Material Requirement
  Planning (MRP)
Contributors to MRP
•   Joseph Orlicky
•   George Plossl
•   Oliver Wight
•   American Production and Inventory
    Control Society
What is MRP?
•   Computerized Inventory Control
•   Production Planning System
•   Management Information System
•   Manufacturing Control System
When to use MRP
•   Job Shop Production
•   Complex Products
•   Assemble-to-Order Environments
•   Discrete and Dependent Demand Items
What can MRP do?
• Reduce Inventory Levels   • Reduce Purchasing Cost
• Reduce Component          • Improve Production
  Shortages                   Schedules
• Improve Shipping          • Reduce Manufacturing
  Performance                 Cost
• Improve Customer          • Reduce Lead Times
  Service                   • Less Scrap and Rework
• Improve Productivity      • Higher Production
• Simplified and Accurate     Quality
  Scheduling
What can MRP do?
• Improve               • Reduce Overtime
  Communication         • Improve Supply
• Improve Plant           Schedules
  Efficiency            • Improve Calculation of
• Reduce Freight Cost     Material Requirements
• Reduction in Excess   • Improve Competitive
  Inventory               Position
Three Basic Steps of MRP
• Identifying Requirements
• Running MRP – Creating the
  Suggestions
• Firming the Suggestions
Step 1: Identifying the
      Requirements
• Quantity on Hand
• Quantity on Open Purchase Order
• Quantity in/or Planned for
  Manufacturing
• Quantity Committed to Existing Orders
• Quantity Forecasted
Step 1: Important Information
          MRP is…..
• Company Sensitive
• Location Sensitive
• Date Sensitive
Step 2: Running MRP –
 Creating the Suggestions
• Critical Items
• Expedite Items
• Delay Items
Step 3: Firming the
        Suggestions
• Manufacturing Orders
• Purchasing Orders
• Various Reports
Overview of the MRP System
   Product         Master
                               Inventory
  Structure      Production
                               Master File
     File         Schedule


                  Material
                Requirements
                  Planning



Manufacturing     Purchase      Various
   Orders          Orders       Reports
MRP Inputs
• Product Structure File
• Master Production Schedule
• Inventory Master File
Product Structure File
• Bill of Materials
Master Production Schedule
• Schedule of Finished Products
• Represents Production, not Demand
• Combination of Customer Orders and
  Demand Forecasts
• What Needs to be Produced
Inventory Master File
•   On-Hand Quantities
•   On-Order Quantities
•   Lot Sizes
•   Safety Stock
•   Lead Time
•   Past-Usage Figures
MRP Process
• Schedules the Production of all items using
  an MRP Matrix
                               MRP Matrix
     Item:       Low-Level Code:
     Lot Size:        Lead Time:    PD 1    2 3 4 5
     Gross Requirements
     Scheduled Receipts
     Projected on Hand
     Net Requirements
     Planned Order Receipts
     Planned Order Releases
Terms Defined
• Item – name or number for the item being
  scheduled
• Low-Level Code – the lowest level of the item on
  the product structure file
• Lot Size – order multiples of quantity
• Lead Time – the time from when an order is
  placed to when it is received
• PD – Past Due Time Bucket, orders behind
  schedule
Terms Defined
• Gross Requirements – demand for an item by
  time period
• Scheduled Receipts – material already ordered
• Projected on Hand – expected ending inventory
• Net Requirements – number of items to be
  provided and when
• Planned Order Receipts – net requirements
  adjusted for lot size
• Planned Order Releases – planned order receipts
  offset for lead times
Example of the MRP Process
Item: A        Low-Level Code: 1
Lot Size: 25         Lead Time: 1
                                    PD   1    2    3   4   5
Gross Requirements                       10   15 25 25 30
Scheduled Receipts                            25
Projected on Hand                   20
Net Requirements

Planned Order Receipts

Planned Order Releases
Example of the MRP Process
Item: A          Low-Level Code: 1
Lot Size: 25 min     Lead Time: 1
                                     PD   1    2   3   4   5
Gross Requirements                        10   15 25 25 30
Scheduled Receipts                             25
Projected on Hand                    20   10   2 20 20 15

Net Requirements                                   5 5 10
P                                                  25 25 25
MRP Outputs
• Manufacturing Orders
• Purchasing Orders
• Various Reports
Hubbell Lighting Case
•   Manufactures Industrial Lighting Products
•   Good-Quality Products
•   Poor at Meeting Due Dates
•   Work is Specialized for Each Customer
•   Job Shop Environment
•   Complex Products
Hubbell Lighting Case
Before MRP Implementation   After MRP Implementation

• Less than 75% of orders   • 97% of orders completed
  completed on time           on time
                            • 2% of orders completed
                              with 1 to 2 days after due
                              date
Summary of MRP
MRP is a…..
• Computerized Inventory Control
• Production Planning System
that…..
• Schedules Component Items as Needed
which will…..
• Track Inventory and…..
• Help you in many other aspects of business
References
Russell, Roberta S., and Bernard W. Taylor III. Operations Management. 3rd
  Edition: Prentice Hall, 2000

Grubbstrom, Robert W. Material Requirements Planning and Manufacturing
   Resource Planning. 03/12/2002.
   http://www.itbp.com/opsmanagement/iebm/material_requirements.htm.

Vormittag Associates, Inc. System 2000 MRP. 03/12/2002.
  http://www.vaihome.com/s2000mrp.htm.

Inventory Solutions. What is MRP?. 03/12/2002.
   http://www.inventorysolutions.org/def_mrp.htm.

Mais conteúdo relacionado

Mais procurados

Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Akash Maurya
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement PlanningPritesh Mogane
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Snehav Sharma
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSNEHA GAUTAM
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)Ravimohan Rajmohan
 
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP) Konok Mondal
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)Dipesh Pandey
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL Junaid Hassan
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
Material requirement planning case study
Material requirement planning case studyMaterial requirement planning case study
Material requirement planning case studyVaibhav Kadu
 
Inventory management
 Inventory management Inventory management
Inventory managementN M
 
Bill of material
Bill of materialBill of material
Bill of materialBhaskar Das
 
Inventory and inventory management
Inventory and inventory managementInventory and inventory management
Inventory and inventory managementMohammed Jasir PV
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning Lokesh Modem
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 

Mais procurados (20)

(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
 
Ch17 Mrp
Ch17  MrpCh17  Mrp
Ch17 Mrp
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement Planning
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESS
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)
 
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP)
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
MRP I and MRP II
MRP I and MRP IIMRP I and MRP II
MRP I and MRP II
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Material requirement planning case study
Material requirement planning case studyMaterial requirement planning case study
Material requirement planning case study
 
Inventory management
 Inventory management Inventory management
Inventory management
 
Bill of material
Bill of materialBill of material
Bill of material
 
Inventory and inventory management
Inventory and inventory managementInventory and inventory management
Inventory and inventory management
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 

Destaque

MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPTom Matys
 
Logistics Strategy
Logistics StrategyLogistics Strategy
Logistics Strategyhanson han
 
Sameers Managing Customer Material Info Record
Sameers Managing Customer Material Info RecordSameers Managing Customer Material Info Record
Sameers Managing Customer Material Info Recordsameerbarde74
 
Scheduling agreement konwledge paper
Scheduling agreement konwledge paperScheduling agreement konwledge paper
Scheduling agreement konwledge paperarmindajack
 
Sap MM-configuration-step-by-step-guide
Sap MM-configuration-step-by-step-guideSap MM-configuration-step-by-step-guide
Sap MM-configuration-step-by-step-guideVenet Dheer
 
241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12Hashem Yahya Almahdi
 
Video Case 6 2
Video Case 6 2Video Case 6 2
Video Case 6 2Joanmaines
 
241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12Hashem Yahya Almahdi
 
MRP1 vs MRP2
MRP1 vs MRP2MRP1 vs MRP2
MRP1 vs MRP2Ari Limpo
 
MRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainMRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainSaad Munami
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop schedulingSujeet TAMBE
 
Supplier selection
Supplier selectionSupplier selection
Supplier selectionjoecobe
 

Destaque (20)

MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERP
 
Logistics Strategy
Logistics StrategyLogistics Strategy
Logistics Strategy
 
Sap configuration-guide
Sap configuration-guideSap configuration-guide
Sap configuration-guide
 
Sameers Managing Customer Material Info Record
Sameers Managing Customer Material Info RecordSameers Managing Customer Material Info Record
Sameers Managing Customer Material Info Record
 
Scheduling agreement konwledge paper
Scheduling agreement konwledge paperScheduling agreement konwledge paper
Scheduling agreement konwledge paper
 
Sap MM-configuration-step-by-step-guide
Sap MM-configuration-step-by-step-guideSap MM-configuration-step-by-step-guide
Sap MM-configuration-step-by-step-guide
 
241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12
 
Video Case 6 2
Video Case 6 2Video Case 6 2
Video Case 6 2
 
Heizer 14
Heizer 14Heizer 14
Heizer 14
 
Heizer om10 ch14-mrp
Heizer om10 ch14-mrpHeizer om10 ch14-mrp
Heizer om10 ch14-mrp
 
241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12241232978 solution-manual-om-ch-12
241232978 solution-manual-om-ch-12
 
MRP1 vs MRP2
MRP1 vs MRP2MRP1 vs MRP2
MRP1 vs MRP2
 
MRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainMRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chain
 
Logistics ppt
Logistics pptLogistics ppt
Logistics ppt
 
Supplier Selection
Supplier SelectionSupplier Selection
Supplier Selection
 
Vendor rating system
Vendor rating systemVendor rating system
Vendor rating system
 
Vendor rating
Vendor ratingVendor rating
Vendor rating
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
MRP
MRPMRP
MRP
 
Supplier selection
Supplier selectionSupplier selection
Supplier selection
 

Semelhante a Material requirement planning presentation

Material Requirement Planning Presentation.ppt
Material Requirement Planning Presentation.pptMaterial Requirement Planning Presentation.ppt
Material Requirement Planning Presentation.pptIdreesGulzar1
 
Material Requirement Planning Presentation.ppt
Material Requirement Planning Presentation.pptMaterial Requirement Planning Presentation.ppt
Material Requirement Planning Presentation.pptSaurabhPratap16
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBDrDeeptiSharma12
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)razinbabaria786
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planningnagarajusap06
 
7_production-activity-control.pptx
7_production-activity-control.pptx7_production-activity-control.pptx
7_production-activity-control.pptxRidhoDarmawan10
 
Mba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aMba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aRai University
 
Presentation on MRP Work flow
Presentation on MRP Work flowPresentation on MRP Work flow
Presentation on MRP Work flowShehzada Sohail
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.ppt128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.pptsathishkumar776149
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxIrelynJasmin
 
Manufacturing resource planning and capacity resource planning ppt
Manufacturing resource planning and capacity resource planning pptManufacturing resource planning and capacity resource planning ppt
Manufacturing resource planning and capacity resource planning pptAlbin Mathew
 
Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrpgsuicmez
 

Semelhante a Material requirement planning presentation (20)

Material Requirement Planning Presentation.ppt
Material Requirement Planning Presentation.pptMaterial Requirement Planning Presentation.ppt
Material Requirement Planning Presentation.ppt
 
Material Requirement Planning Presentation.ppt
Material Requirement Planning Presentation.pptMaterial Requirement Planning Presentation.ppt
Material Requirement Planning Presentation.ppt
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)
 
Mrp 1
Mrp 1Mrp 1
Mrp 1
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Sap mrp
Sap mrpSap mrp
Sap mrp
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planning
 
Sap pp dinakar skype himbuj
Sap pp  dinakar skype himbujSap pp  dinakar skype himbuj
Sap pp dinakar skype himbuj
 
7_production-activity-control.pptx
7_production-activity-control.pptx7_production-activity-control.pptx
7_production-activity-control.pptx
 
Mba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp aMba ii pmom_unit-2.5 resource planning -mrp a
Mba ii pmom_unit-2.5 resource planning -mrp a
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
Presentation on MRP Work flow
Presentation on MRP Work flowPresentation on MRP Work flow
Presentation on MRP Work flow
 
3. mrp1 pgp1
3. mrp1 pgp13. mrp1 pgp1
3. mrp1 pgp1
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
 
128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.ppt128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.ppt
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptx
 
Manufacturing resource planning and capacity resource planning ppt
Manufacturing resource planning and capacity resource planning pptManufacturing resource planning and capacity resource planning ppt
Manufacturing resource planning and capacity resource planning ppt
 
Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrp
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 

Último

08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 

Último (20)

08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 

Material requirement planning presentation

  • 1. Material Requirement Planning (MRP)
  • 2. Contributors to MRP • Joseph Orlicky • George Plossl • Oliver Wight • American Production and Inventory Control Society
  • 3. What is MRP? • Computerized Inventory Control • Production Planning System • Management Information System • Manufacturing Control System
  • 4. When to use MRP • Job Shop Production • Complex Products • Assemble-to-Order Environments • Discrete and Dependent Demand Items
  • 5. What can MRP do? • Reduce Inventory Levels • Reduce Purchasing Cost • Reduce Component • Improve Production Shortages Schedules • Improve Shipping • Reduce Manufacturing Performance Cost • Improve Customer • Reduce Lead Times Service • Less Scrap and Rework • Improve Productivity • Higher Production • Simplified and Accurate Quality Scheduling
  • 6. What can MRP do? • Improve • Reduce Overtime Communication • Improve Supply • Improve Plant Schedules Efficiency • Improve Calculation of • Reduce Freight Cost Material Requirements • Reduction in Excess • Improve Competitive Inventory Position
  • 7. Three Basic Steps of MRP • Identifying Requirements • Running MRP – Creating the Suggestions • Firming the Suggestions
  • 8. Step 1: Identifying the Requirements • Quantity on Hand • Quantity on Open Purchase Order • Quantity in/or Planned for Manufacturing • Quantity Committed to Existing Orders • Quantity Forecasted
  • 9. Step 1: Important Information MRP is….. • Company Sensitive • Location Sensitive • Date Sensitive
  • 10. Step 2: Running MRP – Creating the Suggestions • Critical Items • Expedite Items • Delay Items
  • 11. Step 3: Firming the Suggestions • Manufacturing Orders • Purchasing Orders • Various Reports
  • 12. Overview of the MRP System Product Master Inventory Structure Production Master File File Schedule Material Requirements Planning Manufacturing Purchase Various Orders Orders Reports
  • 13. MRP Inputs • Product Structure File • Master Production Schedule • Inventory Master File
  • 14. Product Structure File • Bill of Materials
  • 15. Master Production Schedule • Schedule of Finished Products • Represents Production, not Demand • Combination of Customer Orders and Demand Forecasts • What Needs to be Produced
  • 16. Inventory Master File • On-Hand Quantities • On-Order Quantities • Lot Sizes • Safety Stock • Lead Time • Past-Usage Figures
  • 17. MRP Process • Schedules the Production of all items using an MRP Matrix MRP Matrix Item: Low-Level Code: Lot Size: Lead Time: PD 1 2 3 4 5 Gross Requirements Scheduled Receipts Projected on Hand Net Requirements Planned Order Receipts Planned Order Releases
  • 18. Terms Defined • Item – name or number for the item being scheduled • Low-Level Code – the lowest level of the item on the product structure file • Lot Size – order multiples of quantity • Lead Time – the time from when an order is placed to when it is received • PD – Past Due Time Bucket, orders behind schedule
  • 19. Terms Defined • Gross Requirements – demand for an item by time period • Scheduled Receipts – material already ordered • Projected on Hand – expected ending inventory • Net Requirements – number of items to be provided and when • Planned Order Receipts – net requirements adjusted for lot size • Planned Order Releases – planned order receipts offset for lead times
  • 20. Example of the MRP Process Item: A Low-Level Code: 1 Lot Size: 25 Lead Time: 1 PD 1 2 3 4 5 Gross Requirements 10 15 25 25 30 Scheduled Receipts 25 Projected on Hand 20 Net Requirements Planned Order Receipts Planned Order Releases
  • 21. Example of the MRP Process Item: A Low-Level Code: 1 Lot Size: 25 min Lead Time: 1 PD 1 2 3 4 5 Gross Requirements 10 15 25 25 30 Scheduled Receipts 25 Projected on Hand 20 10 2 20 20 15 Net Requirements 5 5 10 P 25 25 25
  • 22. MRP Outputs • Manufacturing Orders • Purchasing Orders • Various Reports
  • 23. Hubbell Lighting Case • Manufactures Industrial Lighting Products • Good-Quality Products • Poor at Meeting Due Dates • Work is Specialized for Each Customer • Job Shop Environment • Complex Products
  • 24. Hubbell Lighting Case Before MRP Implementation After MRP Implementation • Less than 75% of orders • 97% of orders completed completed on time on time • 2% of orders completed with 1 to 2 days after due date
  • 25. Summary of MRP MRP is a….. • Computerized Inventory Control • Production Planning System that….. • Schedules Component Items as Needed which will….. • Track Inventory and….. • Help you in many other aspects of business
  • 26. References Russell, Roberta S., and Bernard W. Taylor III. Operations Management. 3rd Edition: Prentice Hall, 2000 Grubbstrom, Robert W. Material Requirements Planning and Manufacturing Resource Planning. 03/12/2002. http://www.itbp.com/opsmanagement/iebm/material_requirements.htm. Vormittag Associates, Inc. System 2000 MRP. 03/12/2002. http://www.vaihome.com/s2000mrp.htm. Inventory Solutions. What is MRP?. 03/12/2002. http://www.inventorysolutions.org/def_mrp.htm.

Notas do Editor

  1. Today we will discuss what Material Requirements Planning is and how we can use it in our organization.
  2. Material Requirements Planning was introduced in the 1970’s. Much of the credit goes to three individuals by the names of Joseph Orlicky, George Plossl, and Oliver Wight. The American Production and Inventory Control Society (APICS), which was endorsed by Orlicky, Plossl, and Wight, was also credited with the introduction of MRP.
  3. MRP is a system that controls inventory levels, plans production, helps supply management with important information, and helps with the manufacturing control system with respect to the production of assembled parts.
  4. There are certain environments or situations in which it is better and more efficient to use MRP. These environments and situations are as follows.
  5. MRP can do many things to help your company succeed. Probably the most important quality of MRP is the fact that it will help your company with inventory. It plans production so that the right materials are at the right place at the right time.
  6. Here are some qualities of MRP. MRP determines the latest possible time to product goods, buy materials, and add manufacturing value. Proper MRP can keep cash in the firm and still fulfill all production demands.
  7. The three basic steps of MRP are 1) Identifying requirements for items to be included in an MRP run, 2) Running the MRP and creating suggestions for action, and 3) firming the suggestions to release manufacturing orders and purchase orders.
  8. The MRP system looks at several components of demand in order to create its suggestions. The requirements include the above items. Many of these requirements are included in the master production schedules and inventory master files that will be discussed later in this presentation.
  9. The MRP system is company, location, and date sensitive. It is important that all data that is entered into the MRP system is accurate. Elements such as outdated bills of material, and lead times can negatively impact the results or MRP.
  10. At the end of each day, the MRP system will be run to identify items as critical, expedite, or delay. The MRP system will suggest if you need to order more of a certain material by classifying into the three categories. Critical items are items of immediate importance that should be taken care of right away. Expedite items are items that need to be sped up so that it is completed in less than the normal lead time. Delay items are item that are not of vital importance and can be delayed for the benefit of other items. If you wish, the MRP system can also give greater details such as expected receipt dates, and customer orders making up the demand.
  11. Once it has been run, the MRP system will suggest that the user send out a purchase order or manufacturing order. The user can then choose on whether to accept the suggestions of the system or change them. For example the MRP system will suggest that a purchase order be sent to order 100 units of material X. The user may accept this suggestion or change the information to fit what he thinks should be ordered. The MRP system keeps track of a vendor master file to ease of sending faxes, emails, or printouts of orders.
  12. The is an overview of how the MRP system works. The Orange boxes indicate the inputs into the MRP system. The MRP system then processes the information and delivers outputs as indicated by the yellow boxes.
  13. The three main inputs into the MRP system are product structure files, master production schedules, and inventory master files. These three main inputs summarize the input requirements described earlier.
  14. The product structure file contains a bill of material for every item produced. In other words, this file contains all the component parts for a larger item. For example if you are producing a car, the component parts for the car would be the screws, steel, rubber, and so on. Not only does the product structure contain all the component parts, it also supplies information for in which order the product is to be assembled. The MRP system accesses the product structure file to determine which component items need to be scheduled.
  15. The master production schedule specifies which end items or finished products the company is to produce, how many are needed, and when they are needed. The numbers that are on the master production schedule represent production, not demand, may be a combination of customer orders and demand forecasts, and gives what needs to be produced.
  16. This file includes all the numbers from inventory. The MRP system keeps track of your inventory and when more items need to be ordered. It is important that you inventory numbers are accurate from the beginning in order for the MRP system to work properly.
  17. During the process, the the system uses an MRP matrix to record the calculations that are made. From the inputs discussed earlier in the presentation, the system calculates the gross requirements, scheduled receipts, projected on hand, net requirements, planned order receipts, and planned order releases.
  18. Some of the terms that are used with the MRP matrix are defined above. This should help the user understand how the MRP calculates everything.
  19. More terms defined.
  20. Here’s an example of how the MRP process works. This is a preliminary schedule that the MRP system gathered from the master production schedule, inventory master file, and product structure file. The question now is in what period should orders be released and what should be the size of those orders?
  21. For period 1 we first want to calculate the projected on hand. This is done by subtracting the gross requirements in period one from the sum of the scheduled receipts in period 1, projected on hand from the previous period, and the planned order releases from the (t-l) period where t is the current period and l is the lead time. So the projected on hand for period 1 is 20 minus 10. The planned order releases are in sizes of 25 so we have planned order release of 25 for period one. Period two we repeat the same process. Now in period 3 we need to calculate the net requirements along with the projected on hand. The projected on hand = ((20+25)-25) = 20. The net requirements is calculated by subtracting the scheduled receipts (0) in the period plus the projected on hand in the previous period (20) from gross requirements (25) which equals 5. You want to repeat this process for all the periods. In the end the answer should be that orders should be released in periods 1,2,3,4, and 5 for quantities of 25,25,25,30, and 25 respectively.
  22. The MRP system delivers two main outputs along with various other reports. The two main outputs are manufacturing orders which can be released to shop floors for in-house production and purchasing orders which are sent to outside suppliers. The various reports offer suggested changes in previous plans or existing schedules.
  23. Hubbell light manufactures industrial lighting products for schools, malls, NASA, and other companies. They have a strong reputation of making good-quality products but also have a reputation of not meeting due dates. Their work is very specialized, in a job shop environment, and they make complex products. They have 3,200 end items. Some of which consist of 15,000 component parts that can be configured into over 5 million different final products. This situation would involve complex bills of material, production schedules and inventory files. This is an ideal situation to implement MRP.
  24. Hubbell lighting decided to implement an MRP system to improve its overall capabilities and completion times. Before the MRP implementation, Hubbell Lighting completed less the 75% of its orders on time. After the MRP implementation, on time orders rose to 97% with 2% of orders completed with 1 to 2 days of the promised completion time.
  25. Read the Summary above.
  26. All information on this slide show was gathered from the above resources.