WÄRTSILÄ LNG SOLUTIONS
LNG18 April 2016
Fredrik Bonäs
fi.linkedin.com/in/fredrikbonas
#WartsilaKnowsGas #GasBassador
5.8.2016 Fredrik Bonäs/ Kenneth Engblom1
© Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom2
TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
© Wärtsilä NOT YET CLASSIFIED
BEFORE: CONVENTIONAL LNG VALUE CHAIN
5.8.2016 Fredrik Bonäs/ Kenneth Engblom3
© Wärtsilä NOT YET CLASSIFIED
AFTER: CONVENTIONAL + SMALL-SCALE VALUE CHAIN
5.8.2016 Fredrik Bonäs/ Kenneth Engblom4
© Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom5
WÄRTSILÄ LNG SOLUTIONS
ONSHOREOFFSHORELIFECYCLE
Small LNG liquefaction plants Mini LNG liquefaction plants Small/Medium LNG terminals LNG satellite & bunkering
terminals
LNG storage & regasification
barge
LNG regasification BOG reliquefaction Cargo Handling System
Gas and LNG Carriers
Fuel gas handling system Ship and Cargo Tank design
Lifecycle services Start–up support Product and technical support Spares
© Wärtsilä NOT YET CLASSIFIED
Wärtsilä offers products and services for modern, flexible and sustainable
power generation and LNG infrastructure.
WÄRTSILÄ SERVICES
EPC Spares
Maintenance
Operation
Project
Development and
Financial Services
5.8.2016 Fredrik Bonäs/ Kenneth Engblom6
© Wärtsilä NOT YET CLASSIFIED
SHORTENING PROJECT DEVELOPMENT
AND EPC LEAD TIME
5.8.2016 Fredrik Bonäs/ Kenneth Engblom7
YOU HAVE AN IDEA!
Wärtsilä route
• Design, Engineering, Cost Evaluations,
Constructability reviews and Safety studies
• Project execution and commissioning
• Asset management and maintenance agreements
Conventional route
• Choose an engineering company
• Conceptual design, Feasibility studies and FEED
• Evaluate potential contractors
• Bidding process, supplier selection and delivery
contract(s)
• Manage construction of LNG terminal and power
plant
• Arrange for operation maintenance and training
Your shorter & quicker route to
commercial operations!
(10-20 months)
Long process to FID, more time spent
on administration, legal consultations
and contractual setup...
(20-30 months)
© Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom8
TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
© Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom9
MINI/SMALL SCALE LIQUEFACTION PLANTS
INPUT OUTPUTPLANT
Gas sources
• Pipeline gas
• Biogas
• Landfill gas
• Associated gas
• Coal seam gas
• Tight gas
• Shale gas
2,000 – 300,000 TPA
(3,400 – 510,000 GPD)
Gas pre-treatment
Liquefaction
• Mixed Refrigerant: 2,000 -
30,000 TPA
(3,400 – 51,000 GPD)
• Reversed Brayton: 20,000 –
300,000 TPA
(34,000 – 510,000 GPD)
Storage tanks
Jetty & Marine facilities
Export systems
LNG transport
• Carriers
• Tanker trucks
• Containers
• Rail cars
Peak shaving
gas send-out
Ship bunkering
TPA = Tonnes Per Year
GPD = Gallons Per Day
© Wärtsilä NOT YET CLASSIFIED
Bergen, Norway
“Twice the capacity,
half the footprint!”
Kollsnes II
Customer Gasnor
Type Small scale liquefaction plant
Tank net volume 4,000 m3
Capacity 230 TPD / 84,000 TPA
Size of
liquefaction unit
12 m x 38 m
Gas source Pipeline gas. Inlet pressure
typically 70 bar.
Details Extension to Kollsnes I.
Includes two truck loading
stations and existing loading
jetty for small LNG carriers.
Scope
of supply
Complete plant, incl.
• Gas pre-treatment
• Cooling system (Seawater)
• Double Reversed Brayton
liquefaction process
• Storage tank
• Electrical and control
systems
• Civil works
Delivery method EPCIC
Delivered 2007
5.8.2016 Fredrik Bonäs/ Kenneth Engblom10
© Wärtsilä NOT YET CLASSIFIED
Oslo, Norway
“135 Oslo region buses will be
able to run on biogas which
means 10,000 tonnes
emission reduction per year.”
EGE Biogas
Customer Cambi AS
Type Mini liquefaction plant
Tank net volume 180 m3
Capacity 11 TPD / 4,000 TPA
Size of
liquefaction unit
8 m x 14 m
Gas source Biogas from 50,000 TPA of
food waste
Details Fuel production for 135 buses
in the city of Oslo
Scope
of supply
Complete plant, incl.
• Gas pre-treatment
• Cooling system (Ambient
air)
• MR liquefaction process
• Storage tank
• Electrical and control
systems
• Service agreement
Excl. Civil works and
installation
Delivery method EPC
Delivered 2013
5.8.2016 Fredrik Bonäs/ Kenneth Engblom11
© Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom12
TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
© Wärtsilä NOT YET CLASSIFIED
SMALL/MID SCALE TERMINALS
INPUT OUTPUTTERMINAL
LNG transport
• Carriers
• Tanker trucks
• Containers
• Rail cars
Tank capacity
100 – 160,000 m3
(26,400 – 42 Million gallons)
Jetty & Marine facilities
Unloading systems
Storage tanks
Boil-off gas handling
Re-gasification
• Up to 1,000 TPH
(1,000 MMSCFD)
Export systems
LNG transport
• Carriers
• Tanker trucks
• Containers
• Rail cars
Gas send-out
Ship bunkering
TPH = Tonnes Per Hour
MMSCFD = Million Standard Cubic Feet per Day
5.8.2016 Fredrik Bonäs/ Kenneth Engblom13
© Wärtsilä NOT YET CLASSIFIED
Tornio, Finland
“Providing the only source of
gas for industries in Northern
Finland.”
Tornio Manga LNG
Customer Manga LNG Oy
Type Small/Mid scale terminal
Tank net volume 50,000 m3
Send out Max 40 tonnes per hour at 6.0
barg
Scope of supply • Civil works and
infrastructure
• Full containment storage
tank
• Regasification & gas
metering
• BOG system
• Electrical and control
system
• Unloading system
• Bunkering and Truck
loading
Delivery method EPC Turnkey
Delivered 2018
5.8.2016 Fredrik Bonäs/ Kenneth Engblom14
© Wärtsilä NOT YET CLASSIFIED
San Pedro de Macoris, Dominican Republic
“Power Plant and LNG supply
system combined at the same
site.”
Los Origenes
Customer César Iglesias
Type Combined Power Plant and
LNG tank yard
Tank net volume 500 m3
Details LNG delivered by 3 trucks /
day, 40 m3 each.
Scope of supply • Complete Wärtsilä 34 dual-
fuel power plant including
civil works
• Integration of customer’s
LNG tank yard
Delivery method EPC
Delivered 2011
5.8.2016 Fredrik Bonäs/ Kenneth Engblom15
© Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom16
TABLE OF CONTENTS
Overview of Wärtsilä’s LNG solutions
Liquefaction plants
Terminals
Summary
© Wärtsilä NOT YET CLASSIFIED
COMMITMENT TO CUSTOMER SATISFACTION
• At Wärtsilä we know that every customer has unique expectations and
priorities. We serve all of them with the same level of quality and excellence.
• Projects are tailored to customer needs based on a set of pre-defined scopes
and proven designs, that will provide a valuable asset with the highest
possible quality at an affordable cost.
5.8.2016 Fredrik Bonäs/ Kenneth Engblom17
© Wärtsilä NOT YET CLASSIFIED
SUPPORT FOR THE WHOLE LIFE CYCLE
24 h
Technical Support
Wärtsilä Services’ global network
Widest range of offering and expertise
Wärtsilä Services provides full service throughout the product
lifecycle for both Marine and Energy solutions customers,
and is constantly developing its network worldwide.
 70 countries, 200 locations, 11,000 service professionals
5.8.2016 Fredrik Bonäs/ Kenneth Engblom18
© Wärtsilä NOT YET CLASSIFIED
COMPLETE SOLUTIONS THAT BRING VALUE TO CUSTOMERS
Project
Development &
Financing
Technology EPC Operations &
Maintenance
LNG Terminal or Liquefaction Plant
Gas / Dual-Fuel Power Plant
5.8.2016 Fredrik Bonäs/ Kenneth Engblom19

Mais conteúdo relacionado

Mais procurados

Small and medium scale LNG for power generation
Small and medium scale LNG for power generationSmall and medium scale LNG for power generation
Small and medium scale LNG for power generationSmart Power Generation
 
Seagas LNG Bunkering Viking Grace
Seagas LNG Bunkering Viking GraceSeagas LNG Bunkering Viking Grace
Seagas LNG Bunkering Viking GraceJohn Hatley PE
 
Wärtsilä: Ensuring sustainable electricity supply in Myanmar
Wärtsilä: Ensuring sustainable electricity supply in Myanmar Wärtsilä: Ensuring sustainable electricity supply in Myanmar
Wärtsilä: Ensuring sustainable electricity supply in Myanmar Wärtsilä Marine Solutions
 
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel Types
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel TypesLNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel Types
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel TypesJohn Hatley PE
 
Wärtsilä HY: the first integrated hybrid power module in the marine industry!
Wärtsilä HY: the first integrated hybrid power module in the marine industry!Wärtsilä HY: the first integrated hybrid power module in the marine industry!
Wärtsilä HY: the first integrated hybrid power module in the marine industry!Nicola Spiga
 
Fuel gas quality control for gas mode operations
Fuel gas quality control for gas mode operationsFuel gas quality control for gas mode operations
Fuel gas quality control for gas mode operationsReetta Kaila
 
Asia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distributionAsia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distributionInnovation Norway
 
Wison Offshore & Marine - FLNG solution Mar 2015
Wison Offshore & Marine - FLNG solution Mar 2015Wison Offshore & Marine - FLNG solution Mar 2015
Wison Offshore & Marine - FLNG solution Mar 2015Hisham Yusof
 
Poyry - How can small-scale LNG help grow the European gas market? - Point of...
Poyry - How can small-scale LNG help grow the European gas market? - Point of...Poyry - How can small-scale LNG help grow the European gas market? - Point of...
Poyry - How can small-scale LNG help grow the European gas market? - Point of...Pöyry
 
LNG fuelled container feeder ship
LNG fuelled container feeder shipLNG fuelled container feeder ship
LNG fuelled container feeder shipNitin Sharma
 
Global LNG bunkering infrastructure
Global LNG bunkering infrastructureGlobal LNG bunkering infrastructure
Global LNG bunkering infrastructureGeorge Teriakidis
 
Marketing of Small Scale LNG serving Remote Users
Marketing of Small Scale LNG serving Remote UsersMarketing of Small Scale LNG serving Remote Users
Marketing of Small Scale LNG serving Remote UsersDarshit Paun
 
Lng bunkering china status report January 2016
Lng bunkering china status report January 2016Lng bunkering china status report January 2016
Lng bunkering china status report January 2016Dan-Hermann Thue
 
LNG Effect on Ship Design
LNG Effect on Ship DesignLNG Effect on Ship Design
LNG Effect on Ship DesignStephanie Camay
 
Opportunities for Shipping LNG to the Caribbean
Opportunities for Shipping LNG to the CaribbeanOpportunities for Shipping LNG to the Caribbean
Opportunities for Shipping LNG to the CaribbeanJohn Hatley PE
 
Gas entec ppt for_gis 2016_distribution
Gas entec ppt for_gis 2016_distributionGas entec ppt for_gis 2016_distribution
Gas entec ppt for_gis 2016_distributionBrandon Shin
 
Wärtsilä offshore oil and gas business
Wärtsilä offshore oil and gas businessWärtsilä offshore oil and gas business
Wärtsilä offshore oil and gas businessBusiness Finland
 
Outlook on LNG Bunkering Facilities in China Inland Waterways and Ports
Outlook on LNG Bunkering Facilities in China Inland Waterways and PortsOutlook on LNG Bunkering Facilities in China Inland Waterways and Ports
Outlook on LNG Bunkering Facilities in China Inland Waterways and PortsDan-Hermann Thue
 

Mais procurados (20)

Small and medium scale LNG for power generation
Small and medium scale LNG for power generationSmall and medium scale LNG for power generation
Small and medium scale LNG for power generation
 
Seca seminar 2013 rolls royce - stein ruben larsen
Seca seminar 2013   rolls royce - stein ruben larsenSeca seminar 2013   rolls royce - stein ruben larsen
Seca seminar 2013 rolls royce - stein ruben larsen
 
Seagas LNG Bunkering Viking Grace
Seagas LNG Bunkering Viking GraceSeagas LNG Bunkering Viking Grace
Seagas LNG Bunkering Viking Grace
 
Wärtsilä: Ensuring sustainable electricity supply in Myanmar
Wärtsilä: Ensuring sustainable electricity supply in Myanmar Wärtsilä: Ensuring sustainable electricity supply in Myanmar
Wärtsilä: Ensuring sustainable electricity supply in Myanmar
 
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel Types
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel TypesLNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel Types
LNG Marine Fuel Adoption, How Soon, Which Routes, and Vessel Types
 
Wärtsilä HY: the first integrated hybrid power module in the marine industry!
Wärtsilä HY: the first integrated hybrid power module in the marine industry!Wärtsilä HY: the first integrated hybrid power module in the marine industry!
Wärtsilä HY: the first integrated hybrid power module in the marine industry!
 
Fuel gas quality control for gas mode operations
Fuel gas quality control for gas mode operationsFuel gas quality control for gas mode operations
Fuel gas quality control for gas mode operations
 
Asia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distributionAsia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distribution
 
Wison Offshore & Marine - FLNG solution Mar 2015
Wison Offshore & Marine - FLNG solution Mar 2015Wison Offshore & Marine - FLNG solution Mar 2015
Wison Offshore & Marine - FLNG solution Mar 2015
 
Poyry - How can small-scale LNG help grow the European gas market? - Point of...
Poyry - How can small-scale LNG help grow the European gas market? - Point of...Poyry - How can small-scale LNG help grow the European gas market? - Point of...
Poyry - How can small-scale LNG help grow the European gas market? - Point of...
 
LNG fuelled container feeder ship
LNG fuelled container feeder shipLNG fuelled container feeder ship
LNG fuelled container feeder ship
 
Global LNG bunkering infrastructure
Global LNG bunkering infrastructureGlobal LNG bunkering infrastructure
Global LNG bunkering infrastructure
 
Marketing of Small Scale LNG serving Remote Users
Marketing of Small Scale LNG serving Remote UsersMarketing of Small Scale LNG serving Remote Users
Marketing of Small Scale LNG serving Remote Users
 
Lng bunkering china status report January 2016
Lng bunkering china status report January 2016Lng bunkering china status report January 2016
Lng bunkering china status report January 2016
 
LNG Effect on Ship Design
LNG Effect on Ship DesignLNG Effect on Ship Design
LNG Effect on Ship Design
 
Opportunities for Shipping LNG to the Caribbean
Opportunities for Shipping LNG to the CaribbeanOpportunities for Shipping LNG to the Caribbean
Opportunities for Shipping LNG to the Caribbean
 
Compact Reliq™
Compact Reliq™Compact Reliq™
Compact Reliq™
 
Gas entec ppt for_gis 2016_distribution
Gas entec ppt for_gis 2016_distributionGas entec ppt for_gis 2016_distribution
Gas entec ppt for_gis 2016_distribution
 
Wärtsilä offshore oil and gas business
Wärtsilä offshore oil and gas businessWärtsilä offshore oil and gas business
Wärtsilä offshore oil and gas business
 
Outlook on LNG Bunkering Facilities in China Inland Waterways and Ports
Outlook on LNG Bunkering Facilities in China Inland Waterways and PortsOutlook on LNG Bunkering Facilities in China Inland Waterways and Ports
Outlook on LNG Bunkering Facilities in China Inland Waterways and Ports
 

Semelhante a Wärtsilä LNG Solutions

Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Robert Singleton
 
Natural gas and bio methane as fuel for transport h. aouad
Natural gas and bio methane as fuel for transport   h. aouadNatural gas and bio methane as fuel for transport   h. aouad
Natural gas and bio methane as fuel for transport h. aouadEuropean Commission
 
Lng creating new_opportunities_for_industrial_actors_and_consumers
Lng creating new_opportunities_for_industrial_actors_and_consumersLng creating new_opportunities_for_industrial_actors_and_consumers
Lng creating new_opportunities_for_industrial_actors_and_consumersPrizztech
 
Opportunities on lng_gasum
Opportunities on lng_gasumOpportunities on lng_gasum
Opportunities on lng_gasumPrizztech
 
Basic technology & solutions of LNG
Basic technology & solutions of LNGBasic technology & solutions of LNG
Basic technology & solutions of LNGAbu Bakar Siddiqui
 
Conceptual design study Kriegers Flak 090618 redused
Conceptual design study Kriegers Flak 090618 redusedConceptual design study Kriegers Flak 090618 redused
Conceptual design study Kriegers Flak 090618 redusedThomas Stalin
 
Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Global CCS Institute
 
Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...Global CCS Institute
 
Oivin inversen's presentation slides from the 2010 World National Oil Compani...
Oivin inversen's presentation slides from the 2010 World National Oil Compani...Oivin inversen's presentation slides from the 2010 World National Oil Compani...
Oivin inversen's presentation slides from the 2010 World National Oil Compani...oilandgas
 
Cryoshelter presentation linkedin
Cryoshelter presentation linkedinCryoshelter presentation linkedin
Cryoshelter presentation linkedinJoost van den Born
 
Innovation landscape All Energy 2017
Innovation landscape All Energy 2017Innovation landscape All Energy 2017
Innovation landscape All Energy 2017BVG Associates
 
Biogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by WärtsiläBiogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by WärtsiläWärtsilä Corporation
 
Central gas equipment for industrial gases (2011 edition in english) uk619 10...
Central gas equipment for industrial gases (2011 edition in english) uk619 10...Central gas equipment for industrial gases (2011 edition in english) uk619 10...
Central gas equipment for industrial gases (2011 edition in english) uk619 10...PRITAM JADHAV
 
Pioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan Crisplant
Pioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan CrisplantPioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan Crisplant
Pioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan CrisplantMediehuset Ingeniøren Live
 
Norway_Johan sverdrup, report 2015
Norway_Johan sverdrup, report 2015Norway_Johan sverdrup, report 2015
Norway_Johan sverdrup, report 2015Business Finland
 
20151208 Hydrocarbon training Cyprus - Stakeholders session
20151208 Hydrocarbon training Cyprus - Stakeholders session20151208 Hydrocarbon training Cyprus - Stakeholders session
20151208 Hydrocarbon training Cyprus - Stakeholders sessionJarno Dakhorst
 
The Trajectories of Large Scale Landfills and their International Counterparts
The Trajectories of Large Scale Landfills and their International CounterpartsThe Trajectories of Large Scale Landfills and their International Counterparts
The Trajectories of Large Scale Landfills and their International CounterpartsCircular Economy Asia
 

Semelhante a Wärtsilä LNG Solutions (20)

Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)
 
Natural gas and bio methane as fuel for transport h. aouad
Natural gas and bio methane as fuel for transport   h. aouadNatural gas and bio methane as fuel for transport   h. aouad
Natural gas and bio methane as fuel for transport h. aouad
 
Lng creating new_opportunities_for_industrial_actors_and_consumers
Lng creating new_opportunities_for_industrial_actors_and_consumersLng creating new_opportunities_for_industrial_actors_and_consumers
Lng creating new_opportunities_for_industrial_actors_and_consumers
 
Opportunities on lng_gasum
Opportunities on lng_gasumOpportunities on lng_gasum
Opportunities on lng_gasum
 
Basic technology & solutions of LNG
Basic technology & solutions of LNGBasic technology & solutions of LNG
Basic technology & solutions of LNG
 
Conceptual design study Kriegers Flak 090618 redused
Conceptual design study Kriegers Flak 090618 redusedConceptual design study Kriegers Flak 090618 redused
Conceptual design study Kriegers Flak 090618 redused
 
Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project
 
Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...
 
Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...
Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...
Hans Aksel Haugen (Tel-Tek) - The Crucial Role of Ships in Establishing a Nor...
 
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
Carbon Capture from the Cement Industry, Oscar Graff (Aker Solutions) UK/Norw...
 
Oivin inversen's presentation slides from the 2010 World National Oil Compani...
Oivin inversen's presentation slides from the 2010 World National Oil Compani...Oivin inversen's presentation slides from the 2010 World National Oil Compani...
Oivin inversen's presentation slides from the 2010 World National Oil Compani...
 
Cryoshelter presentation linkedin
Cryoshelter presentation linkedinCryoshelter presentation linkedin
Cryoshelter presentation linkedin
 
Innovation landscape All Energy 2017
Innovation landscape All Energy 2017Innovation landscape All Energy 2017
Innovation landscape All Energy 2017
 
Biogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by WärtsiläBiogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by Wärtsilä
 
Central gas equipment for industrial gases (2011 edition in english) uk619 10...
Central gas equipment for industrial gases (2011 edition in english) uk619 10...Central gas equipment for industrial gases (2011 edition in english) uk619 10...
Central gas equipment for industrial gases (2011 edition in english) uk619 10...
 
Pioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan Crisplant
Pioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan CrisplantPioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan Crisplant
Pioner-projektledelse på Samsø-færgens nye anlæg - Lars Sall, Kosan Crisplant
 
Norway_Johan sverdrup, report 2015
Norway_Johan sverdrup, report 2015Norway_Johan sverdrup, report 2015
Norway_Johan sverdrup, report 2015
 
20151208 Hydrocarbon training Cyprus - Stakeholders session
20151208 Hydrocarbon training Cyprus - Stakeholders session20151208 Hydrocarbon training Cyprus - Stakeholders session
20151208 Hydrocarbon training Cyprus - Stakeholders session
 
The Trajectories of Large Scale Landfills and their International Counterparts
The Trajectories of Large Scale Landfills and their International CounterpartsThe Trajectories of Large Scale Landfills and their International Counterparts
The Trajectories of Large Scale Landfills and their International Counterparts
 
Session 34 Rolf Willkrans
Session 34 Rolf WillkransSession 34 Rolf Willkrans
Session 34 Rolf Willkrans
 

Último

National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxachiever3003
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectErbil Polytechnic University
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 

Último (20)

National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptx
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction Project
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 

Wärtsilä LNG Solutions

  • 1. © Wärtsilä NOT YET CLASSIFIED WÄRTSILÄ LNG SOLUTIONS LNG18 April 2016 Fredrik Bonäs fi.linkedin.com/in/fredrikbonas #WartsilaKnowsGas #GasBassador 5.8.2016 Fredrik Bonäs/ Kenneth Engblom1
  • 2. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom2 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  • 3. © Wärtsilä NOT YET CLASSIFIED BEFORE: CONVENTIONAL LNG VALUE CHAIN 5.8.2016 Fredrik Bonäs/ Kenneth Engblom3
  • 4. © Wärtsilä NOT YET CLASSIFIED AFTER: CONVENTIONAL + SMALL-SCALE VALUE CHAIN 5.8.2016 Fredrik Bonäs/ Kenneth Engblom4
  • 5. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom5 WÄRTSILÄ LNG SOLUTIONS ONSHOREOFFSHORELIFECYCLE Small LNG liquefaction plants Mini LNG liquefaction plants Small/Medium LNG terminals LNG satellite & bunkering terminals LNG storage & regasification barge LNG regasification BOG reliquefaction Cargo Handling System Gas and LNG Carriers Fuel gas handling system Ship and Cargo Tank design Lifecycle services Start–up support Product and technical support Spares
  • 6. © Wärtsilä NOT YET CLASSIFIED Wärtsilä offers products and services for modern, flexible and sustainable power generation and LNG infrastructure. WÄRTSILÄ SERVICES EPC Spares Maintenance Operation Project Development and Financial Services 5.8.2016 Fredrik Bonäs/ Kenneth Engblom6
  • 7. © Wärtsilä NOT YET CLASSIFIED SHORTENING PROJECT DEVELOPMENT AND EPC LEAD TIME 5.8.2016 Fredrik Bonäs/ Kenneth Engblom7 YOU HAVE AN IDEA! Wärtsilä route • Design, Engineering, Cost Evaluations, Constructability reviews and Safety studies • Project execution and commissioning • Asset management and maintenance agreements Conventional route • Choose an engineering company • Conceptual design, Feasibility studies and FEED • Evaluate potential contractors • Bidding process, supplier selection and delivery contract(s) • Manage construction of LNG terminal and power plant • Arrange for operation maintenance and training Your shorter & quicker route to commercial operations! (10-20 months) Long process to FID, more time spent on administration, legal consultations and contractual setup... (20-30 months)
  • 8. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom8 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  • 9. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom9 MINI/SMALL SCALE LIQUEFACTION PLANTS INPUT OUTPUTPLANT Gas sources • Pipeline gas • Biogas • Landfill gas • Associated gas • Coal seam gas • Tight gas • Shale gas 2,000 – 300,000 TPA (3,400 – 510,000 GPD) Gas pre-treatment Liquefaction • Mixed Refrigerant: 2,000 - 30,000 TPA (3,400 – 51,000 GPD) • Reversed Brayton: 20,000 – 300,000 TPA (34,000 – 510,000 GPD) Storage tanks Jetty & Marine facilities Export systems LNG transport • Carriers • Tanker trucks • Containers • Rail cars Peak shaving gas send-out Ship bunkering TPA = Tonnes Per Year GPD = Gallons Per Day
  • 10. © Wärtsilä NOT YET CLASSIFIED Bergen, Norway “Twice the capacity, half the footprint!” Kollsnes II Customer Gasnor Type Small scale liquefaction plant Tank net volume 4,000 m3 Capacity 230 TPD / 84,000 TPA Size of liquefaction unit 12 m x 38 m Gas source Pipeline gas. Inlet pressure typically 70 bar. Details Extension to Kollsnes I. Includes two truck loading stations and existing loading jetty for small LNG carriers. Scope of supply Complete plant, incl. • Gas pre-treatment • Cooling system (Seawater) • Double Reversed Brayton liquefaction process • Storage tank • Electrical and control systems • Civil works Delivery method EPCIC Delivered 2007 5.8.2016 Fredrik Bonäs/ Kenneth Engblom10
  • 11. © Wärtsilä NOT YET CLASSIFIED Oslo, Norway “135 Oslo region buses will be able to run on biogas which means 10,000 tonnes emission reduction per year.” EGE Biogas Customer Cambi AS Type Mini liquefaction plant Tank net volume 180 m3 Capacity 11 TPD / 4,000 TPA Size of liquefaction unit 8 m x 14 m Gas source Biogas from 50,000 TPA of food waste Details Fuel production for 135 buses in the city of Oslo Scope of supply Complete plant, incl. • Gas pre-treatment • Cooling system (Ambient air) • MR liquefaction process • Storage tank • Electrical and control systems • Service agreement Excl. Civil works and installation Delivery method EPC Delivered 2013 5.8.2016 Fredrik Bonäs/ Kenneth Engblom11
  • 12. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom12 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  • 13. © Wärtsilä NOT YET CLASSIFIED SMALL/MID SCALE TERMINALS INPUT OUTPUTTERMINAL LNG transport • Carriers • Tanker trucks • Containers • Rail cars Tank capacity 100 – 160,000 m3 (26,400 – 42 Million gallons) Jetty & Marine facilities Unloading systems Storage tanks Boil-off gas handling Re-gasification • Up to 1,000 TPH (1,000 MMSCFD) Export systems LNG transport • Carriers • Tanker trucks • Containers • Rail cars Gas send-out Ship bunkering TPH = Tonnes Per Hour MMSCFD = Million Standard Cubic Feet per Day 5.8.2016 Fredrik Bonäs/ Kenneth Engblom13
  • 14. © Wärtsilä NOT YET CLASSIFIED Tornio, Finland “Providing the only source of gas for industries in Northern Finland.” Tornio Manga LNG Customer Manga LNG Oy Type Small/Mid scale terminal Tank net volume 50,000 m3 Send out Max 40 tonnes per hour at 6.0 barg Scope of supply • Civil works and infrastructure • Full containment storage tank • Regasification & gas metering • BOG system • Electrical and control system • Unloading system • Bunkering and Truck loading Delivery method EPC Turnkey Delivered 2018 5.8.2016 Fredrik Bonäs/ Kenneth Engblom14
  • 15. © Wärtsilä NOT YET CLASSIFIED San Pedro de Macoris, Dominican Republic “Power Plant and LNG supply system combined at the same site.” Los Origenes Customer César Iglesias Type Combined Power Plant and LNG tank yard Tank net volume 500 m3 Details LNG delivered by 3 trucks / day, 40 m3 each. Scope of supply • Complete Wärtsilä 34 dual- fuel power plant including civil works • Integration of customer’s LNG tank yard Delivery method EPC Delivered 2011 5.8.2016 Fredrik Bonäs/ Kenneth Engblom15
  • 16. © Wärtsilä NOT YET CLASSIFIED 5.8.2016 Fredrik Bonäs/ Kenneth Engblom16 TABLE OF CONTENTS Overview of Wärtsilä’s LNG solutions Liquefaction plants Terminals Summary
  • 17. © Wärtsilä NOT YET CLASSIFIED COMMITMENT TO CUSTOMER SATISFACTION • At Wärtsilä we know that every customer has unique expectations and priorities. We serve all of them with the same level of quality and excellence. • Projects are tailored to customer needs based on a set of pre-defined scopes and proven designs, that will provide a valuable asset with the highest possible quality at an affordable cost. 5.8.2016 Fredrik Bonäs/ Kenneth Engblom17
  • 18. © Wärtsilä NOT YET CLASSIFIED SUPPORT FOR THE WHOLE LIFE CYCLE 24 h Technical Support Wärtsilä Services’ global network Widest range of offering and expertise Wärtsilä Services provides full service throughout the product lifecycle for both Marine and Energy solutions customers, and is constantly developing its network worldwide.  70 countries, 200 locations, 11,000 service professionals 5.8.2016 Fredrik Bonäs/ Kenneth Engblom18
  • 19. © Wärtsilä NOT YET CLASSIFIED COMPLETE SOLUTIONS THAT BRING VALUE TO CUSTOMERS Project Development & Financing Technology EPC Operations & Maintenance LNG Terminal or Liquefaction Plant Gas / Dual-Fuel Power Plant 5.8.2016 Fredrik Bonäs/ Kenneth Engblom19