The document is a notice from the Gujarat Energy Transmission Corporation regarding the Unscheduled Interchange (UI) energy account, also known as the Deviation charges, for the week of July 29, 2019 to August 4, 2019. It provides the day-wise deviation energy amounts and corresponding charges calculated according to the GERC order. It notes that deviation charges received from other regions and additional charges are pooled and shared. Wind and solar generators are now subject to forecasting, scheduling, and deviation settlement rules. Payment is due within 10 days.
Gujarat SLDC - STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 to 04-Aug-2019
1. Report Generation Date: 23-10-2019 6:13:18 PM Page 1 of 62
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
----------------------------------------------------------------------------------------------------------------------------
State Load Despatch Centre-Gotri
Email:sldcabtcomm@gmail.com, Tel:- 0265-2322206, Fax 0265-2352019
No: SLDC/Comm./UI/2019-20/JUL/Week-18/REV0/1,134 Date: 23-OCT-2019
By Fax/Post
To:
As per List
(Sr. No. 1 to 67)
Subject: State Deviation Settlement Account (Deviation charges) for the week from 29/07/2019 to 04/08/2019
(Week No. 18, Revision 0)
(Due date for Payment: on or before 02/11/2019)
Sir,
The Unscheduled Interchange (UI) energy account (Deviation charges) for the week from 29/07/2019 to 04/08/2019 is
enclosed herewith along with day wise statement of UI/deviation energy and corresponding charges computed in
accordance with order no.3 of 2006 & amendments issued by GERC with effective from 5th April'2010. As per GERC
order: GERC/Legal/2015/436 dated 05th March'2015, revised UI/Deviation charges and volume of limits as specified by
CERC in DSM regulations 2014 and same is made effective from 17th February'2014 and Deviation charges received from
WRLDC towards power exchange with Gujarat transmission network which includes additional charges is pooled an
shared through pool account.
Further, UI charges reduced due to Additional charges, capping of UI charges and token penalty at the frequency 50.10
Hz and above are also pooled and share through Intra State UI pool account.
As per GERC Notification No.1 of 2019, Wind and Solar Generators are under the ambit of Forecasting,
Scheduling and Deviation Settlement Mechanism. The charge for deviation will be pooled in accordance with the
above Regulation.
In accordance with clause 5 of complimentary commercial mechanism of Amendment order no.3 of 2010 issued by
GERC, Payment of UI(Deviation) charges shall have a high priority and the concerned constituents/pool members shall
pay the indicated amounts within 10 (ten) days of the statement issue into a state UI pool account operated by the SLDC.
In the event of delay in realizing payment, simple interest of 0.04% for each day of delay would be recovered as per
aforesaid order.
Any discrepancy shall be intimated within 15 days (Clause No. 15-C of GERC order No. 3 of 2006) from the date of issue
of this UI/DSM account failing which UI/DSM account published shall be considered as final. Registered discrepancy shall
be addressed based on the merits of the discrepancy.
Details of above UI account are available on website www.sldcguj.com.
Encl: As Above
Yours faithfully
(--Sd--)
(B B Mehta)
Chief Engineer (SLDC)
PROVISIONAL ACCOUNT
2. Report Generation Date: 23-10-2019 6:13:18 PM Page 2 of 62
Mailing List:
1) Managing Director, UGVCL, Mehsana (Fax 02762-223574)
2) Managing Director, DGVCL, Surat (Fax 0261-2572636)
3) Managing Director, MGVCL, Vadodara(Fax 0265-2337279)
4) Managing Director, PGVCL, Rajkot (Fax 0281-2380428)
5) Managing Director, GSECL, Vadodara (Fax 0265-2339066)
6) Executive Director, TPL-Ahemedabad.(Fax 079-25506386)
7) General Manager (Comm.), GUVNL, Vadodara (Fax 0265-2354715)
8) Executive Director, TPL-Surat (Fax 0261-2419963)
9) Chief Manager, KPTL, Kandla (Fax 02836-270184)
10) Executive Director, TEL-SEZ, Dahej (Fax 0261-2413020)
11) Managing Director, GIPCL, Vadodara (Fax 0265-2231207)
12) Managing Director, GIPCL, Mangrol (Fax 02629-261073)
13) General Manager, GPEC, Bharuch (Fax 02642-671521)
14) Managing Director, GMDC, Vastrapura (Fax 079-27911822)
15) Executive Director, TPL-Sugen (Fax 02621-661654)
16) Managing Director, GACL, Vadodara (Fax 0265-2336244)
17) Managing Director, GACL, Dahej (Fax 02641-256220)
18) Managing Director, ONGC, Ankleshwar (Fax 02646-246939)
19) Managing Director, ONGC, Hazira (Fax 0261-2875577)
20) General Manager, PCBL, Palej (Fax No. 02642-277160)
21) Managing Director,SAL Steel,Bharpara (Fax 02836-282198)
22) General Manager, UPL, Jhagadiya (Fax 02645-226017)
23) General Manager, BPL, Hazira (Fax 0261-6682070)
24) General Manager, RIL, Naroda ( Fax No. 079-66068577)
25) General Manager(E&I),JSW,Samaghogha(Fax 02838-240700)
26) Deputy General Manager, UTCL, Kovaya(Fax 02794-283088)
27) Vice President, Gallant Metal, Gandhidham(Fax 02836-235787)
28) Director, Welspun, Anjar (Fax No. 02836-279070/662324)
29) Vice President ,Hindalco, Bharuch (Fax No. 02641-251002)
30) General Manager,VIL,Gandhidham (Fax No.02836-299975)
31) Vice President (Proj),GFL, Noida (Fax No.0120-3063610)
32) Vice President, PCBL, Mokha, Mundra (Fax No.02838-283636)
33) Sr.Vice President, MIPSL,Gandhidham (Fax 02836-286527)
34) Vice President, RIL, Dahej (Fax No. 02641-283108)
35) The Secretary ,GERC, Ahmedabad (Fax 079-26584542)
36) General Manager,(F&A), GSEG(H), Hazira (Fax 079-23238648)
37) Executive V. P(Works), J K Paper Ltd, Fort Songadh (Fax: 02624-220138)
38) Vice President, Solaries Chem. Ltd,Khavda (Fax: 02803-288388)
39) Adani Power Ltd, Mundra, Kutch (Fax No. 079-25557176)
40) MPSEZ Utilities Pvt. Ltd., Mundra, Kutch (Fax No. 079-25557176)
41) M/s Amreli Biomass Power project Ltd, Savarkundla.
42) M/s Junagadh Biomass Power Project Ltd.
43) M/s Saurastra Cement Ltd, Ranavav.
44) M/s Rama News & Print Ltd, Sachin (Talangpore).
45) M/s Essar Power Gujarat Ltd, Vadinar, Jamnagar.
46) M/s Bhavnagar Biomass Power Project Ltd., Sanosara, Bhavnagar.
47) M/s Shree Renuka Sugar Ltd., Bharapar, Kutch.
48) M/s Essar Oil Ltd, Jamnagar
49) M/s Nirma Ltd, Kalatalav
50) Executive Director, TPL-UNOSUGEN, Kamrej
51) M/s Siddhi Vinayak Ltd, Surat
52) M/s Welspun CGPL, Varsamedi, Anjar, Kutch
53) M/s Abellon Clean Energy Ltd, Ahmedabad. Fax No: 079-66309334
54) M/s Jaydeep Cotton Fibres Pvt. Ltd., Rajkot Fax No: 0281-2580090
55) M/s Sanghi Industries Ltd., Sanghipurm, Kutch- 370511
56) M/s OPGS Power Ltd, Mundra, Kutch
57) GSECL (SOLAR)-Charanka, GSECL, Vadodara,
3. Report Generation Date: 23-10-2019 6:13:18 PM Page 3 of 62
58) GPCL (SOLAR)-Charanka, GPCL, Gandhinagar
59) BACKBONE SOLAR (10MW), SHIVLAKHA, KUTCH
60) ENERSON SOLAR (10MW), SHIVLAKHA, KUTCH
61) M/S Unilink Engineering Corporation Pvt. Ltd, Ahmedabad
62) M/S Manikaran Analytics Limited,Kolkata - 700707,West Bengal
63) M/S REConnect Energy Solution Pvt. Ltd.Indore,Madhya Pradesh - 452010
64) M/S Kreate Technologies LLP,New Delhi - 110001
65) M/S Statkraft Markets Private Limited,New Delhi - 110017
66) GIFT POWER COMPANY LTD, GIFT CITY, Gandhinagar
4. Report Generation Date: 23-10-2019 6:13:18 PM Page 4 of 62
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
----------------------------------------------------------------------------------------------------------------------------
State Load Despatch Centre-Gotri
Email:sldcabtcomm@gmail.com, Tel:- 0265-2322206, Fax 0265-2352019
No: SLDC/Comm./UI/2019-20/JUL/Week-18/REV0/1,134 Date: 23.10.2019
General Notes on UI (Deviation) Account for the Week
From 29/07/2019 to 04/08/2019
1. In accordance with Hon'ble CERC (Derivation Settlement Mechanism and Related matters) (Fourth
Amendment) Regulations with effect from 01.01.2019. DSM Price vector as per CERC DSM regulation
Fourth Amendment:
Average Frequency of the time block (Hz)
Charges for Deviation
(Paise/kWh)
Below Not Below
50.05 0.00
50.05 50.04 1xP/5
50.04 50.03 2xP/5
50.03 50.02 3xP/5
50.02 50.01 4xP/5
50.01 50.00 P
50.00 49.99 50.00+15xP/16
49.99 49.98 100.00+14xP/16
49.98 49.97 150.00+13xP/16
49.97 49.96 200.00+12xP/16
49.96 49.95 250.00+11xP/16
49.95 49.94 300.00+10xP/16
49.94 49.93 350.00+9xP/16
49.93 49.92 400.00+8xP/16
49.92 49.91 450.00+7xP/16
49.91 49.90 500.00+6xP/16
49.90 49.89 550.00+5xP/16
49.89 49.88 600.00+4xP/16
49.88 49.87 650.00+3xP/16
49.87 49.86 700.00+2xP/16
49.86 49.85 750.00+1xP/16
49.85 800.00
5. Report Generation Date: 23-10-2019 6:13:18 PM Page 5 of 62
Average Frequency Of the
Time Block(Hz)
Charges For Deviation (Paise/KWH) for the Week 29/07/2019 to 04/08/2019
Below Not Below DAY1 DAY2 DAY3 DAY4 DAY5 DAY6 DAY7
50.05 0 0 0 0 0 0 0
50.05 50.04 53.32 62.68 66.06 62.16 60.19 65.09 64.99
50.04 50.03 106.64 125.36 132.12 124.32 120.37 130.18 129.98
50.03 50.02 159.95 188.05 198.19 186.48 180.56 195.28 194.98
50.02 50.01 213.27 250.73 264.25 248.64 240.74 260.37 259.97
50.01 50 266.59 313.41 330.31 310.8 300.93 325.46 324.96
50 49.99 299.93 343.82 359.67 341.38 332.12 355.12 354.65
49.99 49.98 333.27 374.23 389.02 371.95 363.31 384.78 384.34
49.98 49.97 366.6 404.65 418.38 402.53 394.51 414.44 414.03
49.97 49.96 399.94 435.06 447.73 433.1 425.7 444.1 443.72
49.96 49.95 433.28 465.47 477.09 463.68 456.89 473.75 473.41
49.95 49.94 466.62 495.88 506.44 494.25 488.08 503.41 503.1
49.94 49.93 499.96 526.29 535.8 524.83 519.27 533.07 532.79
49.93 49.92 533.29 556.71 565.16 555.4 550.47 562.73 562.48
49.92 49.91 566.63 587.12 594.51 585.98 581.66 592.39 592.17
49.91 49.9 599.97 617.53 623.87 616.55 612.85 622.05 621.86
49.9 49.89 633.31 647.94 653.22 647.13 644.04 651.71 651.55
49.89 49.88 666.65 678.35 682.58 677.7 675.23 681.37 681.24
49.88 49.87 699.99 708.76 711.93 708.28 706.42 711.02 710.93
49.87 49.86 733.32 739.18 741.29 738.85 737.62 740.68 740.62
49.86 49.85 766.66 769.59 770.64 769.43 768.81 770.34 770.31
49.85 800 800 800 800 800 800 800
Provided that,
1. The charges for the Deviation for the under drawals by the buyer in a time block in excess of 12% of the
schedule or 150 MW, whichever is less, shall be zero.
2. The charges for Deviation for the over-injection by the seller in a time block in excess of 12% of the schedule
or 150 MW, whichever is less, shall be zero, except in case of injection of infirm power.
6. Report Generation Date: 23-10-2019 6:13:18 PM Page 6 of 62
2. In accordance with GERC Notification of 1 of 2019, Deviation Charges for Shortfall of excess Generation
for Wind/Solar Generators or QCA appointed on its behalf, as the case may be, to the state DSM Pool.
TABLE -I (Wind Generators)
Sr.
No.
Absolute Error in the 15-
minute time block
Deviation Charges payable to State DSM Pool
1 <=12% None
2 > 12% but <=20% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 12% and up to 20%
3 >20% but <=28% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 12% and up to 20% + 0.50 per unit for balance energy beyond 20%
and up to 28%
4 >28% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 12% and up to 20% + 0.50 per unit for balance energy beyond 20%
and up to 28%+0.75 per unit for balance energy beyond 28%
TABLE -II (Solar Generators selling power with in Gujarat)
Sr.
No.
Absolute Error in the 15-
minute time block
Deviation Charges payable to State DSM Pool
1 <=7% None
2 > 7% but <=15% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 7% and up to 15%
3 >15% but <=23% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 15% and up to 20% + 0.50 per unit for balance energy beyond 15%
and up to 23%
4 >23% At Rs 0.25 per unit for the shortfall or excess energy for absolute error
beyond 7% and up to 20% + 0.50 per unit for balance energy beyond 15%
and up to 23%+0.75 per unit for balance energy beyond 23%
TABLE -III (Deviation Charges in case of under injection by Wind & Solar Generators selling power
outside Gujarat)
Sr.
No.
Absolute Error in the 15-
minute time block
Deviation Charges payable to State DSM Pool
1 <=15% At the Fixed Rate for the shortfall energy for absolute error up to 15%
2 > 15% but <=25% At the Fixed Rate for the shortfall energy for absolute error up to 15% +
110% of the Fixed Rate for balance energy beyond 15% and up to 25%
3 >25% but <=35% At the Fixed Rate for the shortfall energy for absolute error up to 15% +
110% of the Fixed Rate for balance energy beyond 15% and up to
25%+120% of the Fixed Rate for balance energy beyond 25% and up to
35%
4 >35% At the Fixed Rate for the shortfall energy for absolute error up to 15% +
110% of the Fixed Rate for balance energy beyond 15% and up to
25%+120% of the Fixed Rate for balance energy beyond 25% and up to
35%+130% of the Fixed Rate for balance Energy beyond 35%
*Fixed Rate Considered as PPA rate
7. Report Generation Date: 23-10-2019 6:13:18 PM Page 7 of 62
TABLE -IV (Deviation Charges in case of over injection by Wind & Solar Generators selling power outside
Gujarat)
Sr.
No.
Absolute Error in the 15-
minute time block
Deviation Charges payable to RE Generators From DSM Pool
1 <=15%
Considered as Inadvertent Energy
2 > 15% but <=25%
3 >25% but <=35%
4 >35%
3. Limits of Deviation volume and consequences of crossing limits:
• In addition to the charges for Deviation as stipulated under Regulation 5 of Principal DSM
regulations, Additional Charge for Deviation shall be applicable for over-Drawal as well as under-
injection of electricity for each time block in excess of the volume limit specified. When average
grid frequency of the time block is "49.85 Hz and above" at the rates specified in the Table-I(A)
below in line with CERC DSM 4th Amendment Regulation 2018 dated 20th November 2018.
TABLE -I (A)
When 12% of Schedule is less than or equal to 150 MW
(i) For over drawal of electricity by any buyer
in excess of 12% and up to 15% of the
schedule in a time block.
Equivalent to 20% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(ii) For over drawal of electricity by any buyer
in excess of 15% and up to 20% of the
schedule in a time block.
Equivalent to 40% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(iii) For over drawal of electricity by any buyer
in excess of 20% of the schedule in a time
block.
Equivalent to 100% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(iv) For under injection of electricity by any
seller in excess of 12% and up to 15% of
the schedule in a time block.
Equivalent to 20% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(v) For under injection of electricity by any
seller in excess of 15% and up to 20% of
the schedule in a time block.
Equivalent to 40% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(vi) For under injection of electricity by any
seller in excess of 20% of the schedule in a
time block.
Equivalent to 100% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
8. Report Generation Date: 23-10-2019 6:13:18 PM Page 8 of 62
When 12% of Schedule is more than 150 MW
(i) For over drawal of electricity by any buyer
is above 150 MW and up to 200 MW in a
time block.
Equivalent to 20% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(ii) For over drawal of electricity by any buyer
is above 200 MW and up to 250 MW in a
time block.
Equivalent to 40% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(iii) For over drawal of electricity by any buyer
is above 250 MW in a time block.
Equivalent to 100% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(iv) For under injection of electricity by any
seller is above 150 MW and up to 200 MW
in a time block.
Equivalent to 20% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(v) For under injection of electricity by any
seller is above 200 MW and up to 250 MW
in a time block.
Equivalent to 40% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
(vi) For under injection of electricity by any
seller is above 250 MW in a time block.
Equivalent to 100% of the Charge for Deviation
corresponding to average grid frequency of the time
block.
• As per the CERC CORRIGENDUM dated 17th Februar'2014, in the notification No. L-1/132/2013-
CERC, dated the 6th January, 2014 after Table-I(A) added the following "Provided further that
when the schedule is less than 150 MW, the additional charges for deviation shall be based on
percentage of deviation worked out with reference to schedule of 150 MW as per TABLE-I (A)"
• In addition to the charges for Deviation as stipulated, Additional Charge for Deviation shall be
applicable for over-injection/under Drawal of electricity for each time block by a seller/buyer as
the case may be when grid frequency is "50.10 Hz and above" at the rates equivalent to the
charges of deviation corresponding to the grid frequency of "below 50.01 Hz but not below 50.0
Hz", or Cap rate for deviation of 303.04 Paise/kWh whichever is lower" as per CERC DSM
regulation amendment No.5.
• In addition to the Charges for Deviation as stipulated, Additional Charge for Deviation shall be
applicable for over-Drawal or under-injection of electricity when grid frequency is "below 49.85
Hz" and the same shall be equivalent to 100% of the Charge for Deviation of 800.00 Paise/kWH
corresponding to the grid frequency of "below 49.85 Hz".
9. Report Generation Date: 23-10-2019 6:13:18 PM Page 9 of 62
4. Transmission Losses considered for State Transmission network during 29/07/2019 to 04/08/2019 as
under:
Loss Type Period Loss (%)
Estimated Pool Losses 29/JUL/2019 - 04/AUG/2019 1.22
Estimated Transmission Losses 29/JUL/2019 - 31/JUL/2019 4.23
Estimated Transmission Losses 01/AUG/2019 - 04/AUG/2019 4.31
Estimated Pool Losses is applicable at Notional periphery of distribution licensee.
5. UI Suspension for the week due to Transmission Constraints:
Date Block No Station/Constituent Reason
(No reports received from STU (GETCO) and TPGL)
6. UI Suspension for the week due to Grid Disturbance:
From Period To Period Station/Constituent Reason
(No reports received from STU (GETCO) and TPGL)
7. UI Reduction in respect of State Generating Stations due to violation of ceiling construed as a Gaming:
Name of SGS For Date Block No Reduction in UI
SLDC has yet not declared gaming for any state generating plant. If gaming is observed for any state
generating plant by SLDC, account will be revised accordingly
8. Allocation of Wind Farm Energy Received for the Week from 29/07/2019 to 04/08/2019
8.1 Wind Farm Allocation for WEG owned by GUVNL :
Sr No Distribution Licensee Allocation (%)
1 DGVCL 22
2 MGVCL 12
3 PGVCL 39
4 UGVCL 27
TOTAL 100.00
7.2 Total Wind Farm Allocation for WEG for the week including other beneficiary incorporated in UI Accounting:
Sr No Start Date Stop Date Distribution
Licensee
Allocation (%)
1 01-AUG-19 04-AUG-19 DGVCL 23.216504
2 01-AUG-19 04-AUG-19 KPT 0.121792
3 01-AUG-19 04-AUG-19 MGVCL 12.866532
4 01-AUG-19 04-AUG-19 MUPL 0.475767
5 01-AUG-19 04-AUG-19 PGVCL 31.920442
6 01-AUG-19 04-AUG-19 TAECO 6.385740
7 01-AUG-19 04-AUG-19 TEL 0.212975
8 01-AUG-19 04-AUG-19 TSECO 2.432952
9 01-AUG-19 04-AUG-19 UGVCL 22.367294
TOTAL 100.00
10. Report Generation Date: 23-10-2019 6:13:18 PM Page 10 of 62
Sr No Start Date Stop Date Distribution
Licensee
Allocation (%)
1 29-JUL-19 31-JUL-19 DGVCL 22.834403
2 29-JUL-19 31-JUL-19 KPT 0.126436
3 29-JUL-19 31-JUL-19 MGVCL 13.362293
4 29-JUL-19 31-JUL-19 MUPL 0.351458
5 29-JUL-19 31-JUL-19 PGVCL 31.926299
6 29-JUL-19 31-JUL-19 TAECO 6.041860
7 29-JUL-19 31-JUL-19 TEL 0.160299
8 29-JUL-19 31-JUL-19 TSECO 2.664655
9 29-JUL-19 31-JUL-19 UGVCL 22.532296
TOTAL 100.00
7.3 NO PPA energy 2431.163249 MWH is allocated to GUVNL subsidiary entities as per percentage allocation
mentioned herein at section 7.1
8 Loss Adjustment :
In case of not receipt of data or data discrepancy, the other end meter is considered for energy accounting by
adjustment of losses. The losses are considered as 4% for the 220 KV & below voltage level and 2% for the 400
KV voltage level.
9 Master Frequency :
Master Frequency data is considered in line with WRLDC for considering UI (Deviation) charges. Master
Frequency meter is considered as Korba-Mahan location.
10 Network Changes:
(i) Network Addition Details:
1. 11 KV Swara Energy solar line no.1 at Chanchapar added to the network on 01-08-2019 00:00:00.
2. 11 KV Panoli Intermediates solar line No.1 at Bhadrada added to the network on 01-08-2019 00:00:00.
3. 11 KV GOODWATTS Modasa solar line No.1 at Medhasan added to the network on 01-08-2019 00:00:00.
4. 11 KV Mahadev Manufacturers solar line No.1 at RAMOD added to the network on 01-08-2019 00:00:00.
5. 11 KV GOODWATTS 2 MW Modasa solar line No.1 at Medhasan added to the network on 01-08-2019
00:00:00.
6. 11 KV Electrical Control and System Solar Line - 1 at Pisai added to the network on 01-08-2019 00:00:00.
7. 11 KV Angel Solar Line - 1 at Vakhatpar added to the network on 01-08-2019 00:00:00.
8. 11 KV Shah Foild Ltd Solar Line - 1 at Khadol added to the network on 01-08-2019 00:00:00.
9. 11 KV Aditya Energy solar line No.1 at BALWA added to the network on 01-08-2019 00:00:00.
10. 11 KV UNIVERSAL Solar Line - 1 at Charanka added to the network on 01-08-2019 00:00:00.
11. 11 KV HI TECH solar line no.1 at LAKHANKA added to the network on 01-08-2019 00:00:00.
12. 11 KV Herald Infratech solar line no.1 at TIMDI added to the network on 01-08-2019 00:00:00.
11. Report Generation Date: 23-10-2019 6:13:18 PM Page 11 of 62
(ii) Network Removal Details: NIL
11 (i) Meter Change:
Entity Service Point
Name
Location ID Meter ID Start Time Stop Time
ADITYA_ENERGY_S
OLAR
11 KV Aditya Energy
solar line No.1 at
BALWA
5-L-BLW-M1 GJ-4408-B 01-08-2019 00:00:00
ANGEL_SOLAR 11 KV Angel Solar
Line - 1 at Vakhatpar
5-L-VKT-M1 GJ-4393-B 01-08-2019 00:00:00
ELECTRICAL_CONT
ROL_&_SYSTEM_S
OLAR
11 KV Electrical
Control and System
Solar Line - 1 at Pisai
5-L-PSI-M1 GJ-4416-B 01-08-2019 00:00:00
GOODWATTS
SOLAR MODASA
PVT. LTD
11 KV GOODWATTS
Modasa solar line
No.1 at Medhasan
5-L-MED-GWT-M1 GJ-4367-B 01-08-2019 00:00:00
GOODWATTS
SOLAR MODASA
2MW PVT. LTD
11 KV GOODWATTS
2 MW Modasa solar
line No.1 at
Medhasan
5-L-MED-M1 GJ-4368-B 01-08-2019 00:00:00
HERALD_INFRATEC
H_SOLAR
11 KV Herald
Infratech solar line
no.1 at TIMDI
5-L-TMD-M1 GJ-4391-B 01-08-2019 00:00:00
HI_TECH_SOLAR 11 KV HI TECH solar
line no.1 at
LAKHANKA
5-L-LKN-M1 GJ-4397-B 01-08-2019 00:00:00
MAHADEV_MANUFA
CTURERS_SOLAR
11 KV Mahadev
Manufacturers solar
line No.1 at RAMOD
5-L-RMD-M1 GJ-4411-B 01-08-2019 00:00:00
PANOLI_INTERMEDI
ATES_(INDIA)_PVT_
LTD_SOLAR
11 KV Panoli
Intermediates solar
line No.1 at Bhadrada
5-L-BDR-M1 GJ-4290-B 01-08-2019 00:00:00
SHAH_FOILS_LTD_S
OLAR
11 KV Shah Foild Ltd
Solar Line - 1 at
Khadol
5-L-KDL-M1 GJ-4400-B 01-08-2019 00:00:00
SWARA_ENERGY_S
OLAR
11 KV Swara Energy
solar line no.1 at
Chanchapar
5-L-CNC-M1 GJ-4398-B 01-08-2019 00:00:00
UNIVERSAL SOLAR
SYSTEM
11 KV UNIVERSAL
Solar Line - 1 at
Charanka
5-L-CHK-M1 GJ-4366-B 01-08-2019 00:00:00
(ii) CT ratio changed for following meters during this period:
Entity Service Point
Name
Location ID Meter ID Old CTR New CTR CTR Change
Time
12. Report Generation Date: 23-10-2019 6:13:18 PM Page 12 of 62
STATE LOAD DISPATCH CENTRE
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
WEEKLY STATE DEVIATION SETTLEMENT ACCOUNT FOR
INTRA STATE ABT
Period From 29/07/2019 To 04/08/2019
Week 18
Revision 0
CONTENTS
SUMMARY
DETAIL STATEMENT
14. Report Generation Date: 23-10-2019 6:13:19 PM Page 14 of 62
SR NO MEMBER BASIC UI CAP UI ADDITIONAL UI
SIGN VIOLATION
ADDITIONAL
CHARGE
NET UI
PAYABLE RECEIVABLE
TOTAL 115246470 (115246470)
LEGENDS :
(+VE) PAYABLE
BRACKET (-VE ) RECEIVABLE
15. State Load Despatch Centre-Gotri
Vadodara-390 021, Website : www.sldcguj.com, Email: sldcabtcomm@gmail.com, Fax No:0265-2352019
No: SLDC/Comm./UI/2019-20/JUL/Week-18/REV0/1,134 23-OCT-19
STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 to 04-Aug-2019
Report Generation Date: 23-10-2019 6:13:19 PM Page 15 of 62
SUMMARY OF STATE POOL ACCOUNT FOR THE WEEK 29-Jul-2019 to 04-Aug-2019
Total Deviation Charges Payable to State DSM pool Amount (in Rs.)
Total deviation charges for wind generating stations payable to State DSM pool 12400293
Total deviation charges for Solar generating stations payable to State DSM pool 4225075
Total RE Deviation Charges of Wind and Solar Generating stations payable to state DSM pool 16625368
16. State Load Despatch Centre-Gotri
Vadodara-390 021, Website : www.sldcguj.com, Email: sldcabtcomm@gmail.com, Fax No:0265-2352019
No: SLDC/Comm./UI/2019-20/JUL/Week-18/REV0/1,134 23-OCT-19
STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 to 04-Aug-2019
Report Generation Date: 23-10-2019 6:13:19 PM Page 16 of 62
DEVIATION CHARGES FOR WIND GENERATING STATIONS PAYABLE TO STATE DSM POOL FROM 29-Jul-2019 to 04-Aug-2019
SR NO MEMBER NAME OF QCA INSTALLED CAPACITY (MW) AMOUNT (in Rs)
W1
ADANI_RENEWABLE_ENERGY_K
A_LTD
ADANI_REKAL_WF 12 3523
W2 ADODAR M/S Unilink Engineering Corporation Pvt. Ltd. 38 17281
W3 AMRAPUR M/S REConnect Energy Solution Pvt. Ltd. 200 215242
W4 BALAMBHA M/S REConnect Energy Solution Pvt. Ltd. 33 139011
W5 BANUGAR_SUZLON_WF M/S Manikaran Analytics Limited. 37.8 104435
W6 BARADIYA M/S Unilink Engineering Corporation Pvt. Ltd. 21.25 101369
W7 BARADIYA_KPE M/S Unilink Engineering Corporation Pvt. Ltd. 33.6 85629
W8 BETA VALADIA BITA VALADIA_WF 48 104823
W9 BHATEL_POWERICA_WF M/S Manikaran Analytics Limited. 50.6 52737
W10 BHOGAT (SUZLON) 66 KV M/S Manikaran Analytics Limited. 23.8 11966
W11 BHOJAPURI_SUZLON M/S Unilink Engineering Corporation Pvt. Ltd. 50.4 19995
W12 CHANDRODI VEER M/S Manikaran Analytics Limited. 58.325 86992
W13 CHANGDAI M/S REConnect Energy Solution Pvt. Ltd. 25 277655
W14 CHARANKA(W/F) M/S Manikaran Analytics Limited. 4.2 40586
W15 CHHAPRI_INOX M/S Manikaran Analytics Limited. 24 93183
W16 DEGAM WF (KP ENERGY) M/S Unilink Engineering Corporation Pvt. Ltd. 69.3 102053
W17 DHANK M/S REConnect Energy Solution Pvt. Ltd. 20.14 22006
W18 ENERCON M/S Manikaran Analytics Limited. 180.26 47567
W19 GALA M/S REConnect Energy Solution Pvt. Ltd. 26 127720
W20 GANDHVI M/S Manikaran Analytics Limited. 22.1 78044
W21 GOLIDA (GFL) M/S REConnect Energy Solution Pvt. Ltd. 96 506596
W22 GORSAR M/S REConnect Energy Solution Pvt. Ltd. 25.5 16203
W23 HALENDA M/S Unilink Engineering Corporation Pvt. Ltd. 39.9 38315
W24 HOTHIJI_KHADABA_WF M/S Unilink Engineering Corporation Pvt. Ltd. 34.1 54613
W25 JAMANWADA M/S Unilink Engineering Corporation Pvt. Ltd. 304.5 107017
W26 JANGI M/S REConnect Energy Solution Pvt. Ltd. 106.5 67931
W27 KANDORANA_SUZLON M/S REConnect Energy Solution Pvt. Ltd. 44.1 95573
W28 KESHIYA_GALA_WF M/S Manikaran Analytics Limited. 35.7 784353
W29 KHIRI_SUZLON M/S REConnect Energy Solution Pvt. Ltd. 63 123139
W30 KUBLAVADAR_POWERICA M/S Manikaran Analytics Limited. 70 122317
W31 KUCHHDI M/S Manikaran Analytics Limited. 30 35922
W32 KUNDHDA M/S Manikaran Analytics Limited. 27.3 198316
W33 LAMBA M/S Manikaran Analytics Limited. 22.5 20642
W34 LAYJA M/S Manikaran Analytics Limited. 37.5 35749
W35 MALIYA_GAMESA M/S Statkraft Markets Private Limited. 40 224568
W36 MENAVADAR M/S REConnect Energy Solution Pvt. Ltd. 9.915 404474
W37 MOTA GUNDA(GAMESHA) M/S Manikaran Analytics Limited. 38.175 96385
W38 MOTA GUNDA(SUZLON) M/S REConnect Energy Solution Pvt. Ltd. 119.7 148163
W39 NAVADARA M/S REConnect Energy Solution Pvt. Ltd. 21.56 296981
W40 PARABADI_WINDWORLD_WF M/S Manikaran Analytics Limited. 69.3 115853
W41 PAREVADA M/S Manikaran Analytics Limited. 25.2 41354
W42 PATLEKA M/S REConnect Energy Solution Pvt. Ltd. 17.375 17844
W43 PIONEER WINDFARM M/S REConnect Energy Solution Pvt. Ltd. 30.75 19045
W44 PIONNER WINCOM M/S REConnect Energy Solution Pvt. Ltd. 24.5 37690
W45 RAIPAR_SAITEC M/S Manikaran Analytics Limited. 22 70896
W46 RAJPARA_SARDHAR M/S Unilink Engineering Corporation Pvt. Ltd. 65.1 70594
W47 RASALIYA M/S REConnect Energy Solution Pvt. Ltd. 66.4 32666
W48 RATABHER M/S REConnect Energy Solution Pvt. Ltd. 26 113649
W49 REGEN POWERTECH_WF M/S Manikaran Analytics Limited. 42 57528
W50 RRB M/S Manikaran Analytics Limited. 75 13376
W51 SADLA_MARUTI_WF M/S Manikaran Analytics Limited. 146 1775472
W52 SADODAR M/S REConnect Energy Solution Pvt. Ltd. 462.4 466242
W53 SANODAR M/S Manikaran Analytics Limited. 8.75 32130
W54 SEPC M/S Unilink Engineering Corporation Pvt. Ltd. 25.25 88466
W55 SHERDIVADAR M/S Unilink Engineering Corporation Pvt. Ltd. 33.6 34981
W56 SHIKARPUR M/S Manikaran Analytics Limited. 55.5 35269
W57 SHIKARPUR 132KV M/S REConnect Energy Solution Pvt. Ltd. 90.05 74627
W58 SHREE JAY AMBE WF M/S REConnect Energy Solution Pvt. Ltd. 34 16805
W59 SINDHODI M/S Unilink Engineering Corporation Pvt. Ltd. 312.8 474455
W60 SPRNG _ALT_PATAN_WF M/S Manikaran Analytics Limited. 160 68419
W61 SUKHPUR_INOX M/S REConnect Energy Solution Pvt. Ltd. 458 511897
W62 SUTHARI M/S Manikaran Analytics Limited. 288.8 63360
W63 TARANA_GALA_WF M/S REConnect Energy Solution Pvt. Ltd. 16.8 179157
W64 TEBHDA M/S Manikaran Analytics Limited. 367.5 491227
W65 THEOLIA M/S Manikaran Analytics Limited. 100 118551
W66 THEOLIA (NANI KUNDAL) M/S REConnect Energy Solution Pvt. Ltd. 26 129337
W67 TITHAWA M/S Manikaran Analytics Limited. 30.3 159030
W68 TITHWA_BETAM_WF M/S Manikaran Analytics Limited. 4.6 124061
W69 UKHARALA M/S Unilink Engineering Corporation Pvt. Ltd. 13.2 63450
W70 UKHEDA M/S Manikaran Analytics Limited. 210 275770
W71 VADALI M/S REConnect Energy Solution Pvt. Ltd. 64.8 50826
W72 VAGHNAGAR_KPE M/S Manikaran Analytics Limited. 55 294611
W73 VANDA_INOX M/S Manikaran Analytics Limited. 34 75880
W74 VANDIYA M/S REConnect Energy Solution Pvt. Ltd. 199.9 297543
W75 VANKU M/S Manikaran Analytics Limited. 50 33341
W76 VARSAMADI M/S REConnect Energy Solution Pvt. Ltd. 119.7 242319
W77 VASAI(SUZLON) M/S REConnect Energy Solution Pvt. Ltd. 30.75 29666
W78 VINJALPUR M/S Manikaran Analytics Limited. 20.7 74476
W79 VIRVAV_WF M/S REConnect Energy Solution Pvt. Ltd. 79.2 419356
17. State Load Despatch Centre-Gotri
Vadodara-390 021, Website : www.sldcguj.com, Email: sldcabtcomm@gmail.com, Fax No:0265-2352019
No: SLDC/Comm./UI/2019-20/JUL/Week-18/REV0/1,134 23-OCT-19
STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 to 04-Aug-2019
Report Generation Date: 23-10-2019 6:13:19 PM Page 17 of 62
DEVIATION CHARGES FOR SOLAR GENERATING STATIONS PAYABLE TO STATE DSM POOL FROM 29-Jul-2019 to 04-Aug-2019
SR NO MEMBER QCA INSTALLED CAPACITY
(MW)
AMOUNT in (Rs)
Solar Generators Selling Power Within Gujarat
S1 AATASH(SOLAR) AATASH(SOLAR) 5 3217
S2 ACME(SOLAR) ACME(SOLAR) 15 10379
S3 ADANI SOLAR M/S Manikaran Analytics Limited. 40.107 27639
S4 ADITYA_ENERGY_SOLAR ADITYA_ENERGY_SOLAR 3.6 1109
S5 AES(SOLAR) M/S Manikaran Analytics Limited. 14.92 8776
S6 AIPL(SOLAR) AIPL(SOLAR) 5 0
S7 ALEX(SOLAR) M/S Manikaran Analytics Limited. 25.07 49486
S8 ANGEL_SOLAR ANGEL_SOLAR 2.611 3418
S9 APCA(SOLAR) M/S Manikaran Analytics Limited. 5.008 3001
S10 ASTONFIELD(SOLAR) ASTONFIELD(SOLAR) 11.508 177
S11 ASTRA_SOLAREN_SOLAR ASTRA_SOLREN_SOLAR 40 76464
S12 ASTRA_SOLREN_25_SOLAR ASTRA_SOLREN_25_SOLAR 25 43948
S13 AVATAR(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 4.986 7809
S14 AZURE(GUJ) M/S Manikaran Analytics Limited. 5 2302
S15 AZURE(H) M/S REConnect Energy Solution Pvt. Ltd. 15.2 14962
S16 AZURE_POWER_THIRTY_TH
REE_SOLAR
M/S REConnect Energy Solution Pvt. Ltd. 30 62808
S17 AZURE_POWER_THIRTY_TH
REE_SOLAR_DHARI
M/S REConnect Energy Solution Pvt. Ltd. 35 96025
S18 AZURE_POWER_THIRTY_TH
REE_SOLAR_MULOJ
M/S REConnect Energy Solution Pvt. Ltd. 40 111851
S19 AZURE_POWER_THIRTY_TH
REE_SOLAR_NETRAMALI
M/S REConnect Energy Solution Pvt. Ltd. 40 49255
S20 AZURE_POWER_THIRTY_TH
REE_SOLAR_SANES
M/S REConnect Energy Solution Pvt. Ltd. 50 129204
S21 AZURE_POWER_THIRTY_TH
REE_SOLAR_VADOL
M/S REConnect Energy Solution Pvt. Ltd. 40 71374
S22 AZURE_POWER_THIRTY_TH
REE_SOLAR_VERTOL
M/S REConnect Energy Solution Pvt. Ltd. 25 22968
S23 BACKBONE SOLAR M/S REConnect Energy Solution Pvt. Ltd. 5 9043
S24 CBC(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 10 19538
S25 CHATTEL(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 22 39694
S26 DREISATZ MY(SOLAR) DREISATZ MY(SOLAR) 15 8851
S27 ELECTRICAL_CONTROL_&_S
YSTEM_SOLAR
ELECTRICAL_CONTROL_&_SYSTEM_SOL
AR
1.5 2678
S28 EMAMI(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 10.06 12145
S29 EMCO (SOLAR) M/S Manikaran Analytics Limited. 5 25681
S30 ESP URJA M/S Manikaran Analytics Limited. 5 3757
S31 EURO(SOLAR) M/S Manikaran Analytics Limited. 5.121 8077
S32 GACL_20MW_SOLAR M/S Manikaran Analytics Limited. 20 356
S33 GACL_SOLAR M/S Manikaran Analytics Limited. 15 15318
S34 GANESHVANI(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 5.04 7460
S35 GANGESH(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 24.976 24400
S36 GENSU_SOLAR M/S REConnect Energy Solution Pvt. Ltd. 70 88461
S37 GHI ENERGY M/S REConnect Energy Solution Pvt. Ltd. 10 18845
S38 GIPCL SOLAR M/S REConnect Energy Solution Pvt. Ltd. 5 16343
S39 GIPCL_40_P1_SOLAR M/S Manikaran Analytics Limited. 40 58252
S40 GIPCL_40_P3_SOLAR M/S Manikaran Analytics Limited. 40 51827
S41 GIPCL_75_PB2&C_SOLAR M/S REConnect Energy Solution Pvt. Ltd. 75 140861
S42 GMDC(SOLAR) GMDC(SOLAR) 5 1094
S43 GMR(SOLAR) M/S Kreate Technologies LLP. 25.029 23394
S44 GOODWATTS SOLAR
MODASA 2MW PVT. LTD
M/S REConnect Energy Solution Pvt. Ltd. 2 2422
S45 GOODWATTS SOLAR
MODASA PVT. LTD
M/S REConnect Energy Solution Pvt. Ltd. 3 3013
S46 GPCL(SOLAR) GPCL_SOLAR 5 6162
S47 GPPC(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 5 3762
S48 GREEN INFRA(S) M/S Manikaran Analytics Limited. 10 14294
S49 GRT JEWELLERS(INDIA) PVT
LTD BAVALI
M/S Kreate Technologies LLP. 30.6 35241
S50 GRT JEWELLERS(INDIA) PVT
LTD DIGSAR
M/S Kreate Technologies LLP. 30 24767
S51 GRT JEWELLERS(INDIA) PVT
LTD HARIJ
M/S Kreate Technologies LLP. 30.6 54511
S52 GSECL_DHUVARAN_75_SOLA
R
GSECL_DHUVARAN_75_SOLAR 75 115238
S53 GSFC_SOLAR M/S Manikaran Analytics Limited. 10 14149
S54 HERALD_INFRATECH_SOLAR M/S Unilink Engineering Corporation Pvt. Ltd. 2.265 5829
S55 HIRACO(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 20.11 74521
S56 HI_TECH_SOLAR M/S Unilink Engineering Corporation Pvt. Ltd. 3.704 6102
S57 ICML(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 9 8627
S58 IOCL_SOLAR M/S REConnect Energy Solution Pvt. Ltd. 7.5 11332
S59 JAIHIND(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 5 3103
S60 KINDLE_SOLAR M/S REConnect Energy Solution Pvt. Ltd. 50 36812
S61 KONARK SOLAR M/S Manikaran Analytics Limited. 5 3115
S62 KPI_SOLAR M/S Manikaran Analytics Limited. 28.13 55721
S63 LANCO(BHRD) LANCO BHRD_SOLAR 5 27084
S64 LANCO(CH) M/S REConnect Energy Solution Pvt. Ltd. 15.01 13542
S65 LANCOINFRA(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 15.01 36370
S66 LOUROUX( S) M/S Manikaran Analytics Limited. 25 9261
S67 MADHU_SILICA_SOLAR M/S REConnect Energy Solution Pvt. Ltd. 4.5 10876
S68 MAHADEV_MANUFACTURER
S_SOLAR
M/S Unilink Engineering Corporation Pvt. Ltd. 3.44 1713
S69 MI MY SOLAR24(SOLAR) MI MY SOLAR24_SOLAR 14.993 9411
S70 MILENIUM SOLAR M/S Manikaran Analytics Limited. 9.27 7444
S71 MONO STEEL(SOLAR) M/S Manikaran Analytics Limited. 10 6196
S72 MOSER BAER(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 15.07 4827
S73 NKG(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 10 7286
S74 ONGC_A_SOLAR M/S REConnect Energy Solution Pvt. Ltd. 5 17745
S75 ORANGE_SOLAR M/S Statkraft Markets Private Limited. 40 75479
S76 PALACE(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 15 6488
S77 PANOLI_INTERMEDIATES_(IN
DIA)_PVT_LTD_SOLAR
PANOLI_INTERMEDIATES_(INDIA)_PVT_LT
D_SOLAR
3.75 5568
S78 PLG(SOLAR) M/S Manikaran Analytics Limited. 20 16088
S79 PRECIOUS M/S REConnect Energy Solution Pvt. Ltd. 15.199 33059
S80 RALLIS_SOLAR M/S Manikaran Analytics Limited. 4 3388
S81 RENEW_POWER_SOLAR M/S Manikaran Analytics Limited. 40 63254
S82 RESPONSIVE(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 25.064 41195
S83 ROHA(SOLAR) M/S Manikaran Analytics Limited. 25.04 45591
S84 S J GREEN(SOLAR) M/S Manikaran Analytics Limited. 5.121 1539
S85 SAND LAND(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 25.06 43235
18. State Load Despatch Centre-Gotri
Vadodara-390 021, Website : www.sldcguj.com, Email: sldcabtcomm@gmail.com, Fax No:0265-2352019
No: SLDC/Comm./UI/2019-20/JUL/Week-18/REV0/1,134 23-OCT-19
STATE DEVIATION SETTLEMENT ACCOUNT FOR THE WEEK 29-Jul-2019 to 04-Aug-2019
Report Generation Date: 23-10-2019 6:13:19 PM Page 18 of 62
S86 SEI(SOLAR) M/S Manikaran Analytics Limited. 25.01 18739
S87 SHAH_FOILS_LTD_SOLAR SHAH_FOILS_LTD_SOLAR 2.498 13734
S88 SJVL_SOLAR SJVNL_SOLAR 5 0
S89 SOLAR SEMI(S) M/S Manikaran Analytics Limited. 20 9739
S90 SOLARFIELD(SOLAR) M/S Manikaran Analytics Limited. 20.06 21143
S91 SOLITAIRE M/S REConnect Energy Solution Pvt. Ltd. 15.01 33120
S92 SSNL_RAVAL M/S Manikaran Analytics Limited. 25 23283
S93 SSNL_SAMA M/S Manikaran Analytics Limited. 10.2 2550
S94 SUNBORNE(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 15 12493
S95 SUNCLEAN(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 5.99 4304
S96 SUNKON M/S Manikaran Analytics Limited. 10 4168
S97 SURANA(SOLAR) M/S Manikaran Analytics Limited. 5 3599
S98 SWARA_ENERGY_SOLAR M/S Unilink Engineering Corporation Pvt. Ltd. 3.914 6103
S99 TATA SOLAR TATA_SOLAR 25 11956
S100 TATA_CHK_25_SOLAR TATA_POWER_CHARANKA_SOLAR 25 53785
S101 TAXUS(SOLAR) TAXUS_SOLAR 4.935 3493
S102 TORRENT(SOLAR) M/S Manikaran Analytics Limited. 51 55629
S103 UJJAWALA(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 23.06 38207
S104 UNITY POWER(S) UNITY POWER_SOLAR 5 2438
S105 UNIVERSAL SOLAR SYSTEM M/S REConnect Energy Solution Pvt. Ltd. 1.6 3030
S106 VISUAL(SOLAR) M/S Manikaran Analytics Limited. 25 16034
S107 WAA SOLAR M/S Manikaran Analytics Limited. 10.25 3867
S108 WELSPUN(SOLAR) WELSPUN_SOLAR 15.01 10346
S109 YANTRA(SOLAR) M/S Manikaran Analytics Limited. 4.95 4155
S110 ZF STEERING(SOLAR) M/S REConnect Energy Solution Pvt. Ltd. 5 3784
Solar Generators Selling Power Outside Gujarat
S111 BACKBONE_SOLAR_10MW BACKBONE_SOLAR_10MW 10 304131
S112 ENERSON_SOLAR_10MW ENERSON_SOLAR_10MW 10 369303
S113 GPCL_SOLAR_10 GPCL_SOLAR_10 10 282144
S114 GSECL_SOLAR GSECL_SOLAR 10 277234
S115 JCFPL_SOLAR JCFPL_SOLAR 6 294957