TOYOTA MOTOR
MANUFACTURING,
     U.S.A
    Case Analysis


     Powerpoint Templates   Page 1
Toyota Motors Manufacturing (TMM) faces
   increasing problems with its seat supply.
TMM’s single seat supplier, Kentucky Framed
 Seat (KFS), is responsible for the majority of
the problems with material flaws and missing
    parts as the major encountered defects.



               Powerpoint Templates       Page 2
These problems are increasingly occurring
with an increase in varieties of and demand for
the seats. Toyota currently addresses these
problems offline; however, this is a deviation
from the policies and procedures under the
Toyota Production System (TPS). Now, as
TMM ramps up for the production of the
Camry Wagon, it must address the seat issue
before seriously impacting production
performance.

                Powerpoint Templates       Page 3
THIS IS CAUSED BY THREE
                      FACTORS
• 1) Seats need to match each particular car,
  therefore stock parts cannot be used
• 2) The supplier process operates under Just In
  Time (JIT)
• 3) KFS cannot readily supply replacements for
  defective seats


                 Powerpoint Templates       Page 4
PURCHASE DEPARTMENT
  SUGGESTIONS TO TOP
  LEVEL MANAGEMENT



       Powerpoint Templates   Page 5
Q1.BUYING QUALITY MATERIAL AT LOW PRICES:
SOLUTION:
• Purchase Department has suggested following ways to
  procure material at low price and with best quality:
• Downward Integration: As Toyota is huge industry and
  requires large no of stock so if it can go for downward
  integration it would be a good idea as than it can very well
  control the inventory for JIT and it will also have a total
  quality control and will save the cost.
• Quality Control : Quality check Teams can be formed which
  would work in close collaboration with suppliers so to check
  on quality of materials supplied by them and suggest them
  measures to overcome any defect in their manufacturing
  process

                      Powerpoint Templates               Page 6
• Build a Supplier Chain Development Program: This
   program would help in providing suppliers training and
   development for their existing staff and manufacturing process
   by providing them technological aid and at the same time
   management expertise.
  It can include development of techniques like
• 1. Six Sigma
• 2. JIT
• 3. KAIZEN
  All this will reduce their cost of production which in turn will
   help Toyota to acquire raw materials and low price without
   actually lowering profit margin of suppliers and gaining their
   confidence.

                       Powerpoint Templates                 Page 7
Problem 2: Providing Data having Cost of
Production to TOP LEVEL MANAGEMENT

Solution: This would be tough deal to crack as nobody
will like to share their cost of production with other
company but this can be done by entering into contract
with them to share their cost of production so that
without lowering their profit margin we can help them
to reduce their cost of production and providing them
aid in management as well as production process so that
they can work up to their full efficiency.


                    Powerpoint Templates           Page 8
QUALITY CONTROL
  DEPARTMENT


     Powerpoint Templates   Page 9
1.Procurement schedule should match with
 production schedule.
 2. Seat material would be provided at the time
 of procurement of seats.
 3. When the cars would be finally made, a
 quality check would be done.
 4 . Direct link between production and
 operation department.
 5. Scheduling process= production schedule


               Powerpoint Templates       Page 10
MANUFACTURING AND
   INSTALLATION



      Powerpoint Templates   Page 11
Q. How do we reduce the manufacturing and installation
   time?
Ans. The manufacturing and installation time can be reduced by
   following the following options:
1. As Toyota can use combined seat installation technique, as
   they have made two separate systems in a divided order, in
   order to install two seats, so these systems can be combined so
   that the seats are installed in a car simultaneously, and the time
   would be saved.
2. We can use a better robot, which is much efficient and quick.
   As when the robot will be quick enough to cope up with faster
   production , painting system would receive the car sooner,
   thereby increasing the manufacturing speed.

                          Powerpoint Templates                  Page 12
INVENTORY
MANAGEMENT
DEPARTMENT



  Powerpoint Templates   Page 13
Q1-Provide all information on Kanban cards for inventory
movement?
Ans.- A Kanban Card include a part code number, its batch
size, its delivery address and other related information. Every
part container sitting on the flow rack along the assembly line
held one batch & had its own card. The card would physically
travel between this part -use point & the supplier, whether in
house or outside to signal the actual parts needed. When the
supplier receive the Kanban, it began making that part in the
stated quantity, & shipped a container full of that part to the
proper address on the assembly line. Assembly group leaders
adjust the number of circulating kanbans for each part within
the set range to avoid having team runs out of every parts.
Kanban cards are used by PC department to determine
appropriate kanban range & to feed information back to parts
ordering for even better inventory control.
                      Powerpoint Templates                 Page 14
Q2- Feed necessary parts into TMM operating that are
  needed and write the no. of cars that could be delivered to
  sale with JUST IN TIME.
Ans.- To feed necessary parts into TMM operating PC relied on the extensive
  forecasting and planning that TMC performed for worldwide markets. To
  prepare for May production, for example, PC first received, in January, a
  Production Planning Order (PPO) for key specifications from the sales
  company. This PPO was revised in February and, after one more update,
  was fixed as a Total Vehicle Order (TVO) by the end of March. While total
  volume was fixed in the late March, the PPO was generally accurate only
  within "20%" of the TVO for most specification categories at that
  point. Next, the TVO was broken down weekly: by the end of the second
  week of April it was done for the first week of May. During the third week
  of April, the initial May week's information was translated into final part
  orders for local suppliers as well as a daily production sequence for TMM
  operations. This procedure left one full week for production preparation.
   The number of cars would call for 500 base models and 500 luxury models
  every single day and also demand that a base model and a luxury model be
  made alternately.          Powerpoint Templates                      Page 15
Q3- Need to balance out the total order in daily production
  sequence Hijunka practice?
Ans.- By balancing of the total order in daily production
  sequence Hijunka practice, the same supplier could stick to a
  uniform cycle time throughout the month without creating the
  waste of inventory. Similarly, offsetting cars that required a
  particular operation against those that did not prevented any
  particular work station from becoming a severe bottleneck or
  remaining unreasonably idle. Hijunka also synchronized the
  assembly line with the ultimate sales of the cars.




                       Powerpoint Templates                Page 16
SUPPLIERS
HANDLING




 Powerpoint Templates   Page 17
CONTRACT BETWEEN TOYOTA AND
          COMPONENT SUPPLIERS
Based on the principle of “long-term stable transaction”,
Toyota makes an unique “basic control of component
transaction” with a component supplier. On this contract
Toyota confirms to promote long lasting prosperity for both
parties and an ideal quality assurance for customers. Hoping
that, perfect quality control is carried but by every component
manufacturer, Toyota includes in the contract the basic rules of
quality control, the steps to be followed when defective goods
come out and etc.




                     Powerpoint Templates                 Page 18
UPBRINGING OF COMPONENT
                      SUPPLIERS
• In order to develop the component suppliers Toyota
  assists them in improving management as well as
  quality control. Various means are available for
  assisting suppliers in improving systems of
  management such as:
• Toyota quality Control Reward
• Guidance of Toyota Production system (Kanban
  System)
• Mutual development by supplier’s organization and
  etc.
                   Powerpoint Templates          Page 19
Powerpoint Templates   Page 20
COMPILED BY-
                              AAMUKTA MURTI
                               DEVENDRAN S.P
                               GAURAV KHATRI
                              PUSHPAM SHREE
                          SIDDHARTH TRIPATHI
                                 TIMSI LUTHRA
                      VANDANA MADHURI SINGH




               Powerpoint Templates       Page 21

Mais conteúdo relacionado

Mais procurados

Atlantic Computers: A Bundle of Pricing Options
Atlantic Computers: A Bundle of Pricing OptionsAtlantic Computers: A Bundle of Pricing Options
Atlantic Computers: A Bundle of Pricing OptionsJasmineDennis
 
Dell's Working Capital
Dell's Working CapitalDell's Working Capital
Dell's Working CapitalRohit Patidar
 
Mrs. fields cookies odc section c_group 9
Mrs. fields cookies odc section c_group 9Mrs. fields cookies odc section c_group 9
Mrs. fields cookies odc section c_group 9Karan Jaidka
 
Wilkerson Company Case
Wilkerson Company CaseWilkerson Company Case
Wilkerson Company CaseElla Shen
 
Merloni elettrodomestici SPA
Merloni elettrodomestici SPAMerloni elettrodomestici SPA
Merloni elettrodomestici SPASanket Golechha
 
Apex corporation case study
Apex corporation case studyApex corporation case study
Apex corporation case studyUtkarsh Shivam
 
CASE STUDY : The Treadway Tire Company
CASE STUDY : The Treadway Tire CompanyCASE STUDY : The Treadway Tire Company
CASE STUDY : The Treadway Tire CompanyTanya Taneja
 
National cranberry cooperative
National cranberry cooperativeNational cranberry cooperative
National cranberry cooperativePallavi Bharti
 
Classic pen company activity based costing
Classic pen company activity based costingClassic pen company activity based costing
Classic pen company activity based costingHarish B
 
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS Akshay Jain
 
The Case Analysis: Benihana of Tokyo
The Case Analysis: Benihana of TokyoThe Case Analysis: Benihana of Tokyo
The Case Analysis: Benihana of TokyoLuqman Praditio
 
Itt global manufacturing strategy os
Itt global manufacturing strategy osItt global manufacturing strategy os
Itt global manufacturing strategy osAbhijeet Kumar
 

Mais procurados (20)

Zipcar Case Study
Zipcar Case StudyZipcar Case Study
Zipcar Case Study
 
Yushan case new
Yushan case newYushan case new
Yushan case new
 
Atlantic Computers: A Bundle of Pricing Options
Atlantic Computers: A Bundle of Pricing OptionsAtlantic Computers: A Bundle of Pricing Options
Atlantic Computers: A Bundle of Pricing Options
 
Dell's Working Capital
Dell's Working CapitalDell's Working Capital
Dell's Working Capital
 
Acme and omega
Acme and omegaAcme and omega
Acme and omega
 
Mrs. fields cookies odc section c_group 9
Mrs. fields cookies odc section c_group 9Mrs. fields cookies odc section c_group 9
Mrs. fields cookies odc section c_group 9
 
Wilkerson Company Case
Wilkerson Company CaseWilkerson Company Case
Wilkerson Company Case
 
Merloni elettrodomestici SPA
Merloni elettrodomestici SPAMerloni elettrodomestici SPA
Merloni elettrodomestici SPA
 
Apex corporation case study
Apex corporation case studyApex corporation case study
Apex corporation case study
 
CASE STUDY : The Treadway Tire Company
CASE STUDY : The Treadway Tire CompanyCASE STUDY : The Treadway Tire Company
CASE STUDY : The Treadway Tire Company
 
National cranberry cooperative
National cranberry cooperativeNational cranberry cooperative
National cranberry cooperative
 
Airborne Express
Airborne ExpressAirborne Express
Airborne Express
 
Classic pen company activity based costing
Classic pen company activity based costingClassic pen company activity based costing
Classic pen company activity based costing
 
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS
 
The Case Analysis: Benihana of Tokyo
The Case Analysis: Benihana of TokyoThe Case Analysis: Benihana of Tokyo
The Case Analysis: Benihana of Tokyo
 
Zipcar case study
Zipcar case studyZipcar case study
Zipcar case study
 
Fold rite furniture v1.7
Fold rite furniture v1.7Fold rite furniture v1.7
Fold rite furniture v1.7
 
Itt global manufacturing strategy os
Itt global manufacturing strategy osItt global manufacturing strategy os
Itt global manufacturing strategy os
 
Toyota case study
   Toyota case study   Toyota case study
Toyota case study
 
Southwest Airlines Case Study
Southwest Airlines Case Study Southwest Airlines Case Study
Southwest Airlines Case Study
 

Semelhante a Toyota motor manufacturing: Problems and solutions

Toyota Supply chain Management
Toyota Supply chain Management Toyota Supply chain Management
Toyota Supply chain Management Siddhi Suthar
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and BoeingMutunga David
 
Ji tstrategy
Ji tstrategyJi tstrategy
Ji tstrategynikpet83
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxssusera34210
 
TPS Basics Trg Material (NXPowerLite)
TPS Basics Trg Material (NXPowerLite)TPS Basics Trg Material (NXPowerLite)
TPS Basics Trg Material (NXPowerLite)Himanshu Pandya
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)pratik negi
 
F444652
F444652F444652
F444652aijbm
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturingAkhil Bhatia
 
BMW Showcase - Celosphere 2019
BMW Showcase - Celosphere 2019BMW Showcase - Celosphere 2019
BMW Showcase - Celosphere 2019Celonis
 
Adaptive Automotive Development: Faster and more targeted innovations through...
Adaptive Automotive Development: Faster and more targeted innovations through...Adaptive Automotive Development: Faster and more targeted innovations through...
Adaptive Automotive Development: Faster and more targeted innovations through...Christian Mies
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Exampleshekhar619
 
Lean manufacturing concepts
Lean manufacturing conceptsLean manufacturing concepts
Lean manufacturing conceptsSatyendra Sinha
 
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...IRJET Journal
 
Proposal Version 5
Proposal  Version 5Proposal  Version 5
Proposal Version 5Mark Forster
 
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...Md.Nazrul Islam
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, leanNishit Patel
 

Semelhante a Toyota motor manufacturing: Problems and solutions (20)

Toyota case
Toyota caseToyota case
Toyota case
 
Toyota Supply chain Management
Toyota Supply chain Management Toyota Supply chain Management
Toyota Supply chain Management
 
Lean production in Toyota and Boeing
Lean production in Toyota and BoeingLean production in Toyota and Boeing
Lean production in Toyota and Boeing
 
Toyota
ToyotaToyota
Toyota
 
Ji tstrategy
Ji tstrategyJi tstrategy
Ji tstrategy
 
The Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docxThe Toyota Company is the biggest auto-manufacture in the world. T.docx
The Toyota Company is the biggest auto-manufacture in the world. T.docx
 
TPS Basics Trg Material (NXPowerLite)
TPS Basics Trg Material (NXPowerLite)TPS Basics Trg Material (NXPowerLite)
TPS Basics Trg Material (NXPowerLite)
 
170 Fundamentals of Lean Thinking 2014 01
170 Fundamentals of Lean Thinking 2014 01170 Fundamentals of Lean Thinking 2014 01
170 Fundamentals of Lean Thinking 2014 01
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)
 
F444652
F444652F444652
F444652
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturing
 
BMW Showcase - Celosphere 2019
BMW Showcase - Celosphere 2019BMW Showcase - Celosphere 2019
BMW Showcase - Celosphere 2019
 
Adaptive Automotive Development: Faster and more targeted innovations through...
Adaptive Automotive Development: Faster and more targeted innovations through...Adaptive Automotive Development: Faster and more targeted innovations through...
Adaptive Automotive Development: Faster and more targeted innovations through...
 
Self
SelfSelf
Self
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Example
 
Lean manufacturing concepts
Lean manufacturing conceptsLean manufacturing concepts
Lean manufacturing concepts
 
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
OPTIMIZATION IN MES BY IMPLEMENTING SMART ANDON SYSTEM FOR PRODUCTIVITY ENHAN...
 
Proposal Version 5
Proposal  Version 5Proposal  Version 5
Proposal Version 5
 
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
The Practice of `Just-in-Time' Production Model in Toyota Automobile Company ...
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, lean
 

Mais de Gaurav Khatri

Basics of supply & market equilibrium
Basics of supply & market equilibriumBasics of supply & market equilibrium
Basics of supply & market equilibriumGaurav Khatri
 
McDonalds Training and Development
McDonalds Training and DevelopmentMcDonalds Training and Development
McDonalds Training and DevelopmentGaurav Khatri
 
Preventing Brand Failure
Preventing Brand FailurePreventing Brand Failure
Preventing Brand FailureGaurav Khatri
 
case write up: Omnicom
case write up: Omnicom case write up: Omnicom
case write up: Omnicom Gaurav Khatri
 
Brand personality of Coca Cola
Brand personality of Coca ColaBrand personality of Coca Cola
Brand personality of Coca ColaGaurav Khatri
 
The Porsche case Summary
The Porsche case SummaryThe Porsche case Summary
The Porsche case SummaryGaurav Khatri
 
Sharekhan Ltd. Online trading
Sharekhan Ltd. Online tradingSharekhan Ltd. Online trading
Sharekhan Ltd. Online tradingGaurav Khatri
 
Unique Brand Elements of Gillette Mach 3
Unique Brand Elements of Gillette Mach 3Unique Brand Elements of Gillette Mach 3
Unique Brand Elements of Gillette Mach 3Gaurav Khatri
 
Brand elements Of Gillette Mach 3
Brand elements Of Gillette Mach 3Brand elements Of Gillette Mach 3
Brand elements Of Gillette Mach 3Gaurav Khatri
 
consumer buying behaviour of branded and non branded jewellery
consumer buying behaviour of branded and non branded jewelleryconsumer buying behaviour of branded and non branded jewellery
consumer buying behaviour of branded and non branded jewelleryGaurav Khatri
 
Future educations in India
Future educations in IndiaFuture educations in India
Future educations in IndiaGaurav Khatri
 
Cost Accounting: Decision making relating to the different costs
Cost Accounting: Decision making relating to the different costsCost Accounting: Decision making relating to the different costs
Cost Accounting: Decision making relating to the different costsGaurav Khatri
 
Business intellegence
Business intellegenceBusiness intellegence
Business intellegenceGaurav Khatri
 
Economics project on demand and supply of fresh vegetables
Economics project on demand and supply of fresh vegetablesEconomics project on demand and supply of fresh vegetables
Economics project on demand and supply of fresh vegetablesGaurav Khatri
 
Non performing assets in Banks
Non performing assets in BanksNon performing assets in Banks
Non performing assets in BanksGaurav Khatri
 

Mais de Gaurav Khatri (20)

Basics of supply & market equilibrium
Basics of supply & market equilibriumBasics of supply & market equilibrium
Basics of supply & market equilibrium
 
McDonalds Training and Development
McDonalds Training and DevelopmentMcDonalds Training and Development
McDonalds Training and Development
 
Cool Entrepreneurs
Cool EntrepreneursCool Entrepreneurs
Cool Entrepreneurs
 
Interview success
Interview successInterview success
Interview success
 
Preventing Brand Failure
Preventing Brand FailurePreventing Brand Failure
Preventing Brand Failure
 
Idea: case study
Idea: case studyIdea: case study
Idea: case study
 
case write up: Omnicom
case write up: Omnicom case write up: Omnicom
case write up: Omnicom
 
Brand personality of Coca Cola
Brand personality of Coca ColaBrand personality of Coca Cola
Brand personality of Coca Cola
 
The Porsche case Summary
The Porsche case SummaryThe Porsche case Summary
The Porsche case Summary
 
Sharekhan Ltd. Online trading
Sharekhan Ltd. Online tradingSharekhan Ltd. Online trading
Sharekhan Ltd. Online trading
 
Unique Brand Elements of Gillette Mach 3
Unique Brand Elements of Gillette Mach 3Unique Brand Elements of Gillette Mach 3
Unique Brand Elements of Gillette Mach 3
 
Brand elements Of Gillette Mach 3
Brand elements Of Gillette Mach 3Brand elements Of Gillette Mach 3
Brand elements Of Gillette Mach 3
 
consumer buying behaviour of branded and non branded jewellery
consumer buying behaviour of branded and non branded jewelleryconsumer buying behaviour of branded and non branded jewellery
consumer buying behaviour of branded and non branded jewellery
 
Future educations in India
Future educations in IndiaFuture educations in India
Future educations in India
 
Cost Accounting: Decision making relating to the different costs
Cost Accounting: Decision making relating to the different costsCost Accounting: Decision making relating to the different costs
Cost Accounting: Decision making relating to the different costs
 
Business intellegence
Business intellegenceBusiness intellegence
Business intellegence
 
Economics project on demand and supply of fresh vegetables
Economics project on demand and supply of fresh vegetablesEconomics project on demand and supply of fresh vegetables
Economics project on demand and supply of fresh vegetables
 
Data warehousing
Data warehousingData warehousing
Data warehousing
 
Music
MusicMusic
Music
 
Non performing assets in Banks
Non performing assets in BanksNon performing assets in Banks
Non performing assets in Banks
 

Último

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Phases of negotiation .pptx
 Phases of negotiation .pptx Phases of negotiation .pptx
Phases of negotiation .pptxnandhinijagan9867
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 

Último (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Phases of negotiation .pptx
 Phases of negotiation .pptx Phases of negotiation .pptx
Phases of negotiation .pptx
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 

Toyota motor manufacturing: Problems and solutions

  • 1. TOYOTA MOTOR MANUFACTURING, U.S.A Case Analysis Powerpoint Templates Page 1
  • 2. Toyota Motors Manufacturing (TMM) faces increasing problems with its seat supply. TMM’s single seat supplier, Kentucky Framed Seat (KFS), is responsible for the majority of the problems with material flaws and missing parts as the major encountered defects. Powerpoint Templates Page 2
  • 3. These problems are increasingly occurring with an increase in varieties of and demand for the seats. Toyota currently addresses these problems offline; however, this is a deviation from the policies and procedures under the Toyota Production System (TPS). Now, as TMM ramps up for the production of the Camry Wagon, it must address the seat issue before seriously impacting production performance. Powerpoint Templates Page 3
  • 4. THIS IS CAUSED BY THREE FACTORS • 1) Seats need to match each particular car, therefore stock parts cannot be used • 2) The supplier process operates under Just In Time (JIT) • 3) KFS cannot readily supply replacements for defective seats Powerpoint Templates Page 4
  • 5. PURCHASE DEPARTMENT SUGGESTIONS TO TOP LEVEL MANAGEMENT Powerpoint Templates Page 5
  • 6. Q1.BUYING QUALITY MATERIAL AT LOW PRICES: SOLUTION: • Purchase Department has suggested following ways to procure material at low price and with best quality: • Downward Integration: As Toyota is huge industry and requires large no of stock so if it can go for downward integration it would be a good idea as than it can very well control the inventory for JIT and it will also have a total quality control and will save the cost. • Quality Control : Quality check Teams can be formed which would work in close collaboration with suppliers so to check on quality of materials supplied by them and suggest them measures to overcome any defect in their manufacturing process Powerpoint Templates Page 6
  • 7. • Build a Supplier Chain Development Program: This program would help in providing suppliers training and development for their existing staff and manufacturing process by providing them technological aid and at the same time management expertise. It can include development of techniques like • 1. Six Sigma • 2. JIT • 3. KAIZEN All this will reduce their cost of production which in turn will help Toyota to acquire raw materials and low price without actually lowering profit margin of suppliers and gaining their confidence. Powerpoint Templates Page 7
  • 8. Problem 2: Providing Data having Cost of Production to TOP LEVEL MANAGEMENT Solution: This would be tough deal to crack as nobody will like to share their cost of production with other company but this can be done by entering into contract with them to share their cost of production so that without lowering their profit margin we can help them to reduce their cost of production and providing them aid in management as well as production process so that they can work up to their full efficiency. Powerpoint Templates Page 8
  • 9. QUALITY CONTROL DEPARTMENT Powerpoint Templates Page 9
  • 10. 1.Procurement schedule should match with production schedule. 2. Seat material would be provided at the time of procurement of seats. 3. When the cars would be finally made, a quality check would be done. 4 . Direct link between production and operation department. 5. Scheduling process= production schedule Powerpoint Templates Page 10
  • 11. MANUFACTURING AND INSTALLATION Powerpoint Templates Page 11
  • 12. Q. How do we reduce the manufacturing and installation time? Ans. The manufacturing and installation time can be reduced by following the following options: 1. As Toyota can use combined seat installation technique, as they have made two separate systems in a divided order, in order to install two seats, so these systems can be combined so that the seats are installed in a car simultaneously, and the time would be saved. 2. We can use a better robot, which is much efficient and quick. As when the robot will be quick enough to cope up with faster production , painting system would receive the car sooner, thereby increasing the manufacturing speed. Powerpoint Templates Page 12
  • 14. Q1-Provide all information on Kanban cards for inventory movement? Ans.- A Kanban Card include a part code number, its batch size, its delivery address and other related information. Every part container sitting on the flow rack along the assembly line held one batch & had its own card. The card would physically travel between this part -use point & the supplier, whether in house or outside to signal the actual parts needed. When the supplier receive the Kanban, it began making that part in the stated quantity, & shipped a container full of that part to the proper address on the assembly line. Assembly group leaders adjust the number of circulating kanbans for each part within the set range to avoid having team runs out of every parts. Kanban cards are used by PC department to determine appropriate kanban range & to feed information back to parts ordering for even better inventory control. Powerpoint Templates Page 14
  • 15. Q2- Feed necessary parts into TMM operating that are needed and write the no. of cars that could be delivered to sale with JUST IN TIME. Ans.- To feed necessary parts into TMM operating PC relied on the extensive forecasting and planning that TMC performed for worldwide markets. To prepare for May production, for example, PC first received, in January, a Production Planning Order (PPO) for key specifications from the sales company. This PPO was revised in February and, after one more update, was fixed as a Total Vehicle Order (TVO) by the end of March. While total volume was fixed in the late March, the PPO was generally accurate only within "20%" of the TVO for most specification categories at that point. Next, the TVO was broken down weekly: by the end of the second week of April it was done for the first week of May. During the third week of April, the initial May week's information was translated into final part orders for local suppliers as well as a daily production sequence for TMM operations. This procedure left one full week for production preparation. The number of cars would call for 500 base models and 500 luxury models every single day and also demand that a base model and a luxury model be made alternately. Powerpoint Templates Page 15
  • 16. Q3- Need to balance out the total order in daily production sequence Hijunka practice? Ans.- By balancing of the total order in daily production sequence Hijunka practice, the same supplier could stick to a uniform cycle time throughout the month without creating the waste of inventory. Similarly, offsetting cars that required a particular operation against those that did not prevented any particular work station from becoming a severe bottleneck or remaining unreasonably idle. Hijunka also synchronized the assembly line with the ultimate sales of the cars. Powerpoint Templates Page 16
  • 18. CONTRACT BETWEEN TOYOTA AND COMPONENT SUPPLIERS Based on the principle of “long-term stable transaction”, Toyota makes an unique “basic control of component transaction” with a component supplier. On this contract Toyota confirms to promote long lasting prosperity for both parties and an ideal quality assurance for customers. Hoping that, perfect quality control is carried but by every component manufacturer, Toyota includes in the contract the basic rules of quality control, the steps to be followed when defective goods come out and etc. Powerpoint Templates Page 18
  • 19. UPBRINGING OF COMPONENT SUPPLIERS • In order to develop the component suppliers Toyota assists them in improving management as well as quality control. Various means are available for assisting suppliers in improving systems of management such as: • Toyota quality Control Reward • Guidance of Toyota Production system (Kanban System) • Mutual development by supplier’s organization and etc. Powerpoint Templates Page 19
  • 21. COMPILED BY-  AAMUKTA MURTI  DEVENDRAN S.P  GAURAV KHATRI  PUSHPAM SHREE  SIDDHARTH TRIPATHI  TIMSI LUTHRA  VANDANA MADHURI SINGH Powerpoint Templates Page 21