Testing in a scrum team
1. Testing in a Scrum Team
In this article I will discuss what types of testing I think should be done by a
Scrum Team, and what types could be done by someone outside of the team. To
be able to have this discussion, I will first need to define the different types of
testing I intend to use.
This model is an overview of the nomenclature I will use, and how I think the
different types of testing should be divided between the Scrum Team and the
rest of the organization.
Here are some quotes to better understand what the test types the Scrum Team
is responsible for mean:
“An integrated test is any (low level) test where when it fails you cannot pinpoint
exactly what went wrong.“ [1] [4]
“Integration testing is the phase in software testing in which individual software
modules are combined and tested as a group.” [4]
“Contract Tests explain how a class should extend a superclass or implement an
interface…” [1] [2]
Scrum Team
Scrum Team
Scrum Team
Scrum Team
Outside of Scrum Team
Isolated Tests
Contract/Collaboration Tests
Integrated Tests
System Tests
Equipment & Competence Specific Tests
2. “Collaboration Tests checks if a component talks to the next layer correctly.” [1]
[3]
“Collaboration tests are also called interaction tests to differentiate them from
state based tests.” [1] [3]
“The real benefit of isolated tests, of tests for one function at the time, is that
those tests put tremendous preassure on our designs.” [1][6]
“…unit testing (isolated tests) is a software testing method by which individual
units of source code, sets of one or more computer program modules together
with associated control data, usage procedures, and operating procedures, are
tested to determine whether they are fit for use.” [6]
This way the responsibility of the Scrum Team is pretty clear. How they do it; if
they do it with manual tests through the UI or using automated test, is up to the
team. Though the nomenclature obviously encourages writing automated tests.
The Scrum Team is responsible for the quality (shippable state [7]) of every
component they develop, how they communicate with each other, and that those
components work together as a group.
But there are some exceptions, and also some additional testing that must be
done before we can be confident that our test coverage is sufficiently mitigating
all relevant risks.
Let us start with the exceptions. If we have multiple Scrum Teams (if we don’t
then the following could, dependent on context, be included in the Scrum Teams
responsibility) then we may have tests that require certain tools or competence
that is not readily available to all Scrum Teams. To be able to scale, it can be a
reasonable approach to centralize these tests to a specific group of people that
serve all the Scrum Teams. One of the most obvious and simple examples can be
localization and culturalization [8] testing of features. Every Scrum Team cannot
be expected to know all languages and cultures that the product will be shipped
to, and thus will have problems testing these areas. There can be many tests with
similar competence or tool dependencies that must be moved out of the Scrum
Team, but exactly which these tests are is dependent on context.
Let’s move on to what additional tests must be performed after the Scrum Team
has done their part. If we have multiple Scrum Teams (if we don’t, then again this
will fall on the responsibility of the Scrum Team) and they all deliver their
perfectly (in theory) tested groups of components, then we might still end up in a
situation where the system does not work. But if we put this work on the Scrum
Team we will not only reduce their velocity, but also require them to test other
teams’ groups of components when they integrate their code. This will cause
ownership problems. In this case, one option is to have testers specialized in this
kind of testing taking responsibility for testing the complete system. Each Scrum
Team still has ownership of the quality of their code, and responsibility for fixing
any problems found during this test, but the responsibility for testing the whole
3. system can be transferred to this group of professional testers. The complexity of
this kind of system test also requires a different skillset than less complex low
level testing, which makes it suitable to have testers with this skillset handle the
task. I say that low level testing is less complex, but that in no way means that it
is easier, or less valuable.
With this nomenclature and division of different test types between the Scrum
Teams and other roles, I believe that it makes it clear what responsibility the
Scrum Teams have when it comes to testing, and what they can expect other
roles to help them with. I am not claiming that my way is in any way better than
other existing models, but it has helped me in my understanding of how to
efficiently work with test in Scrum.
/Johan Hoberg
4. References
[1] Integration tests are a scam
https://vimeo.com/80533536
http://www.infoq.com/presentations/integration-tests-scam
[2] Contract tests
http://thecodewhisperer.tumblr.com/post/1325859246/in-brief-contract-tests
http://thecodewhisperer.tumblr.com/post/1172613515/stub-your-data-
access-layer-it-wont-hurt
http://sharkzp.github.io/blog/2014/01/20/contract-tests/
[3] Collaboration Tests (Interaction Tests)
http://googletesting.blogspot.se/2013/03/testing-on-toilet-testing-state-
vs.html
[4] Integrated Tests / Integration Tests
http://en.wikipedia.org/wiki/Integration_testing
[5] System Tests
http://en.wikipedia.org/wiki/System_testing
[6] Unit Tests / Isolated Tests
http://en.wikipedia.org/wiki/Unit_testing
[7] Shippable State
http://www.infoq.com/news/2008/02/done-shippable-quality
[8] Localization vs. Culturalization
http://www.hitcents.com/blog/post/localization-vs-culturalization