Vertical Transportation (Building Services)
CE2007 - Functional Design of Buildings
Vertical Transportation ??
• To provide an accessible path, leading from one level to
another by targeting to meet the needs of all target groups.
Outline
• Stairs
• Elevators
• Escalators
• Ramps
What is a stair and it’s components??
A stair is a series of steps, each elevated a measured distance,
leading from one level of a structure to another.
 Stair parts and terms
• Headroom
• Tread
• Riser
• Unit rise
• Unit run
• Total rise
• Stringer
• Stair well
• Total run
http://atjenese.wordpress.com
Cont’d…
• Platform
• Winding stairs
• Run of stairs or flight
• Straight run
• Winders
http://atjenese.wordpress.com
Cont’d…..
• Handrail
• Wall rail
• Baluster
• Balustrade
• Newel Post
• Nosing
http://atjenese.wordpress.com
Terminologies
1. Headroom: The clear space between the floor line and ceiling.
2. Tread: Horizontal walking surface of a stair
3. Riser: The vertical stair member between two consecutive stair treads.
4. Unit rise: The height of the stair riser; the vertical distance between two treads.
5. Unit run: The width of a stair tread minus the nosing.
6. Total rise: Vertical distance from one floor to another
7. stringer: A stringer to which blocking has been added to form a base for adding treads and risers.
8. Stairwell: The rough opening in the floor above to provide headroom for stairs.
9. Total run: The horizontal distance occupied by the stairs; measured from the foot of the stairs to a point directly
beneath where the stairs rest on a floor or landing above.
1. Platform: A horizontal section between two flights of stairs. Also called a landing.
2. Winding stairs: A curving stairway that gradually changes direction; usually circular or elliptical in shape. Also called
geometrical.
3. Run of stairs: A series of steps that is a continuous section without breaks formed by landings or other constructions.
Also called a flight of stairs.
4. Straight run: A stairway that does not change direction.
5. Winders: Wedge-shaped treads installed where stairs turn.
6. Handrail: A pole installed above and parallel to stair steps to act as a support for persons using the stairs. also called
a stair rail.
7. Baluster: The vertical member (spindle) supporting the handrails on open stairs.
2. Newel: The main post at the start of a stair and the stiffening post at the landing.
3. Nosing: The part of a stair tread that projects beyond the riser
Balustrade: An assembly with a railing resting on a series of balusters that, in turn, rest on a base, usually the treads
• Wall rail: In closed stairs, the support rail that is
Types of Stairs
 STRAIGHT STAIRS:-
• All steps lead in one direction
• This may be continuous with two flights
with an intermediate landing
• Adopted when staircase is narrow and
long
• Provided mostly in porch, entrance etc.
 DOG-LEGGED STAIRS:-
• Consist of two straight flights running in
opposite directions
• There is no space between the flights in
plan
• Landing is provided at level which
direction of flight changes
Types of Stairs
 GEOMETRICAL STAIRS :-
• These stairs may have any geometrical
shape and they require no newel post
• This type of stair is similar to open newel
stair except the well formed between
forward and backward flight is curved
• Change of direction in such stairs is
achieved by winders and not by landings
 CIRCULAR STAIRS:-
• all the steps are radiate from a
newel post or well hole
• all the steps are winders
• this is provided where space is
limited and traffic is casual
• mostly located at rear of building
Types of Stairs
http://atjenese.wordpress.com
 QUARTER TURN NEWEL:-
• A stair turning through 90° with the
help of level landing
• Used in shops and public buildings
 OPEN NEWEL STAIRS:-
• Popularly known as open well
stairs
• A well or opening is left between
forward and backward flight
• The opening is generally used
for installation of lift
• A short flight may or may not
provided in these stairs
Design Consideration
Landing
the width of the landing should not be less than the width of stairs
Width of stairs
Residential:-0.8 to 1 m
Public :- 1.8 to 2 m
Tread
Residential:-220-250 mm
Public:- 250-300mm
Not less than 200mm in any case
 Riser
residential:-150-180 mm
Public:- 120-150mm
Not more than 200mm in any case
Pitch
Should not be more than 38°
Dimensions of a Step
 Comfortable ascent and descent
 Thumb Rules
 (2 x Rise in cm) + (Going (tread) in cm) = 60
 (Rise in cm) + (Going in cm) = 40 to 45
 (Rise in cm) x (Going in cm) = 400 to 450
 Adopt Rise = 14 cm and Going = 30 cm as standard;
then for every 20 mm subtracted from going, add 10 mm to the
rise.
 Residential building = 16 cm x 26 cm
 Public building = 17 cm x 24 cm
Requirements of a Good Stair
Provide easy, quick and safe mode of communication between the floors.
Following are the general requirements which a stair should fulfill.
 Location :
 It should be so located as to provide easy access to the occupants
building.
 It should be so located that it is well lighted and ventilated directly from
the exterior.
 It should be so located as to have approaches convenient and
spacious.
 Width of Stair:
 It should be wide enough to carry the user without much crowd
and in convenience.
Cont’d….
 Depends upto its location in the building and type of the
building.
 In a domestic building, a 90cm wide stair in sufficient while in
public building, 1.5 m to 1.8 m width may be required.
 Length of flight:
 The number of steps are not more than 12 and not less than 3.
 Pitch of stair:
 a comfortable slope is achieved when twice rise plus going is
equal to 60 cm approx. pitch should however, be limited to 30o
degree to 45O
 Head Room:
 Clear space between tread and soffit of the flight immediately
above it should not be less than 2.1 to 2.3 m.
Cont’d..
 Balustrade:
 Open well stair should always be provided with balustrade, to
provide safety to users.
 Step dimensions:
 the rise and tread should be of such dimensions as to provide
comfort to the users. Their proportion should also be such as
to provide pitch of the stair. The going should not be less than
25 cm, though 30 cm going is quite comfortable. The rise
should be between 10 cm to 15 cm. The width of landing should
not be less than width of stair.
 Materials of Construction :
 The materials used for stair construction should be such as to
provide a) Sufficient strength and b) fire resistance
Stairs of Different Materials
 TIMBER
 Light in weight and easy construct, but poor fire resistance
 Used for small rise residential buildings, unsuitable for high rise
residential and public buildings. Hardwood ( oak, mahogany etc.)
 It should be free from fungal decay and insect attack.
 STONE
 Widely used where ashlar stone is readily available.
 Quite strong and rigid, though they are very heavy.
 Stone should be hard, strong and resistance to wear and fire
resistance also.
Stone stairs may have following types of steps:
1. Rectangular steps with rebated joint.
Cont’d..
2. Spandril steps
3. Tread and riser steps
4. Cantilever tread steps
5. Built – up steps
 BRICKS
 Very common except at entrance.
 It contains either solid wall or arched openings may be left for
obtaining storage space.
 Frequent maintenance.
 STEEL
 Mild steel or cast iron steel are used only as emergency stairs.
 Not common, though they are strong and fire resistant.
Cont’d..
 R.C.C
 R.C.C stairs are the one which widely used for residential, public
and industrial buildings.
 Strong, hard wearing and fire resisting.
 Usually cast in situ, and a variety of finishes can be made on
these.
R.C.C stairs may be divided into two categories
1. Stair with slab spanning horizontally.
2. Stair with slab spanning longitudinally.
Design of a staircase.
 Plan a dog legged stair for a building in which the vertical
distance between the floor is 3.6 m. the stair hall measures 2.5 m
x 5m.
 Shows the plan of a stair hall of a public building, which
measures 4.25 m x 5.25 m. the vertical distance between the floor
is 3.9 m.
Outline
• Stairs
• Elevators
• Escalators
• Ramps
Elevator
Elevator has been used in buildings having more than 4 stories.
 Lift — An appliance designed to transport persons or
materials between two or more levels in a vertical or
substantially vertical direction by means of a guided car or
platform. The word ‘elevator’ is also synonymously used for
‘lift’.
 Lift Car — The load carrying unit with its floor or platform,
car frame and enclosing bodywork.
 Lift Landing — That’ portion of a building or structure used
for discharge of passengers or goods or both into or from a lift
car.
 Lift Machine — The part of the lift equipment comprising the
motor and the control gear therewith, reduction gear (if any),
brake(s) and winding drum or sheave, by which the lift car is
raised or lowered.
Elevator
 Lift Pit — The space in the lift well below the level of the
lowest lift landing served.
 Lift Well — The unobstructed space within an enclosure
provided for the vertical movement of the lift car(s) and any
counterweight(s), including the lift pit and the space for top
clearance.
 Lift Well Enclosure — Any structure which separates the lift
well from its surroundings.
 Passenger Lift — A lift designed for the transport of
passengers.
 Position and/or Direction Indicator — A device which
indicates on the lift landing or in the lift car or both, the
position of car in the lift well or the direction or both in which
the lift car is traveling.
Elevator
 Rated Load (Lift) — The maximum load for which the lift
car is designed and installed to carry safely at its rated
speed.
 Rated Speed (Lift) — The mean of the maximum speed
attained by the lift car in the upward and downward
direction with rated load in the lift car.
Elevator
Overview of Types of ElevatorsOverview of Types of Elevators
Generally Two CategoriesGenerally Two Categories
 Traction (Electric)
 Virtually limitless rise (high & mid rise)
 High speeds, but high installation cost
 Hydraulic
 Limited to heights of about 60 ft. (6 stories)
 Lower speeds
 Lower initial cost – higher power consumption
The systems are distinguished primarily by their hoisting mechanisms.
Overview of Types of Elevators
Generally Two CategoriesGenerally Two Categories
• Traction (Electric)
 Geared Traction
Drive shaft is connected to the sheave
by gears in a gear box. Geared traction
systems are designed to operate in the
range of 100 to 500 fpm, which restricts
their use to mid rise buildings.
Overview of Types of ElevatorsOverview of Types of Elevators
Generally Two CategoriesGenerally Two Categories
• Traction (Electric)
 Geared Traction
 Gearless Traction
Gearless traction systems are designed
to operate in the range of 350 to 1200
fpm and typically installed in high-rise
buildings. Greater speeds are also
available.
Overview of Types of ElevatorsOverview of Types of Elevators
Generally Two CategoriesGenerally Two Categories
• Hydraulic
 Holed Hydraulic
In-ground cylinder extends to a depth
equal to the rise of the elevator cab.
Current codes require double-bottom
cylinders with leak detection and
containment.
Overview of Types of Elevators
Generally Two CategoriesGenerally Two Categories
• Hydraulic
 Holed Hydraulic
 Holeless Hydraulic
Holeless hydraulic elevators use a
telescoping hydraulic piston as the
driving machine, eliminating the need
for an in-ground cylinder. Currently
limited to a height of about 3 stories.
Overview of Types of ElevatorsOverview of Types of Elevators
Generally Two CategoriesGenerally Two Categories
• Hydraulic
 Holed Hydraulic
 Holeless Hydraulic
 Roped Hydraulic
Roped holeless hydraulic elevators use
a telescoping hydraulic piston and a
hoist rope and pulley system to increase
speed and travel heights.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Machine RoomMachine Room
•• CabsCabs
•• HoistwayHoistway/Pits/Pits
Major ComponentsMajor Components
Machine rooms for traction elevators generally
located directly above the hoistway. Hydraulic
elevator machine rooms typically located at the
basement or lowest level adjacent to the hoistway.
Hydraulic ElevatorsHydraulic Elevators
Telescoping Plunger
Above-Ground
Cylinder
Hydraulic Tank /
Controller
Car Buffer
Elevator Components & DescriptionsElevator Components & Descriptions
•• Hoist MachineHoist Machine
Machine RoomMachine Room
Can be geared traction machines
in which the power from the
motor is transmitted to the drive
sheave through reduction gears,
or a gearless machine in which
the hoist ropes pass over a
traction drive sheave which is an
integral part of the armature.
The grooved wheel of a traction-type hoisting machine over which
the hoist ropes pass, and by which motion is imparted to the car and
counterweight by the hoist ropes.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Hoist MachineHoist Machine
•• Hoist MotorHoist Motor
Machine RoomMachine Room
Also called drive machines and
used for traction elevators.
They are the power units that
apply the energy to the hoist
machines. Can be AC or DC.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Hoist Machine
• Hoist Motor
•• GeneratorGenerator
Machine RoomMachine Room
Generators are electro-
mechanical devices that
convert mechanical energy
to electrical energy (usually
direct current).
Elevator Components & DescriptionsElevator Components & Descriptions
•• HoistHoist MachineMachine
•• Hoist MotorHoist Motor
•• GeneratorGenerator
•• GovernorGovernor
Machine RoomMachine Room
A mechanical speed control mechanism. Usually a wire-rope driven
centrifugal device used to stop and hold the movement of its driving
rope. This initiates the activation of the car safety device. It opens a
switch which cuts off power to the drive motor and brake if the car
travels at a preset overspeed in the down direction.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Hoist MachineHoist Machine
•• Hoist MotorHoist Motor
•• GeneratorGenerator
•• GovernorGovernor
•• ControllersControllers
Machine RoomMachine Room
A device, or group of devices, which serve to control, in a
predetermined manner, the floor selection, drive speeds, car
selection and general operation of the elevators.
Elevator Components & DescriptionsElevator Components & Descriptions
•• HoistHoist MachineMachine
•• Hoist MotorHoist Motor
•• GeneratorGenerator
•• GovernorGovernor
•• ControllersControllers
•• DisconnectsDisconnects
Machine RoomMachine Room
Switches to disconnect the power to the controller and cab lights and
located in the machine room.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Roller GuidesRoller Guides
HoistwayHoistway / Pits/ Pits
Roller guides or guide rails are
steel T-section with machined
guiding surfaces installed
vertically in a hoistway to guide
and direct the course of travel
of an elevator car and elevator
counterweights.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Roller GuidesRoller Guides
•• CounterweightsCounterweights
HoistwayHoistway / Pits/ Pits
A weight that counter-balances the
weight of an elevator car plus
approximately 40% of the capacity
load.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Roller GuidesRoller Guides
•• CounterweightsCounterweights
•• Door InterlocksDoor Interlocks
HoistwayHoistway / Pits/ Pits
An electro-mechanical device that prevents operation of an elevator
unless the hoistway doors are in the closed and locked position; and
prevents opening of a hoistway door from the landing side unless the
elevator is in the landing zone and is either stopped or being stopped.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Roller GuidesRoller Guides
•• CounterweightsCounterweights
•• Door InterlocksDoor Interlocks
•• TopTop--ofof--Car StationCar Station
HoistwayHoistway / Pits/ Pits
Controls on the top of the car used by an elevator maintenance
contractor to operate the car at inspection speed. It provides a
means of operating an elevator from on top of the car at slow speed
during adjustment, inspection, maintenance and repair.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Roller GuidesRoller Guides
•• CounterweightsCounterweights
•• Door InterlocksDoor Interlocks
•• Top of Car StationTop of Car Station
•• BuffersBuffers
HoistwayHoistway / Pits/ Pits
A device designed to stop a descending car beyond its normal limit
of travel by storing or by absorbing and dissipating the kinetic
energy of the car. Spring buffers are used for elevators with speeds
less than 200 fpm. Oil buffers (for speeds greater than 200 fpm) use a
combination of oil and spring to cushion the elevator.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Cab FinishesCab Finishes
Elevator CabsElevator Cabs
Decorative features in a
passenger elevator including
carpet or other flooring, wall
panels, door finishes, ceilings
and lighting.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Cab FinishesCab Finishes
•• Cab ControlsCab Controls
Elevator CabsElevator Cabs
A car-operating panel with a
faceplate that is mounted in a fixed
(non-swing) panel or sidewall.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Cab FinishesCab Finishes
•• Cab ControlsCab Controls
•• Safety FeaturesSafety Features
 PhonesPhones
 Door Safety EdgesDoor Safety Edges
Elevator CabsElevator Cabs
Two way communication devices in the
cab required by ADA and national
elevator codes for safety.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Cab FinishesCab Finishes
•• Cab ControlsCab Controls
•• Safety FeaturesSafety Features
 PhonesPhones
 Door Safety EdgesDoor Safety Edges
Elevator CabsElevator Cabs
A door protective and automatic door reopening device, used with
automatic power door operators.
Elevator Components & DescriptionsElevator Components & Descriptions
•• Cab FinishesCab Finishes
•• Cab ControlsCab Controls
•• Safety FeaturesSafety Features
 PhonesPhones
 Door Safety EdgesDoor Safety Edges
•• Door OperatorsDoor Operators
Elevator CabsElevator Cabs
The Door Operator monitors the
speed and position of the car
doors and compares performance
against standards. Deviations in
kinetic energy during door travel
is corrected within milliseconds.
Preliminary Design or Design ConsiderationPreliminary Design or Design Consideration
P.S: Complete description refer NBCP.S: Complete description refer NBC--2005 (Part2005 (Part –– 8)8)
•• No. of lifts andNo. of lifts and hhandling capacityandling capacity
 NumberNumber of floors to be served by theof floors to be served by the lift; Floorlift; Floor toto
floor distance;floor distance;
 Population of each floor to be serve~Population of each floor to be serve~ and Maximumand Maximum
peak demand; this demandpeak demand; this demand maybe unidirectionalmaybe unidirectional, as, as
in up and downin up and down peak periodspeak periods, or a two, or a two--way trafficway traffic
movement.movement.
•• Preliminary LiftPreliminary Lift PlanningPlanning
 population or the number of peoplepopulation or the number of people who requirewho require liftlift
serviceservice
Design ConsiderationDesign Consideration
 handlinghandling capacity of the maximum flowcapacity of the maximum flow rate requiredrate required
by these people.by these people.
 intervalinterval or the quality of service requiredor the quality of service required..
•• PopulationPopulation
AverageAverage population densitypopulation density can vary from about one person per 4 mcan vary from about one person per 4 m22
to oneto one person per 20 mperson per 20 m22
•• Quantity of serviceQuantity of service
Design ConsiderationDesign Consideration
•• Quality of serviceQuality of service
•• Traffic peakTraffic peak
•• CapacityCapacity
The minimum size of car recommended for a single purpose buildingsThe minimum size of car recommended for a single purpose buildings
is one suitable for a duty load of 884 kg. Generally, for large officeis one suitable for a duty load of 884 kg. Generally, for large office
buildings cars with capacities up to 2040 kg are recommendedbuildings cars with capacities up to 2040 kg are recommended
according to the requirements.according to the requirements.
Design ConsiderationDesign Consideration
•• SpeedSpeed
•• LayoutLayout
Design ConsiderationDesign Consideration
The handling capacity is calculated byThe handling capacity is calculated by the following formula:the following formula:
H=(H=(3OOXQX1OO/(3OOXQX1OO/(TxPTxP))
wherewhere
H = Handling capacity as the percentage of theH = Handling capacity as the percentage of the
peak population handled during 5peak population handled during 5 min periodmin period,,
Q = Average number of passengers carried inQ = Average number of passengers carried in a cara car,,
T = Waiting interval in seconds, andT = Waiting interval in seconds, and
P = Total population to be handled during peakP = Total population to be handled during peak
morning period. (It is related to themorning period. (It is related to the area servedarea served by aby a
particular bank ofparticular bank of lifts).lifts).
Preliminary Design of ElevatorPreliminary Design of Elevator
••The waiting interval is calculated by the followingThe waiting interval is calculated by the following
formula:formula:
T= RTT/NT= RTT/N
wherewhere
T = Waiting interval in seconds,T = Waiting interval in seconds,
N = Number of lifts, andN = Number of lifts, and
RTTRTT == RoundRound triptrip time,time, thatthat is,is, thethe averageaverage timetime requiredrequired byby
eacheach liftlift inin takingtaking oneone fullfull loadload ofof passengerspassengers fromfrom groundground
floor,floor, dischargingdischarging themthem inin variousvarious upperupper floorsfloors andand comingcoming
backback toto groundground floorfloor forfor takingtaking freshfresh passengerspassengers forfor thethe nextnext
triptrip
Preliminary Design of ElevatorPreliminary Design of Elevator
ExampleExample
Outline
• Stairs
• Elevators
• Escalators
• Ramps
Escalator
Escalator — A power driven, inclined, continuous stairway
used for raising or lowering passengers.
 Named Escalator by Charles
Seeberger in 1897 by combining
the latin word for steps “scala” and
elevator
 Charles Seeberger sold rights
to Otis Elevator Company in 1902
which is currently the dominant player in the industry.
 Most applications include department stores, airports,
shopping malls, convention centers, hotels, and public
buildings
 One of the largest, most expensive machines people use
on a regular basis, but also one of the simplest.
Escalator Installation
It includes the escalator, the track, the trusses or girders,
the balustrading, the step treads and landings and all
chains, wires and machinery directly connected with the
operation of the escalator.
Features of escalator (Benefits)
 Escalators are required to provide continuous mass transport
of people.
 Escalators in department stores rise at an angle of between
(30°-35°). The 35° escalator is more economical, as it takes
up less surface area.
 Have the capacity to move large numbers of people, and they
can be placed in the same physical space as one might install
a staircase.
 Have no waiting interval (except during very heavy traffic)
 They can be used to guide people toward main exits or
special exhibits, and may be weatherproofed for outdoor use.
 Escalator speeds vary from 90 – 180 ft per minute, an
escalator moving 145 ft per minute can carry more that 10,000
people in an hour
Escalator operation and operating guidelines
 As the escalators operate at a constant speed, serve only two levels
and have a known maximum capacity, the traffic study is rather easy.
Provided the population to be handled in a given time is known, it is
easy to predict the rate at which the population can be handled.
 Regularly (at least monthly) apply a silicone friction reducer on skirt
panels
 Document any unusual noises or vibrations.
 Remove any debris
 Monitor for broken comb teeth
 Always remove the start-up key from the "on” direction.
 If an escalator or moving walkway makes an automatic emergency
stop, perform a detailed equipment check before returning to
operation.
 Do not permit overloading of passengers or freight.
 Do not permit the use of an inoperative escalator as a stairway
Design Consideration
 For normal peak periods, the recommended handling capacities for
design purposes should be taken as 3200 to 6400 persons per hour
depending upon the width of the escalator.
 In accordance with a worldwide standard, the width of the step to be
used is 60 cm (for one person width)80 cm (for one- to two people
width) and 100 cm (for two people width).
 The theoretical capacity then is: 3 600x (rated speed in m/s x k)/O.4
 K = 1, 1.5 or 2 for 0.6, 0.8 and 1.0 m step widths.
Escalator Arrangements
Crisscross Arrangement
Parallel Arrangement
Escalator Arrangements
Ramps
 Ramps are sloping surface that can be used to provide an easy
connection from floor to floor especially when large numbers of
people or vehicles are moving from time to time.
 Ramps are adopted for buildings, such as stadiums, railroad
stations, exhibition halls, garage buildings, etc.
 it is generally built with slopes up to 15% (15 cm in 100 cm) but
10% is preferred. With 10% slope and a storey height of 12 feet
a ramp connecting two floors would have to be 120 feet long.
 It can be curved, zigzagged, u-shaped or spiraled and bin all
cases should be constructed with a non-slip surface.
Design Consideration
 An exterior location is preferred for ramps. Indoor ramps are not
recommended because they take up a great deal of space.
 Ideally, the entrance to a ramp should be immediately adjacent
to the stairs.
 Ramps configuration
Design Consideration
 Width
The minimum width should be 0.90 m.
 Slope
Design Consideration
 Landings
 Ramps should be provided with landings for resting,
maneuvering and avoiding excessive speed.
 Landings should be provided every 10.00 m, at every change of
direction and at the top and bottom of every ramp.
 Handrail
A protective handrail at least 0.40 m
 Surface
The ramp surface should be hard and non-slip.
 Tactile marking
A colored textural indication at the top and bottom of the ramp
should be placed to alert sightless people as to the location of the
ramp.
The marking strip width should not be less than 0.60 m.
Moving walks
Inclined ramps
References
 B.C. Punmia; Ashok Kumar Jain; Arun Kumar Jain (2005).
“Building Construction." . Lakshmi Publishers Limited, New
Delhi – 110002.
 National Building Code (2005) Published By Bureau of
Indian Standards, Manak Bhavan, 9 Bahadur Shah Zafar
Marg, NEW DELHI 110002.
 http://books.google.co.in/books?hl=en
Thank you

More Related Content

What's hot (20)

Escalators
EscalatorsEscalators
Escalators
 
Lifts and Escalators (Schindler)
Lifts and Escalators (Schindler)Lifts and Escalators (Schindler)
Lifts and Escalators (Schindler)
 
Lifts and escalators
Lifts and escalatorsLifts and escalators
Lifts and escalators
 
Rolling shutter
Rolling shutterRolling shutter
Rolling shutter
 
Buildings Structure system
Buildings Structure systemBuildings Structure system
Buildings Structure system
 
Vertical transportation system
Vertical transportation systemVertical transportation system
Vertical transportation system
 
Vertical transportation-Stairs,Elevators,Escalators.pdf
Vertical transportation-Stairs,Elevators,Escalators.pdfVertical transportation-Stairs,Elevators,Escalators.pdf
Vertical transportation-Stairs,Elevators,Escalators.pdf
 
Escalators
EscalatorsEscalators
Escalators
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
vertical-transportation (mechanical)
vertical-transportation (mechanical)vertical-transportation (mechanical)
vertical-transportation (mechanical)
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
presentation ON TALL BUILDING
 
Lift
LiftLift
Lift
 
Vertical Circulation and Services of Highrise
Vertical Circulation and Services of HighriseVertical Circulation and Services of Highrise
Vertical Circulation and Services of Highrise
 
Elevators and its types
Elevators and its typesElevators and its types
Elevators and its types
 
Building Service Chapter 5
Building Service Chapter 5Building Service Chapter 5
Building Service Chapter 5
 
Lift.escalator & moving walk
Lift.escalator & moving walkLift.escalator & moving walk
Lift.escalator & moving walk
 
modular coordination
modular coordinationmodular coordination
modular coordination
 
Long span structures
Long span structures  Long span structures
Long span structures
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Shell structure
Shell structureShell structure
Shell structure
 

Viewers also liked (11)

Vertical transportation
Vertical transportationVertical transportation
Vertical transportation
 
Stairs
StairsStairs
Stairs
 
Building Services- Ventilation
Building Services- VentilationBuilding Services- Ventilation
Building Services- Ventilation
 
Presentation on bangladesh bank
Presentation on bangladesh bankPresentation on bangladesh bank
Presentation on bangladesh bank
 
Mechanical Ventilation
Mechanical VentilationMechanical Ventilation
Mechanical Ventilation
 
Functional Planning of a Building
 Functional Planning of a Building Functional Planning of a Building
Functional Planning of a Building
 
Ventilation system
Ventilation systemVentilation system
Ventilation system
 
Lift Design
Lift  DesignLift  Design
Lift Design
 
Transportation Systems In Buildings
Transportation Systems In BuildingsTransportation Systems In Buildings
Transportation Systems In Buildings
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
 

Similar to Vertical Transportation Systems in Buildings by Ramesh Nayaka

Arch 3125 (Vertical Transportation)-L2.pptx
Arch 3125 (Vertical Transportation)-L2.pptxArch 3125 (Vertical Transportation)-L2.pptx
Arch 3125 (Vertical Transportation)-L2.pptxbiswas2025001
 
Types of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionTypes of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionEr.Karan Chauhan
 
Staircase gyan
Staircase gyan Staircase gyan
Staircase gyan Sneha Das
 
Stairs (for civil engineering)
Stairs  (for civil engineering)Stairs  (for civil engineering)
Stairs (for civil engineering)laxman singh
 
Lecture7 types of staircase
Lecture7 types of staircaseLecture7 types of staircase
Lecture7 types of staircaseAfroz Khan
 
design of staircase
design of staircasedesign of staircase
design of staircasevasu.chawla
 
Stairs.docx
Stairs.docxStairs.docx
Stairs.docxbasamuel
 
Staircase and it's Classification in details
Staircase and it's Classification in detailsStaircase and it's Classification in details
Staircase and it's Classification in detailsMuhammod Saikot
 
Types & construction of stairs with photos
Types & construction of stairs with photosTypes & construction of stairs with photos
Types & construction of stairs with photosakshitachauhan1206
 
Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircasesKHUSHBU SHAH
 

Similar to Vertical Transportation Systems in Buildings by Ramesh Nayaka (20)

Arch 3125 (Vertical Transportation)-L2.pptx
Arch 3125 (Vertical Transportation)-L2.pptxArch 3125 (Vertical Transportation)-L2.pptx
Arch 3125 (Vertical Transportation)-L2.pptx
 
Types of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionTypes of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building Construction
 
STAIRCASES.pptx
STAIRCASES.pptxSTAIRCASES.pptx
STAIRCASES.pptx
 
Staircase
StaircaseStaircase
Staircase
 
Staircases
StaircasesStaircases
Staircases
 
Staircase gyan
Staircase gyan Staircase gyan
Staircase gyan
 
Stairs (for civil engineering)
Stairs  (for civil engineering)Stairs  (for civil engineering)
Stairs (for civil engineering)
 
Stairs
StairsStairs
Stairs
 
Lecture7 types of staircase
Lecture7 types of staircaseLecture7 types of staircase
Lecture7 types of staircase
 
design of staircase
design of staircasedesign of staircase
design of staircase
 
Timber staircase
Timber staircaseTimber staircase
Timber staircase
 
Stairs.docx
Stairs.docxStairs.docx
Stairs.docx
 
Staircase and it's Classification in details
Staircase and it's Classification in detailsStaircase and it's Classification in details
Staircase and it's Classification in details
 
STAIRS (PART 1)
STAIRS (PART 1)STAIRS (PART 1)
STAIRS (PART 1)
 
Unit 11-building-part-1
Unit 11-building-part-1Unit 11-building-part-1
Unit 11-building-part-1
 
stair-1_044053.pptx
stair-1_044053.pptxstair-1_044053.pptx
stair-1_044053.pptx
 
Types & construction of stairs with photos
Types & construction of stairs with photosTypes & construction of stairs with photos
Types & construction of stairs with photos
 
Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircases
 
UNIT &7 ladder.pptx
UNIT &7 ladder.pptxUNIT &7 ladder.pptx
UNIT &7 ladder.pptx
 
Stairs
StairsStairs
Stairs
 

Recently uploaded

National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxachiever3003
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 

Recently uploaded (20)

National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptx
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 

Vertical Transportation Systems in Buildings by Ramesh Nayaka

  • 1. Mr. Ramesh Nayaka, (M.Tech. - IITM) Lecturer, Department of Civil Engineering National Institute of Technology Calicut, Kerala India - 673601 Module – 3 Vertical Transportation (Building Services) CE2007 - Functional Design of Buildings
  • 2. Vertical Transportation ?? • To provide an accessible path, leading from one level to another by targeting to meet the needs of all target groups.
  • 4. What is a stair and it’s components?? A stair is a series of steps, each elevated a measured distance, leading from one level of a structure to another.  Stair parts and terms • Headroom • Tread • Riser • Unit rise • Unit run • Total rise • Stringer • Stair well • Total run http://atjenese.wordpress.com
  • 5. Cont’d… • Platform • Winding stairs • Run of stairs or flight • Straight run • Winders http://atjenese.wordpress.com
  • 6. Cont’d….. • Handrail • Wall rail • Baluster • Balustrade • Newel Post • Nosing http://atjenese.wordpress.com
  • 7. Terminologies 1. Headroom: The clear space between the floor line and ceiling. 2. Tread: Horizontal walking surface of a stair 3. Riser: The vertical stair member between two consecutive stair treads. 4. Unit rise: The height of the stair riser; the vertical distance between two treads. 5. Unit run: The width of a stair tread minus the nosing. 6. Total rise: Vertical distance from one floor to another 7. stringer: A stringer to which blocking has been added to form a base for adding treads and risers. 8. Stairwell: The rough opening in the floor above to provide headroom for stairs. 9. Total run: The horizontal distance occupied by the stairs; measured from the foot of the stairs to a point directly beneath where the stairs rest on a floor or landing above. 1. Platform: A horizontal section between two flights of stairs. Also called a landing. 2. Winding stairs: A curving stairway that gradually changes direction; usually circular or elliptical in shape. Also called geometrical. 3. Run of stairs: A series of steps that is a continuous section without breaks formed by landings or other constructions. Also called a flight of stairs. 4. Straight run: A stairway that does not change direction. 5. Winders: Wedge-shaped treads installed where stairs turn. 6. Handrail: A pole installed above and parallel to stair steps to act as a support for persons using the stairs. also called a stair rail. 7. Baluster: The vertical member (spindle) supporting the handrails on open stairs. 2. Newel: The main post at the start of a stair and the stiffening post at the landing. 3. Nosing: The part of a stair tread that projects beyond the riser Balustrade: An assembly with a railing resting on a series of balusters that, in turn, rest on a base, usually the treads • Wall rail: In closed stairs, the support rail that is
  • 8. Types of Stairs  STRAIGHT STAIRS:- • All steps lead in one direction • This may be continuous with two flights with an intermediate landing • Adopted when staircase is narrow and long • Provided mostly in porch, entrance etc.  DOG-LEGGED STAIRS:- • Consist of two straight flights running in opposite directions • There is no space between the flights in plan • Landing is provided at level which direction of flight changes
  • 9. Types of Stairs  GEOMETRICAL STAIRS :- • These stairs may have any geometrical shape and they require no newel post • This type of stair is similar to open newel stair except the well formed between forward and backward flight is curved • Change of direction in such stairs is achieved by winders and not by landings  CIRCULAR STAIRS:- • all the steps are radiate from a newel post or well hole • all the steps are winders • this is provided where space is limited and traffic is casual • mostly located at rear of building
  • 10. Types of Stairs http://atjenese.wordpress.com  QUARTER TURN NEWEL:- • A stair turning through 90° with the help of level landing • Used in shops and public buildings  OPEN NEWEL STAIRS:- • Popularly known as open well stairs • A well or opening is left between forward and backward flight • The opening is generally used for installation of lift • A short flight may or may not provided in these stairs
  • 11. Design Consideration Landing the width of the landing should not be less than the width of stairs Width of stairs Residential:-0.8 to 1 m Public :- 1.8 to 2 m Tread Residential:-220-250 mm Public:- 250-300mm Not less than 200mm in any case  Riser residential:-150-180 mm Public:- 120-150mm Not more than 200mm in any case Pitch Should not be more than 38°
  • 12. Dimensions of a Step  Comfortable ascent and descent  Thumb Rules  (2 x Rise in cm) + (Going (tread) in cm) = 60  (Rise in cm) + (Going in cm) = 40 to 45  (Rise in cm) x (Going in cm) = 400 to 450  Adopt Rise = 14 cm and Going = 30 cm as standard; then for every 20 mm subtracted from going, add 10 mm to the rise.  Residential building = 16 cm x 26 cm  Public building = 17 cm x 24 cm
  • 13. Requirements of a Good Stair Provide easy, quick and safe mode of communication between the floors. Following are the general requirements which a stair should fulfill.  Location :  It should be so located as to provide easy access to the occupants building.  It should be so located that it is well lighted and ventilated directly from the exterior.  It should be so located as to have approaches convenient and spacious.  Width of Stair:  It should be wide enough to carry the user without much crowd and in convenience.
  • 14. Cont’d….  Depends upto its location in the building and type of the building.  In a domestic building, a 90cm wide stair in sufficient while in public building, 1.5 m to 1.8 m width may be required.  Length of flight:  The number of steps are not more than 12 and not less than 3.  Pitch of stair:  a comfortable slope is achieved when twice rise plus going is equal to 60 cm approx. pitch should however, be limited to 30o degree to 45O  Head Room:  Clear space between tread and soffit of the flight immediately above it should not be less than 2.1 to 2.3 m.
  • 15. Cont’d..  Balustrade:  Open well stair should always be provided with balustrade, to provide safety to users.  Step dimensions:  the rise and tread should be of such dimensions as to provide comfort to the users. Their proportion should also be such as to provide pitch of the stair. The going should not be less than 25 cm, though 30 cm going is quite comfortable. The rise should be between 10 cm to 15 cm. The width of landing should not be less than width of stair.  Materials of Construction :  The materials used for stair construction should be such as to provide a) Sufficient strength and b) fire resistance
  • 16. Stairs of Different Materials  TIMBER  Light in weight and easy construct, but poor fire resistance  Used for small rise residential buildings, unsuitable for high rise residential and public buildings. Hardwood ( oak, mahogany etc.)  It should be free from fungal decay and insect attack.  STONE  Widely used where ashlar stone is readily available.  Quite strong and rigid, though they are very heavy.  Stone should be hard, strong and resistance to wear and fire resistance also. Stone stairs may have following types of steps: 1. Rectangular steps with rebated joint.
  • 17. Cont’d.. 2. Spandril steps 3. Tread and riser steps 4. Cantilever tread steps 5. Built – up steps  BRICKS  Very common except at entrance.  It contains either solid wall or arched openings may be left for obtaining storage space.  Frequent maintenance.  STEEL  Mild steel or cast iron steel are used only as emergency stairs.  Not common, though they are strong and fire resistant.
  • 18. Cont’d..  R.C.C  R.C.C stairs are the one which widely used for residential, public and industrial buildings.  Strong, hard wearing and fire resisting.  Usually cast in situ, and a variety of finishes can be made on these. R.C.C stairs may be divided into two categories 1. Stair with slab spanning horizontally. 2. Stair with slab spanning longitudinally.
  • 19. Design of a staircase.  Plan a dog legged stair for a building in which the vertical distance between the floor is 3.6 m. the stair hall measures 2.5 m x 5m.  Shows the plan of a stair hall of a public building, which measures 4.25 m x 5.25 m. the vertical distance between the floor is 3.9 m.
  • 20. Outline • Stairs • Elevators • Escalators • Ramps
  • 21. Elevator Elevator has been used in buildings having more than 4 stories.  Lift — An appliance designed to transport persons or materials between two or more levels in a vertical or substantially vertical direction by means of a guided car or platform. The word ‘elevator’ is also synonymously used for ‘lift’.  Lift Car — The load carrying unit with its floor or platform, car frame and enclosing bodywork.  Lift Landing — That’ portion of a building or structure used for discharge of passengers or goods or both into or from a lift car.  Lift Machine — The part of the lift equipment comprising the motor and the control gear therewith, reduction gear (if any), brake(s) and winding drum or sheave, by which the lift car is raised or lowered.
  • 22. Elevator  Lift Pit — The space in the lift well below the level of the lowest lift landing served.  Lift Well — The unobstructed space within an enclosure provided for the vertical movement of the lift car(s) and any counterweight(s), including the lift pit and the space for top clearance.  Lift Well Enclosure — Any structure which separates the lift well from its surroundings.  Passenger Lift — A lift designed for the transport of passengers.  Position and/or Direction Indicator — A device which indicates on the lift landing or in the lift car or both, the position of car in the lift well or the direction or both in which the lift car is traveling.
  • 23. Elevator  Rated Load (Lift) — The maximum load for which the lift car is designed and installed to carry safely at its rated speed.  Rated Speed (Lift) — The mean of the maximum speed attained by the lift car in the upward and downward direction with rated load in the lift car.
  • 25. Overview of Types of ElevatorsOverview of Types of Elevators Generally Two CategoriesGenerally Two Categories  Traction (Electric)  Virtually limitless rise (high & mid rise)  High speeds, but high installation cost  Hydraulic  Limited to heights of about 60 ft. (6 stories)  Lower speeds  Lower initial cost – higher power consumption The systems are distinguished primarily by their hoisting mechanisms.
  • 26. Overview of Types of Elevators Generally Two CategoriesGenerally Two Categories • Traction (Electric)  Geared Traction Drive shaft is connected to the sheave by gears in a gear box. Geared traction systems are designed to operate in the range of 100 to 500 fpm, which restricts their use to mid rise buildings.
  • 27. Overview of Types of ElevatorsOverview of Types of Elevators Generally Two CategoriesGenerally Two Categories • Traction (Electric)  Geared Traction  Gearless Traction Gearless traction systems are designed to operate in the range of 350 to 1200 fpm and typically installed in high-rise buildings. Greater speeds are also available.
  • 28. Overview of Types of ElevatorsOverview of Types of Elevators Generally Two CategoriesGenerally Two Categories • Hydraulic  Holed Hydraulic In-ground cylinder extends to a depth equal to the rise of the elevator cab. Current codes require double-bottom cylinders with leak detection and containment.
  • 29. Overview of Types of Elevators Generally Two CategoriesGenerally Two Categories • Hydraulic  Holed Hydraulic  Holeless Hydraulic Holeless hydraulic elevators use a telescoping hydraulic piston as the driving machine, eliminating the need for an in-ground cylinder. Currently limited to a height of about 3 stories.
  • 30. Overview of Types of ElevatorsOverview of Types of Elevators Generally Two CategoriesGenerally Two Categories • Hydraulic  Holed Hydraulic  Holeless Hydraulic  Roped Hydraulic Roped holeless hydraulic elevators use a telescoping hydraulic piston and a hoist rope and pulley system to increase speed and travel heights.
  • 31. Elevator Components & DescriptionsElevator Components & Descriptions •• Machine RoomMachine Room •• CabsCabs •• HoistwayHoistway/Pits/Pits Major ComponentsMajor Components Machine rooms for traction elevators generally located directly above the hoistway. Hydraulic elevator machine rooms typically located at the basement or lowest level adjacent to the hoistway.
  • 32. Hydraulic ElevatorsHydraulic Elevators Telescoping Plunger Above-Ground Cylinder Hydraulic Tank / Controller Car Buffer
  • 33. Elevator Components & DescriptionsElevator Components & Descriptions •• Hoist MachineHoist Machine Machine RoomMachine Room Can be geared traction machines in which the power from the motor is transmitted to the drive sheave through reduction gears, or a gearless machine in which the hoist ropes pass over a traction drive sheave which is an integral part of the armature. The grooved wheel of a traction-type hoisting machine over which the hoist ropes pass, and by which motion is imparted to the car and counterweight by the hoist ropes.
  • 34. Elevator Components & DescriptionsElevator Components & Descriptions •• Hoist MachineHoist Machine •• Hoist MotorHoist Motor Machine RoomMachine Room Also called drive machines and used for traction elevators. They are the power units that apply the energy to the hoist machines. Can be AC or DC.
  • 35. Elevator Components & DescriptionsElevator Components & Descriptions •• Hoist Machine • Hoist Motor •• GeneratorGenerator Machine RoomMachine Room Generators are electro- mechanical devices that convert mechanical energy to electrical energy (usually direct current).
  • 36. Elevator Components & DescriptionsElevator Components & Descriptions •• HoistHoist MachineMachine •• Hoist MotorHoist Motor •• GeneratorGenerator •• GovernorGovernor Machine RoomMachine Room A mechanical speed control mechanism. Usually a wire-rope driven centrifugal device used to stop and hold the movement of its driving rope. This initiates the activation of the car safety device. It opens a switch which cuts off power to the drive motor and brake if the car travels at a preset overspeed in the down direction.
  • 37. Elevator Components & DescriptionsElevator Components & Descriptions •• Hoist MachineHoist Machine •• Hoist MotorHoist Motor •• GeneratorGenerator •• GovernorGovernor •• ControllersControllers Machine RoomMachine Room A device, or group of devices, which serve to control, in a predetermined manner, the floor selection, drive speeds, car selection and general operation of the elevators.
  • 38. Elevator Components & DescriptionsElevator Components & Descriptions •• HoistHoist MachineMachine •• Hoist MotorHoist Motor •• GeneratorGenerator •• GovernorGovernor •• ControllersControllers •• DisconnectsDisconnects Machine RoomMachine Room Switches to disconnect the power to the controller and cab lights and located in the machine room.
  • 39. Elevator Components & DescriptionsElevator Components & Descriptions •• Roller GuidesRoller Guides HoistwayHoistway / Pits/ Pits Roller guides or guide rails are steel T-section with machined guiding surfaces installed vertically in a hoistway to guide and direct the course of travel of an elevator car and elevator counterweights.
  • 40. Elevator Components & DescriptionsElevator Components & Descriptions •• Roller GuidesRoller Guides •• CounterweightsCounterweights HoistwayHoistway / Pits/ Pits A weight that counter-balances the weight of an elevator car plus approximately 40% of the capacity load.
  • 41. Elevator Components & DescriptionsElevator Components & Descriptions •• Roller GuidesRoller Guides •• CounterweightsCounterweights •• Door InterlocksDoor Interlocks HoistwayHoistway / Pits/ Pits An electro-mechanical device that prevents operation of an elevator unless the hoistway doors are in the closed and locked position; and prevents opening of a hoistway door from the landing side unless the elevator is in the landing zone and is either stopped or being stopped.
  • 42. Elevator Components & DescriptionsElevator Components & Descriptions •• Roller GuidesRoller Guides •• CounterweightsCounterweights •• Door InterlocksDoor Interlocks •• TopTop--ofof--Car StationCar Station HoistwayHoistway / Pits/ Pits Controls on the top of the car used by an elevator maintenance contractor to operate the car at inspection speed. It provides a means of operating an elevator from on top of the car at slow speed during adjustment, inspection, maintenance and repair.
  • 43. Elevator Components & DescriptionsElevator Components & Descriptions •• Roller GuidesRoller Guides •• CounterweightsCounterweights •• Door InterlocksDoor Interlocks •• Top of Car StationTop of Car Station •• BuffersBuffers HoistwayHoistway / Pits/ Pits A device designed to stop a descending car beyond its normal limit of travel by storing or by absorbing and dissipating the kinetic energy of the car. Spring buffers are used for elevators with speeds less than 200 fpm. Oil buffers (for speeds greater than 200 fpm) use a combination of oil and spring to cushion the elevator.
  • 44. Elevator Components & DescriptionsElevator Components & Descriptions •• Cab FinishesCab Finishes Elevator CabsElevator Cabs Decorative features in a passenger elevator including carpet or other flooring, wall panels, door finishes, ceilings and lighting.
  • 45. Elevator Components & DescriptionsElevator Components & Descriptions •• Cab FinishesCab Finishes •• Cab ControlsCab Controls Elevator CabsElevator Cabs A car-operating panel with a faceplate that is mounted in a fixed (non-swing) panel or sidewall.
  • 46. Elevator Components & DescriptionsElevator Components & Descriptions •• Cab FinishesCab Finishes •• Cab ControlsCab Controls •• Safety FeaturesSafety Features  PhonesPhones  Door Safety EdgesDoor Safety Edges Elevator CabsElevator Cabs Two way communication devices in the cab required by ADA and national elevator codes for safety.
  • 47. Elevator Components & DescriptionsElevator Components & Descriptions •• Cab FinishesCab Finishes •• Cab ControlsCab Controls •• Safety FeaturesSafety Features  PhonesPhones  Door Safety EdgesDoor Safety Edges Elevator CabsElevator Cabs A door protective and automatic door reopening device, used with automatic power door operators.
  • 48. Elevator Components & DescriptionsElevator Components & Descriptions •• Cab FinishesCab Finishes •• Cab ControlsCab Controls •• Safety FeaturesSafety Features  PhonesPhones  Door Safety EdgesDoor Safety Edges •• Door OperatorsDoor Operators Elevator CabsElevator Cabs The Door Operator monitors the speed and position of the car doors and compares performance against standards. Deviations in kinetic energy during door travel is corrected within milliseconds.
  • 49. Preliminary Design or Design ConsiderationPreliminary Design or Design Consideration P.S: Complete description refer NBCP.S: Complete description refer NBC--2005 (Part2005 (Part –– 8)8) •• No. of lifts andNo. of lifts and hhandling capacityandling capacity  NumberNumber of floors to be served by theof floors to be served by the lift; Floorlift; Floor toto floor distance;floor distance;  Population of each floor to be serve~Population of each floor to be serve~ and Maximumand Maximum peak demand; this demandpeak demand; this demand maybe unidirectionalmaybe unidirectional, as, as in up and downin up and down peak periodspeak periods, or a two, or a two--way trafficway traffic movement.movement. •• Preliminary LiftPreliminary Lift PlanningPlanning  population or the number of peoplepopulation or the number of people who requirewho require liftlift serviceservice
  • 50. Design ConsiderationDesign Consideration  handlinghandling capacity of the maximum flowcapacity of the maximum flow rate requiredrate required by these people.by these people.  intervalinterval or the quality of service requiredor the quality of service required.. •• PopulationPopulation AverageAverage population densitypopulation density can vary from about one person per 4 mcan vary from about one person per 4 m22 to oneto one person per 20 mperson per 20 m22 •• Quantity of serviceQuantity of service
  • 51. Design ConsiderationDesign Consideration •• Quality of serviceQuality of service •• Traffic peakTraffic peak •• CapacityCapacity The minimum size of car recommended for a single purpose buildingsThe minimum size of car recommended for a single purpose buildings is one suitable for a duty load of 884 kg. Generally, for large officeis one suitable for a duty load of 884 kg. Generally, for large office buildings cars with capacities up to 2040 kg are recommendedbuildings cars with capacities up to 2040 kg are recommended according to the requirements.according to the requirements.
  • 52. Design ConsiderationDesign Consideration •• SpeedSpeed •• LayoutLayout
  • 54. The handling capacity is calculated byThe handling capacity is calculated by the following formula:the following formula: H=(H=(3OOXQX1OO/(3OOXQX1OO/(TxPTxP)) wherewhere H = Handling capacity as the percentage of theH = Handling capacity as the percentage of the peak population handled during 5peak population handled during 5 min periodmin period,, Q = Average number of passengers carried inQ = Average number of passengers carried in a cara car,, T = Waiting interval in seconds, andT = Waiting interval in seconds, and P = Total population to be handled during peakP = Total population to be handled during peak morning period. (It is related to themorning period. (It is related to the area servedarea served by aby a particular bank ofparticular bank of lifts).lifts). Preliminary Design of ElevatorPreliminary Design of Elevator
  • 55. ••The waiting interval is calculated by the followingThe waiting interval is calculated by the following formula:formula: T= RTT/NT= RTT/N wherewhere T = Waiting interval in seconds,T = Waiting interval in seconds, N = Number of lifts, andN = Number of lifts, and RTTRTT == RoundRound triptrip time,time, thatthat is,is, thethe averageaverage timetime requiredrequired byby eacheach liftlift inin takingtaking oneone fullfull loadload ofof passengerspassengers fromfrom groundground floor,floor, dischargingdischarging themthem inin variousvarious upperupper floorsfloors andand comingcoming backback toto groundground floorfloor forfor takingtaking freshfresh passengerspassengers forfor thethe nextnext triptrip Preliminary Design of ElevatorPreliminary Design of Elevator
  • 57. Outline • Stairs • Elevators • Escalators • Ramps
  • 58. Escalator Escalator — A power driven, inclined, continuous stairway used for raising or lowering passengers.  Named Escalator by Charles Seeberger in 1897 by combining the latin word for steps “scala” and elevator  Charles Seeberger sold rights to Otis Elevator Company in 1902 which is currently the dominant player in the industry.  Most applications include department stores, airports, shopping malls, convention centers, hotels, and public buildings  One of the largest, most expensive machines people use on a regular basis, but also one of the simplest.
  • 59. Escalator Installation It includes the escalator, the track, the trusses or girders, the balustrading, the step treads and landings and all chains, wires and machinery directly connected with the operation of the escalator.
  • 60. Features of escalator (Benefits)  Escalators are required to provide continuous mass transport of people.  Escalators in department stores rise at an angle of between (30°-35°). The 35° escalator is more economical, as it takes up less surface area.  Have the capacity to move large numbers of people, and they can be placed in the same physical space as one might install a staircase.  Have no waiting interval (except during very heavy traffic)  They can be used to guide people toward main exits or special exhibits, and may be weatherproofed for outdoor use.  Escalator speeds vary from 90 – 180 ft per minute, an escalator moving 145 ft per minute can carry more that 10,000 people in an hour
  • 61. Escalator operation and operating guidelines  As the escalators operate at a constant speed, serve only two levels and have a known maximum capacity, the traffic study is rather easy. Provided the population to be handled in a given time is known, it is easy to predict the rate at which the population can be handled.  Regularly (at least monthly) apply a silicone friction reducer on skirt panels  Document any unusual noises or vibrations.  Remove any debris  Monitor for broken comb teeth  Always remove the start-up key from the "on” direction.  If an escalator or moving walkway makes an automatic emergency stop, perform a detailed equipment check before returning to operation.  Do not permit overloading of passengers or freight.  Do not permit the use of an inoperative escalator as a stairway
  • 62. Design Consideration  For normal peak periods, the recommended handling capacities for design purposes should be taken as 3200 to 6400 persons per hour depending upon the width of the escalator.  In accordance with a worldwide standard, the width of the step to be used is 60 cm (for one person width)80 cm (for one- to two people width) and 100 cm (for two people width).  The theoretical capacity then is: 3 600x (rated speed in m/s x k)/O.4  K = 1, 1.5 or 2 for 0.6, 0.8 and 1.0 m step widths.
  • 67. Ramps  Ramps are sloping surface that can be used to provide an easy connection from floor to floor especially when large numbers of people or vehicles are moving from time to time.  Ramps are adopted for buildings, such as stadiums, railroad stations, exhibition halls, garage buildings, etc.  it is generally built with slopes up to 15% (15 cm in 100 cm) but 10% is preferred. With 10% slope and a storey height of 12 feet a ramp connecting two floors would have to be 120 feet long.  It can be curved, zigzagged, u-shaped or spiraled and bin all cases should be constructed with a non-slip surface.
  • 68. Design Consideration  An exterior location is preferred for ramps. Indoor ramps are not recommended because they take up a great deal of space.  Ideally, the entrance to a ramp should be immediately adjacent to the stairs.  Ramps configuration
  • 69. Design Consideration  Width The minimum width should be 0.90 m.  Slope
  • 70. Design Consideration  Landings  Ramps should be provided with landings for resting, maneuvering and avoiding excessive speed.  Landings should be provided every 10.00 m, at every change of direction and at the top and bottom of every ramp.  Handrail A protective handrail at least 0.40 m  Surface The ramp surface should be hard and non-slip.  Tactile marking A colored textural indication at the top and bottom of the ramp should be placed to alert sightless people as to the location of the ramp. The marking strip width should not be less than 0.60 m.
  • 73. References  B.C. Punmia; Ashok Kumar Jain; Arun Kumar Jain (2005). “Building Construction." . Lakshmi Publishers Limited, New Delhi – 110002.  National Building Code (2005) Published By Bureau of Indian Standards, Manak Bhavan, 9 Bahadur Shah Zafar Marg, NEW DELHI 110002.  http://books.google.co.in/books?hl=en