Semelhante a Project Quality Management Training

Macrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions SA
 
Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions SA
 
Macrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career PlanMacrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career PlanMacrosolutions SA
 
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...Stefan Ondek, PMP, CSPM
 
Training Catalog 0710
Training Catalog 0710Training Catalog 0710
Training Catalog 0710olivierlazar
 
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions SA
 
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions SA
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions SA
 
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions SA
 
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...Macrosolutions SA
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedCTE Solutions Inc.
 
Pmp project management professional
Pmp   project management professionalPmp   project management professional
Pmp project management professionalZabeel Institute
 
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions SA
 
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions SA
 
Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...Macrosolutions SA
 
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...Macrosolutions SA
 
MDC-Project Management
MDC-Project ManagementMDC-Project Management
MDC-Project Managementsphill10
 

Semelhante a Project Quality Management Training (20)

Macrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management Office
 
Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for Executives
 
Project Management Credentials
Project Management CredentialsProject Management Credentials
Project Management Credentials
 
Macrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career PlanMacrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career Plan
 
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
 
Training Catalog 0710
Training Catalog 0710Training Catalog 0710
Training Catalog 0710
 
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
 
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
 
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
 
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison Demystified
 
Pmp project management professional
Pmp   project management professionalPmp   project management professional
Pmp project management professional
 
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
 
Project Management, Pmi Perspective
Project Management, Pmi PerspectiveProject Management, Pmi Perspective
Project Management, Pmi Perspective
 
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management Processes
 
Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...
 
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
 
MDC-Project Management
MDC-Project ManagementMDC-Project Management
MDC-Project Management
 
DePaul CPE Project Management 2013 Program and Course Guide
DePaul CPE Project Management 2013 Program and Course GuideDePaul CPE Project Management 2013 Program and Course Guide
DePaul CPE Project Management 2013 Program and Course Guide
 

Mais de Macrosolutions SA

Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em ProjetosMacrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em ProjetosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em ProjetosMacrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em ProjetosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...Macrosolutions SA
 
Macrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management OfficeMacrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management OfficeMacrosolutions SA
 
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de ProjetoMacrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de ProjetoMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para ExecutivosMacrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para ExecutivosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de RiscosMacrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de RiscosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de ProgramasMacrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de ProgramasMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de PortfólioMacrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de PortfólioMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetosMacrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em ProjetosMacrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em ProjetosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...Macrosolutions SA
 

Mais de Macrosolutions SA (15)

Portfólio Macrosolutions
Portfólio MacrosolutionsPortfólio Macrosolutions
Portfólio Macrosolutions
 
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em ProjetosMacrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
 
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em ProjetosMacrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
 
Macrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management OfficeMacrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management Office
 
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de ProjetoMacrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
 
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para ExecutivosMacrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
 
Macrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de RiscosMacrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de Riscos
 
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
 
Macrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de ProgramasMacrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de Programas
 
Macrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de PortfólioMacrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de Portfólio
 
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetosMacrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
 
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em ProjetosMacrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
 

Último

Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
71368-80-4.pdf Fast delivery good quality
71368-80-4.pdf Fast delivery  good quality71368-80-4.pdf Fast delivery  good quality
71368-80-4.pdf Fast delivery good qualitycathy664059
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration TrainingCalvinarnold843
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...PRnews2
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansNugget Global
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 

Último (20)

Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
71368-80-4.pdf Fast delivery good quality
71368-80-4.pdf Fast delivery  good quality71368-80-4.pdf Fast delivery  good quality
71368-80-4.pdf Fast delivery good quality
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration Training
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business Loans
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate Professional
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Toyota and Seven Parts Storage Techniques
Toyota and Seven Parts Storage TechniquesToyota and Seven Parts Storage Techniques
Toyota and Seven Parts Storage Techniques
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 

Project Quality Management Training

  • 1. PROJECT QUALITY MANAGEMENT TRAINING
  • 2. [ TRAINING OBJECTIVE To qualify the student to understand the vital connection between the quality management and the project success. TRAINING CONTENT At the end of the course the student will be able to: ✓✓Understand the quality cost ✓✓Plan quality policies and standards; ✓✓Identify the quality target audience ✓✓Perform Quality Assurance ✓✓Understand and apply the ISO 21500 that concerns the quality in projects ✓✓Use the basic quality control tools in the projects ✓✓Understand and apply the configuration management process ✓✓Assess the change requests and their impact on project quality © Macrosolutions SA. All rights reserved. 2/12
  • 3. [ TRAINING FACT SHEET DESCRIPTION Course number of hours. The number of days depends COURSE DURATION on the daily number of hours dedicated in each course. 16 Hours. The minimum number of students suggested to ensure NUMBER OF PARTICIPANTS the training economic viability. Minimum 20 students per class. TARGET AUDIENCE Project managers, project team members, sponsors and others stakeholders interested in the project management process. REQUIREMENTS Desirable basic project management knowledge. The language in which the training is ministered. LANGUAGE(S) Portuguese, English and Spanish. LOCAL Provided by the contractor. Worldwide attendance. Closed classes are hired by a particular organization CLOSED CLASSES or group. In this case all the participants are selected/ (IN COMPANY)? chosen by the contracting organization. Yes. Open classes offer public access in which the OPEN CLASSES? registration is done by each participant, individually. No. Professional Development Units are the measuring CERTIFICATION AND PDU units issued by the Project Management Institute for All training participants will receive a the credential holders. With these units the credential participation certificate with 16 PMI’s PDUs. holders can maintain their certifications. (PMI R.E.P. activity number: Macro009) © Macrosolutions SA. All rights reserved. 3/12
  • 4. [ TRAINING STANDARDS AND METHODOLOGIES Project management standards and methodologies discussed and addressed in the training. Project Management Institute (PMI) UK Office of Government Commerce (OGC) PMBOK Guide PRINCE2 (Projects in Controlled Environments) PMI Practice Standard for Estimating MSP (Managing Successful Programmes) — PMI Practice Standard for Earned Value Management — M_O_R (Management of Risks) — PMI Practice Standard for Configuration P3M3 (Portfolio, Programme, and Project — Management Management Maturity Model) PMI Practice Standard for Risk Management — P3O (Portfolio, Programme and Project Offices) — PMI Practice Standard for Work Breakdown Structure MoP (Management of Portfolios) — PMI Practice Standard for Scheduling MoV (Management of Value) — PMI Standard for Portfolio Management — Scrum Alliance PMI Standard for Program Management — Scrum Methodology — PMI Project Manager Development Competency — Framework International Project Management Association (IPMA) Organizational Project Management Maturity Model — ICB® IPMA Competence Baseline (OPM3®) — © Macrosolutions SA. All rights reserved. 4/12
  • 5. [ TRAINING BASIC PROGRAM [ COURSE OPENING [ THE QUALITY MOVEMENT ›› Qualty stories ›› The greatest quality innovators ›› Historical lessons to be applied today ›› Quality on today’s competitive environment [ QUALITY MANAGEMENT FUNDAMENTALS ›› What is quality? ›› The benefits of a quality management program ›› The cost of quality ›› The role of the project manager [ QUALITY PLANNING ›› Quality planning activities ›› “Inputs” and “Outputs” ›› Stakeholder analysis and their quality expectations ›› Quality standards ›› Tools and techniques © Macrosolutions SA. All rights reserved. 5/12
  • 6. [ TRAINING BASIC PROGRAM [ QUALITY ASSURANCE (QA) ›› The role of QA in the management process ›› What a Quality Plan must contain ›› The role of QA on the project’s life cycle ›› Tools and techniques [ QUALITY CONTROL ›› Collecting measurement data ›› Determining the process ›› Controlling the process variables ›› Quality Control Reports ›› Tools and techniques [ CHANGE MANAGEMENT ›› The change control process ›› Configuration management related to the project scope ›› Configuration control team [ IMPROVEMENT PROCESSES ›› Analysing collected measures ›› Evaluation and metrics ›› Variance ›› Strategies for continuous improvements [ COMMITMENT TO QUALITY ›› Leading quality initiatives ›› Quality Management in the new millenium ›› Nurturing a corporation towards quality [ ISO 21500 ›› Standard concept and approach ›› Application to the projects context ›› ISO 21500 and the PMBOK Guide ›› ISO 21500 and PRINCE2 methodology [ COURSE CLOSE-OUT © Macrosolutions SA. All rights reserved. 6/12
  • 7. [ TRAINING PMCOASTER ® DYNAMIC It is a dynamics developed to simulate the real projects environment. Divided into teams, the participants will plan and execute the construction of a functional high speed roller coaster prototype for a theme park. Students will define the work, evaluate the project feasible budget and time in order to execute it. They will do so concerning the time and costs constraints. Then, students will execute and monitor the project to demonstrate the effectiveness of the plan in adverse conditions. The approximate duration of the dynamics is 2 hours and its main objective is to show the interrelationship between the scope required, deadlines and available budget. In addition, the aspects related to the teamwork quality are directly addressed. © Macrosolutions SA. All rights reserved. 7/12
  • 8. [ TRAINING PMCOASTER DYNAMIC Features 1- Shows the direct relationship between project SCOPE, TIME and COSTS. 2- It highlights the importance of the DECISION MAKING in resource-limited settings. 3- Enables participants to understand the mechanisms directly related to the creation of the project schedule. © Macrosolutions SA. All rights reserved. 8/12
  • 9. [ TRAINING ADDITIONAL DYNAMICS As part of our methodology, in this course the following dynamics will be used: [ CASE STUDIES › Ricardo Vargas and the Macrosolutions’ team have selected a relevant set of case studies and exercises that allow the participants to associate real and fictional cases the to daily work. › All case studies are appropriate to the nature of the client and the training audience. [ VIDEOS SELECTION › In order to facilitate the student learning, videos that cover various parts of movies, commercials, home videos, etc. are used in the classroom environment to fix concepts and associate technical issues with the reality of work and also to introduce new concepts. › They are short videos with direct focus on specific topics, tools and cases. [ GROUP WORK › Several studies and exercises will be proposed by the instructor in order to present a particular topic or discuss a particular approach to project management. › Throughout the training the teamwork will be encouraged and strengthened as a mean for the group to learn. [ LEARNING EXERCISES › During the training, students perform concepts retaining quick exercises. Usually the exercises are quick and direct and involve some kind of mathematical calculation. © Macrosolutions SA. All rights reserved. 9/12
  • 10. [ TRAINING EXCLUSIVE STUDENT ACCESS AREA In addition to the exclusive printed material, all participants will have access to the courseware’s electronic version, to the files of exercises and to the work done in the classroom. The access is given through the restricted site that is available and prepared by the Macrosolutions team considering each course that we provide. This initiative is a pioneer in the educational market and also anticipates trends related to the documents’ electronic management Student Area’s on the website macrosolutions.com.br © Macrosolutions SA. All rights reserved. 10/12
  • 11. [ TRAINING REQUIRED EQUIPMENT The equipment required for the proper realization of the course is: [ HIGH RESOLUTION PROJECTOR (1024X768) [ SOUND SYSTEM FOR VIDEO DISPLAY [ INTERNET ACCESS [ VARIABLE ILLUMINATION INSIDE THE CLASSROOM [ 01 TABLE FOR EACH GROUP OF FIVE STUDENTS [ 01 FLIP CHART FOR EACH GROUP OF FIVE STUDENTS © Macrosolutions SA. All rights reserved. 11/12
  • 12. [ TRAINING FURTHER INFORMATION For further information about this course, please contact: Phone: +55 31 3024-3003 Fax: +55 31 3024-3005 email: info@macrosolutions.com.br © Macrosolutions SA. All rights reserved. 12/12