BEACH STREET SEPARATED QUEUING LANE FINAL CONCEPT DESIGN NOVEMBER 2015
What we heard
Overall Prefered Option - OPTION 3
PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK
Consultation Process
The following community and stakeholder consultation
occurred as part the Concept Design Options consultation
process:
• ‘Have Your Say’ consultation website including an on-line
survey – completed by 18 persons
• Port Melbourne Waterfront UDF e-mailing list newsletter
sent to 758 interested persons and organisations
• External Stakeholder Workshop #2 on 2 September 2015
– attended by 18 persons from an invite list of 37 persons
• Council Website - project webpage
• Drop-In Information Session on 7 September 2015 -
attended by 7 persons
• Internal Stakeholder Workshop #2 on 16 September 2015
• Port of Melbourne Corporation and Trans-Tasman Line
meeting on 23 September 2015
Submissions Recieved
• A total of thirty-nine (39) written submissions were
received during the consultation period.
• Eighteen (18) submissions were received from participants
at the External Stakeholder Workshop 2
• Eighteen (18) submissions were received through “Have
Your Say” survey.
• Two (2) submissions were received by email from residents
• One (1) submission received from Port of Melbourne
Corporation
• One (1) submission verbally received from Trans-Tasman
Line
GENERAL COMMENTS
• Option1 is preferred due to its simplicity but it may not be able
to achieve the desired improvement. It’s well worth a try. •
Would like more information regarding the detail of the traffic
management proposals
• Option 1 is totally inadequate to address the issue of accessing
properties in Beach St when queuing gridlocks the Princes St
roundabout.
GENERAL COMMENTS
• They are all very similar except the destruction of landscaping in
option 3. none are imaginative. 2 seems slightly better than 1 in
widened roundabout access
• Seems to be the best option for all stakeholders.
• Congestion occurs pre-roundabout. To be honest, adding
a road bike lane in Option1 and 2 makes it more congested
surely. Option 3 at least gives people in cars a bit more queuing
space. But it takes a lot away.
• This is a highly congested area even in the winter months. I
believe there is a huge short sighted vision in not looking to
replacement of berthing for the Spirit of Tasmania to the new
Redevelopment of the Port.
GENERAL COMMENTS
• It’s the only one which has a chance of solving the queuing
problem - the others will make no effective difference.
• Option 3 appears to cater for more queuing vehicles and
provides better amenity in the area immediately north of Station
Pier
• Best solution for local amenity, pedestrian and cyclists while
providing improvements for traffic associated with ships.
Opportunity for community market and community activity area
a real plus.
• The best option to actually deal with the queuing for the Spirit.
• It’s the most practical to deal with a difficult situation.
OPTION 1:
Traffic Management Approach
Waterfront Place
Beach Street
Beach Street
PrincesStreet
StokeStreet
NottStreet
StationPier
1
OPTION 2a & 2b:
Traffic Infrastructure Approach
Waterfront Place
Beach Street
Beach Street
PrincesStreet
StokeStreet
NottStreet
StationPier
2a
2a
2b
2b
2a
2b
OPTION 3:
Precinct Approach
Waterfront Place
Beach Street
Beach Street
PrincesStreet
StokeStreet
NottStreet
StationPier
3
Option 1
Option 2
Option 3
0
2
4
6
8
10
Congestion Pedestrians Cyclists Landscaping Parking Amenity
Series1
Series2
Series3
Series4
Series5
0
2
4
6
8
10
12
14
16
Congestion Pedestrians Cyclists Landscaping Parking Amenity
Series1
Series2
Series3
Series4
Series5
0
2
4
6
8
10
12
14
16
18
20
Congestion Pedestrians Cyclists Landscaping Parking Amenity
Series1
Series2
Series3
Series4
Series5
2
13
20
Like it
Love it
Live with it
Lament it
Loathe it
Like it
Love it
Live with it
Lament it
Loathe it
Like it
Love it
Live with it
Lament it
Loathe it
BEACH STREET SEPARATED QUEUING LANE CONCEPT DESIGN OPTIONS SEPTEMBER 2015
PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK
BEACH STREET SEPARATED QUEUING LANE FINAL CONCEPT DESIGN NOVEMBER 2015
Final Concept Design Approach
PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK
STAGE 2: Minor Upgrade -
Beach Street/Watefront Place
WINTER 2016
STAGE 1: Traffic Management
SUMMER 2015/2016
STAGE 3: Major Upgrade -
Waterfront Place/Station Pier Carpark
Post 2017
• Expansion of traffic management by PoMC during cruise
ship docking and Spirit of Tasmania sailing to include the
Beach Street roundabout - NEW
• Better utilisation of the Station Pier carpark for queuing
during peak sailing periods
• Further investigation of additional traffic management
options for TT-Line and PoMC to put in place - NEW
• Capture baseline traffic queuing and movement data -
NEW
• Capture traffic queuing and movement change data
to determine both effectiveness of management
improvements and full scope of Stage 2 works - NEW
• on-road bike lane along Beach St between Beach St roundabout and Bay St
on both sides of road
• temporary queuing lane for use during peak periods from Bay Street to
Waterfront Place - inclusion of widened lane through the roundabout will be
dependant on the traffic analysis data received from Stage 1
• pedestrian crossing improvements around Beach Street roundabout
• no pedestrian lights - NEW
Additional elements have been included in response to community feedback
that were not part of the previous concept design options.
They are -
• native coastal landscape in two locations - next to the Rotunda and adjacent
to the roundabout - NEW
• a new pedestrian beach access terrace to improve the closest access to the
beach from the Port Melbourne Waterfront area. The terraced deck will also
function as a gathering spot - NEW
• capture traffic queuing and movement change data to determine both
effectiveness of improvements and full scope of Stage 3 works - NEW
• Investigate upgrading fence to the TT-Line truck park - NEW
Consistent with the majority of the feedback from the community,
Council is proposing to pursue the detailed design of the Waterfront
Place/Station Pier Carpark as the final stage of this approach. It will
include the following parts of the project -
• approval of detailed design brief for the whole area, including the
Waterfront Place plaza fronting onto the tram stop
• develop detailed design with community and relevant stakeholders
• approval of final design for construction
• continue to seek financial contribution to the final construction
from related state departments and associated businesses
BEACH STREET SEPARATED QUEUING LANE CONCEPT DESIGN OPTIONS SEPTEMBER 2015
PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK
BEACH STREET SEPARATED QUEUING LANE FINAL CONCEPT DESIGN NOVEMBER 2015
Final Concept Design Approach
PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK
STAGE 2: Minor Upgrade -
Beach Street/Watefront Place
WINTER 2016
Vehicle queuing
lane entrance with
removable bollards
New trees in parking
area to demarcate
temporary lane
New pedestrian crossing with
extension to existing median
and new refuge to strengthen
link from Stokes St to Rotunda
Improvements to
pedestrian crossing
including relocated
warning lights and
linemarking
New pedestrian crossings
Investigate improved on-
road cycling facilities
Removal of islands to allow
for queuing and through traffic
Widened access to Station
Pier to separate through
and queuing traffic. Extend
pedestrian crossings, modify
lighting and install removable
bollards
Roundabout queuing
lane access with
removable bollards
Driveway crossing levelled and
remarked to improve pedestrian
and bike safety Shared zone
pavement
treatment
Shared zone pavement
treatment. Vehicle access
design to be reviewed with
yacht club
Slow down area tactile
pavement marking to reduce
cyclist speed and raise
awareness of conflict points
Consolidate pedestrian
access to rotunda
New concrete and
timber deck with ramps,
steps, seating and shade
umbrellas
Realigned pedestrian crossing
New removable
bollards and relocated
palm trees
Shared paths
realigned
to improve
sightlines
pedestrian
and cycle
lane retained
as separate
New turf, shrub planting,
trees and benches
New on-road bike lane
New on-road bike lane
BEACH STREET SEPARATED QUEUING LANE CONCEPT DESIGN OPTIONS SEPTEMBER 2015
PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK
BEACH STREET SEPARATED QUEUING LANE FINAL CONCEPT DESIGN NOVEMBER 2015
Final Concept Design Approach
PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK
STAGE 2: Minor Upgrade -
Beach Street/Watefront Place
WINTER 2016
Non-queuing use (majority of year)
View of Beach Street Roundabout
View of Beach Street Roundabout
View of Waterfront Place
View of Waterfront Place
Queuing use (minority of year)

Mais conteúdo relacionado

Destaque

Social Games on Facebook: Worth it?
Social Games on Facebook: Worth it?Social Games on Facebook: Worth it?
Social Games on Facebook: Worth it?Sal DB
 
Redes sociales
Redes socialesRedes sociales
Redes socialesmichela8
 
Modern olympics gabby!
Modern olympics gabby!Modern olympics gabby!
Modern olympics gabby!stu_dev
 
ALAN FORD - GRUPA TNT
ALAN FORD - GRUPA TNTALAN FORD - GRUPA TNT
ALAN FORD - GRUPA TNTmabolky
 
Proyecto educativo institucional
Proyecto educativo institucionalProyecto educativo institucional
Proyecto educativo institucionalnilthonm
 
Hoja de Registro Rutas de senderismo o bicicleta
Hoja de Registro Rutas de senderismo o bicicletaHoja de Registro Rutas de senderismo o bicicleta
Hoja de Registro Rutas de senderismo o bicicletaCiclos Formativos
 
Graphic Design Services - MYQSOFT
Graphic Design Services - MYQSOFTGraphic Design Services - MYQSOFT
Graphic Design Services - MYQSOFTMYQSOFT
 
Skd 141311049 muflih adinata n_stand alone controller
Skd 141311049 muflih adinata n_stand alone controllerSkd 141311049 muflih adinata n_stand alone controller
Skd 141311049 muflih adinata n_stand alone controllerMuflih Negara
 

Destaque (13)

فیبر نوری
فیبر نوریفیبر نوری
فیبر نوری
 
Estigma
EstigmaEstigma
Estigma
 
Social Games on Facebook: Worth it?
Social Games on Facebook: Worth it?Social Games on Facebook: Worth it?
Social Games on Facebook: Worth it?
 
فیبر نوری
فیبر نوریفیبر نوری
فیبر نوری
 
Redes sociales
Redes socialesRedes sociales
Redes sociales
 
Modern olympics gabby!
Modern olympics gabby!Modern olympics gabby!
Modern olympics gabby!
 
ALAN FORD - GRUPA TNT
ALAN FORD - GRUPA TNTALAN FORD - GRUPA TNT
ALAN FORD - GRUPA TNT
 
Zaragoza turismo 385
Zaragoza turismo 385Zaragoza turismo 385
Zaragoza turismo 385
 
Proyecto educativo institucional
Proyecto educativo institucionalProyecto educativo institucional
Proyecto educativo institucional
 
Hoja de Registro Rutas de senderismo o bicicleta
Hoja de Registro Rutas de senderismo o bicicletaHoja de Registro Rutas de senderismo o bicicleta
Hoja de Registro Rutas de senderismo o bicicleta
 
Graphic Design Services - MYQSOFT
Graphic Design Services - MYQSOFTGraphic Design Services - MYQSOFT
Graphic Design Services - MYQSOFT
 
Blade Chroma REVIEW
Blade Chroma REVIEWBlade Chroma REVIEW
Blade Chroma REVIEW
 
Skd 141311049 muflih adinata n_stand alone controller
Skd 141311049 muflih adinata n_stand alone controllerSkd 141311049 muflih adinata n_stand alone controller
Skd 141311049 muflih adinata n_stand alone controller
 

Mais de City of Port Phillip

Queens Lane proposed upgrade works
Queens Lane proposed upgrade works Queens Lane proposed upgrade works
Queens Lane proposed upgrade works City of Port Phillip
 
Queens Lane proposed upgrade works
Queens Lane proposed upgrade worksQueens Lane proposed upgrade works
Queens Lane proposed upgrade worksCity of Port Phillip
 
South Melbourne Life Saving Club and public amenities redevelopment Concept D...
South Melbourne Life Saving Club and public amenities redevelopment Concept D...South Melbourne Life Saving Club and public amenities redevelopment Concept D...
South Melbourne Life Saving Club and public amenities redevelopment Concept D...City of Port Phillip
 
Central median trees - Wellington st upgrade
Central median trees - Wellington st upgradeCentral median trees - Wellington st upgrade
Central median trees - Wellington st upgradeCity of Port Phillip
 
City of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland stCity of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland stCity of Port Phillip
 

Mais de City of Port Phillip (6)

Queens Lane proposed upgrade works
Queens Lane proposed upgrade works Queens Lane proposed upgrade works
Queens Lane proposed upgrade works
 
Queens Lane proposed upgrade works
Queens Lane proposed upgrade worksQueens Lane proposed upgrade works
Queens Lane proposed upgrade works
 
South Melbourne Life Saving Club and public amenities redevelopment Concept D...
South Melbourne Life Saving Club and public amenities redevelopment Concept D...South Melbourne Life Saving Club and public amenities redevelopment Concept D...
South Melbourne Life Saving Club and public amenities redevelopment Concept D...
 
Wellington St Upgrade
Wellington St UpgradeWellington St Upgrade
Wellington St Upgrade
 
Central median trees - Wellington st upgrade
Central median trees - Wellington st upgradeCentral median trees - Wellington st upgrade
Central median trees - Wellington st upgrade
 
City of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland stCity of Port Phillip proposed Streescape for Acland st
City of Port Phillip proposed Streescape for Acland st
 

Último

Pope Francis Teaching: Dignitas Infinita- On Human Dignity
Pope Francis Teaching: Dignitas Infinita- On Human DignityPope Francis Teaching: Dignitas Infinita- On Human Dignity
Pope Francis Teaching: Dignitas Infinita- On Human DignityEnergy for One World
 
2024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 242024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 24JSchaus & Associates
 
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...Amil baba
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.Christina Parmionova
 
Republic Act 11032 (Ease of Doing Business and Efficient Government Service D...
Republic Act 11032 (Ease of Doing Business and Efficient Government Service D...Republic Act 11032 (Ease of Doing Business and Efficient Government Service D...
Republic Act 11032 (Ease of Doing Business and Efficient Government Service D...MartMantilla1
 
Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Christina Parmionova
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...Christina Parmionova
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfKatrina Sriranpong
 
Canadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfCanadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfAndrew Griffith
 
ISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaTrinity Care Foundation
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxjennysansano2
 
Digital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsDigital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsBeat Estermann
 
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...Energy for One World
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.Christina Parmionova
 
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptx
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptxPETTY CASH FUND - GOVERNMENT ACCOUNTING.pptx
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptxCrisAnnBusilan
 
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...Amil Baba Dawood bangali
 
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATIONGOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATIONShivamShukla147857
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOMAIRIEORGERUS
 
UN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 ReportUN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 ReportEnergy for One World
 

Último (20)

Pope Francis Teaching: Dignitas Infinita- On Human Dignity
Pope Francis Teaching: Dignitas Infinita- On Human DignityPope Francis Teaching: Dignitas Infinita- On Human Dignity
Pope Francis Teaching: Dignitas Infinita- On Human Dignity
 
2024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 242024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 24
 
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
Uk-NO1 Black magic Specialist Expert in Uk Usa Uae London Canada England Amer...
 
Housing For All - Fair Housing Choice Report
Housing For All - Fair Housing Choice ReportHousing For All - Fair Housing Choice Report
Housing For All - Fair Housing Choice Report
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -17 April.
 
Republic Act 11032 (Ease of Doing Business and Efficient Government Service D...
Republic Act 11032 (Ease of Doing Business and Efficient Government Service D...Republic Act 11032 (Ease of Doing Business and Efficient Government Service D...
Republic Act 11032 (Ease of Doing Business and Efficient Government Service D...
 
Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.Press Freedom in Europe - Time to turn the tide.
Press Freedom in Europe - Time to turn the tide.
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
 
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdfIf there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
If there is a Hell on Earth, it is the Lives of Children in Gaza.pdf
 
Canadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdfCanadian Immigration Tracker - Key Slides - February 2024.pdf
Canadian Immigration Tracker - Key Slides - February 2024.pdf
 
ISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, India
 
Professional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptxProfessional Conduct and ethics lecture.pptx
Professional Conduct and ethics lecture.pptx
 
Digital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical ImplicationsDigital Transformation of the Heritage Sector and its Practical Implications
Digital Transformation of the Heritage Sector and its Practical Implications
 
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
 
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptx
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptxPETTY CASH FUND - GOVERNMENT ACCOUNTING.pptx
PETTY CASH FUND - GOVERNMENT ACCOUNTING.pptx
 
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
NO1 Certified Best vashikaran specialist in UK USA UAE London Dubai Canada Am...
 
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATIONGOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
GOVERNMENT OF NCT OF DELHI DIRECTORATE OF EDUCATION
 
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFOPEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
PEO AVRIL POUR LA COMMUNE D'ORGERUS INFO
 
UN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 ReportUN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 Report
 

Beach Street final concept design

  • 1. BEACH STREET SEPARATED QUEUING LANE FINAL CONCEPT DESIGN NOVEMBER 2015 What we heard Overall Prefered Option - OPTION 3 PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK Consultation Process The following community and stakeholder consultation occurred as part the Concept Design Options consultation process: • ‘Have Your Say’ consultation website including an on-line survey – completed by 18 persons • Port Melbourne Waterfront UDF e-mailing list newsletter sent to 758 interested persons and organisations • External Stakeholder Workshop #2 on 2 September 2015 – attended by 18 persons from an invite list of 37 persons • Council Website - project webpage • Drop-In Information Session on 7 September 2015 - attended by 7 persons • Internal Stakeholder Workshop #2 on 16 September 2015 • Port of Melbourne Corporation and Trans-Tasman Line meeting on 23 September 2015 Submissions Recieved • A total of thirty-nine (39) written submissions were received during the consultation period. • Eighteen (18) submissions were received from participants at the External Stakeholder Workshop 2 • Eighteen (18) submissions were received through “Have Your Say” survey. • Two (2) submissions were received by email from residents • One (1) submission received from Port of Melbourne Corporation • One (1) submission verbally received from Trans-Tasman Line GENERAL COMMENTS • Option1 is preferred due to its simplicity but it may not be able to achieve the desired improvement. It’s well worth a try. • Would like more information regarding the detail of the traffic management proposals • Option 1 is totally inadequate to address the issue of accessing properties in Beach St when queuing gridlocks the Princes St roundabout. GENERAL COMMENTS • They are all very similar except the destruction of landscaping in option 3. none are imaginative. 2 seems slightly better than 1 in widened roundabout access • Seems to be the best option for all stakeholders. • Congestion occurs pre-roundabout. To be honest, adding a road bike lane in Option1 and 2 makes it more congested surely. Option 3 at least gives people in cars a bit more queuing space. But it takes a lot away. • This is a highly congested area even in the winter months. I believe there is a huge short sighted vision in not looking to replacement of berthing for the Spirit of Tasmania to the new Redevelopment of the Port. GENERAL COMMENTS • It’s the only one which has a chance of solving the queuing problem - the others will make no effective difference. • Option 3 appears to cater for more queuing vehicles and provides better amenity in the area immediately north of Station Pier • Best solution for local amenity, pedestrian and cyclists while providing improvements for traffic associated with ships. Opportunity for community market and community activity area a real plus. • The best option to actually deal with the queuing for the Spirit. • It’s the most practical to deal with a difficult situation. OPTION 1: Traffic Management Approach Waterfront Place Beach Street Beach Street PrincesStreet StokeStreet NottStreet StationPier 1 OPTION 2a & 2b: Traffic Infrastructure Approach Waterfront Place Beach Street Beach Street PrincesStreet StokeStreet NottStreet StationPier 2a 2a 2b 2b 2a 2b OPTION 3: Precinct Approach Waterfront Place Beach Street Beach Street PrincesStreet StokeStreet NottStreet StationPier 3 Option 1 Option 2 Option 3 0 2 4 6 8 10 Congestion Pedestrians Cyclists Landscaping Parking Amenity Series1 Series2 Series3 Series4 Series5 0 2 4 6 8 10 12 14 16 Congestion Pedestrians Cyclists Landscaping Parking Amenity Series1 Series2 Series3 Series4 Series5 0 2 4 6 8 10 12 14 16 18 20 Congestion Pedestrians Cyclists Landscaping Parking Amenity Series1 Series2 Series3 Series4 Series5 2 13 20 Like it Love it Live with it Lament it Loathe it Like it Love it Live with it Lament it Loathe it Like it Love it Live with it Lament it Loathe it
  • 2. BEACH STREET SEPARATED QUEUING LANE CONCEPT DESIGN OPTIONS SEPTEMBER 2015 PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK BEACH STREET SEPARATED QUEUING LANE FINAL CONCEPT DESIGN NOVEMBER 2015 Final Concept Design Approach PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK STAGE 2: Minor Upgrade - Beach Street/Watefront Place WINTER 2016 STAGE 1: Traffic Management SUMMER 2015/2016 STAGE 3: Major Upgrade - Waterfront Place/Station Pier Carpark Post 2017 • Expansion of traffic management by PoMC during cruise ship docking and Spirit of Tasmania sailing to include the Beach Street roundabout - NEW • Better utilisation of the Station Pier carpark for queuing during peak sailing periods • Further investigation of additional traffic management options for TT-Line and PoMC to put in place - NEW • Capture baseline traffic queuing and movement data - NEW • Capture traffic queuing and movement change data to determine both effectiveness of management improvements and full scope of Stage 2 works - NEW • on-road bike lane along Beach St between Beach St roundabout and Bay St on both sides of road • temporary queuing lane for use during peak periods from Bay Street to Waterfront Place - inclusion of widened lane through the roundabout will be dependant on the traffic analysis data received from Stage 1 • pedestrian crossing improvements around Beach Street roundabout • no pedestrian lights - NEW Additional elements have been included in response to community feedback that were not part of the previous concept design options. They are - • native coastal landscape in two locations - next to the Rotunda and adjacent to the roundabout - NEW • a new pedestrian beach access terrace to improve the closest access to the beach from the Port Melbourne Waterfront area. The terraced deck will also function as a gathering spot - NEW • capture traffic queuing and movement change data to determine both effectiveness of improvements and full scope of Stage 3 works - NEW • Investigate upgrading fence to the TT-Line truck park - NEW Consistent with the majority of the feedback from the community, Council is proposing to pursue the detailed design of the Waterfront Place/Station Pier Carpark as the final stage of this approach. It will include the following parts of the project - • approval of detailed design brief for the whole area, including the Waterfront Place plaza fronting onto the tram stop • develop detailed design with community and relevant stakeholders • approval of final design for construction • continue to seek financial contribution to the final construction from related state departments and associated businesses
  • 3. BEACH STREET SEPARATED QUEUING LANE CONCEPT DESIGN OPTIONS SEPTEMBER 2015 PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK BEACH STREET SEPARATED QUEUING LANE FINAL CONCEPT DESIGN NOVEMBER 2015 Final Concept Design Approach PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK STAGE 2: Minor Upgrade - Beach Street/Watefront Place WINTER 2016 Vehicle queuing lane entrance with removable bollards New trees in parking area to demarcate temporary lane New pedestrian crossing with extension to existing median and new refuge to strengthen link from Stokes St to Rotunda Improvements to pedestrian crossing including relocated warning lights and linemarking New pedestrian crossings Investigate improved on- road cycling facilities Removal of islands to allow for queuing and through traffic Widened access to Station Pier to separate through and queuing traffic. Extend pedestrian crossings, modify lighting and install removable bollards Roundabout queuing lane access with removable bollards Driveway crossing levelled and remarked to improve pedestrian and bike safety Shared zone pavement treatment Shared zone pavement treatment. Vehicle access design to be reviewed with yacht club Slow down area tactile pavement marking to reduce cyclist speed and raise awareness of conflict points Consolidate pedestrian access to rotunda New concrete and timber deck with ramps, steps, seating and shade umbrellas Realigned pedestrian crossing New removable bollards and relocated palm trees Shared paths realigned to improve sightlines pedestrian and cycle lane retained as separate New turf, shrub planting, trees and benches New on-road bike lane New on-road bike lane
  • 4. BEACH STREET SEPARATED QUEUING LANE CONCEPT DESIGN OPTIONS SEPTEMBER 2015 PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK BEACH STREET SEPARATED QUEUING LANE FINAL CONCEPT DESIGN NOVEMBER 2015 Final Concept Design Approach PORT MELBOURNE WATERFRONT URBAN DESIGN FRAMEWORK STAGE 2: Minor Upgrade - Beach Street/Watefront Place WINTER 2016 Non-queuing use (majority of year) View of Beach Street Roundabout View of Beach Street Roundabout View of Waterfront Place View of Waterfront Place Queuing use (minority of year)