SlideShare a Scribd company logo
1 of 35
Logical
Framework
Analysis
(LFA)
Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius College (Autonomous),
President 2014, JCI Mangalore
Logical frame work
Analysis
• What is Logical Framework Analysis?
• The Logical Framework Approach (LFA) is a
management tool mainly used in the design,
monitoring and evaluation of
international development projects. It is also
widely known as Goal Oriented Project Planning
(GOPP) or Objectives Oriented Project Planning
(OOPP).

Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius College (Autonomous),
President 2014, JCI Mangalore
LFA: What is it all about?

• Used as a tool to convert problems/
objectives into a project. It links the goal
and objectives of a project to its inputs
and outputs.
• Helps in developing objective indicators
for all stages of the project and means of
verification for the indicators; overall
assumptions and risk factors which have a
bearing on the success / failure of the
project.
• Also helps in collecting data required for
monitoring and assessing the impact of
the project.
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
LFA IS A TOOL FOR IMPROVING THE

QUALITY OF PROJECTS
The Logical Framework Approach is
analytical tool for objectives- oriented project
planning and management
The key words are:
•
•
•
•

Objectives oriented
Target group oriented
Participatory
Clearly stating the Assumptions
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
LFA
I
Preparatory Phase
II
Analysis Phase
III
Planning Phase

Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
I. Preparatory Phase
A.
•
•
•

Determine the Focus Area
Determine the focus area to be analyzed
Study the focus area
Present results of fact finding in short
report
B. Analyze Stakeholders involved
• Identify all stakeholders who have a
relation to the focus area
• Identify what the most important
stakeholders contribute to and benefit
from the focus area.
Wetted
Shetty,
invite to the
• Determine who to by Jc LohithAloysius workshop
Asst Professor, St
II. Analysis Phase
A. Analyze the problems
•
•
•
•
•
•
•
•
•
•

Formulate problems from point of view of the
identified Stakeholders.
Check whether all relevant problems of stakeholders
are included
Check that problems are understood
Select a tentative “starter” problem
Identify direct causes of starter problem
Identify direct effects of starter problem
Continue identifying cause-effect relationships
Check completeness of the diagram
Add additional problems if necessary
Draw connecting lines to make “Problem Tree”
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
B. Analyze the Objectives
•
•
•
•

Restate problems as positive statements,
“reached” situations (objectives)
Compare problems and objectives. Discuss
the formulations.
Examine the “means-end” relationships
and adjust chart if needed
Draw connecting lines (“Objective Tree”)

C. Clustering
•
•

Identify clusters of related objectives in
terms
of
expertise
required/
commonality/ theme/ affinity
Give a name to each cluster
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
III. Planning Phase
A. Scope the project
•
•
•

Identify which clusters are outside of
project responsibility/resources
Determine willingness to contribute by
stakeholders to clusters.
Determine the priority ranking for
addressing the different objective
clusters.
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
Checklist of Criteria
Relationship with state/ national policies/ MDGs
Attractiveness to target groups
Contribution to other clusters
Probability of success
Side effects: Positive/Negative
Urgency
Resource availability
- Funds
- Counterpart institutions
- Expertise required/available
- Time horizon
• History of the project
• Sustainability
• Etc….
•
•
•
•
•
•
•

Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
B. Determine Intervention Logic and
External Factors
• Identify Overall Goal from the
objective tree
• Select Project Objectives/Purpose
from objective tree
outputs/results
that
• Identify
contribute to achieving the project
objectives/purpose.
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
LFA – Project Planning
Matrix
Col I
Project Structure

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Activities (Inputs)

Col II

Col III

Objectively variable
indicators (OVI)

Means of
verification (MV)

Col IV
Assumption risks

Overall goal hypothesis.

Step I. Define goal. What is
the wider sector goal? What
overall problem or need are
you trying to address? The
goal does not change, it may
be affected by external
factors.
Purpose / objective
assumptions

Output assumptions.

Activity and input
assumption.

Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
LFA – Project Planning
Matrix
Col I
Project Structure

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Activities (Inputs)

Col II

Col III

Objectively variable
indicators (OVI)

Means of
verification (MV)

Col IV
Assumption risks

Overall goal hypothesis.

Step 2.
Define the
objective/purpose.
What
impact do you hope to make?
How will the user benefit?
Purpose may also be affected
by factors outside your
project.
Purpose / objective
assumptions

Output assumptions.

Activity and input
assumption.

Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
LFA – Project Planning
Matrix
Col I
Project Structure

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Activities (Inputs)

Col II

Col III

Objectively variable
indicators (OVI)

Means of
verification (MV)

Col IV
Assumption risks

Overall goal hypothesis.

Step 3. Define the outputs.
What will be the measurable
end results of the planned
activities? What results will
the project be directly
responsible for? Project team
is accountable for the results.
Purpose / objective
assumptions

Output assumptions.

Activity and input
assumption.

Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
LFA – Project Planning
Matrix
Col I
Project Structure

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Activities (Inputs)

Col II

Col III

Objectively variable
indicators (OVI)

Means of
verification (MV)

Col IV
Assumption risks

Overall goal hypothesis.

Step 4. Define the activities.
What will actually be done to
achieve the outputs? This is a
summary
presentation
showing what needs to be
done to achieve each output.
Purpose / objective
assumptions

Output assumptions.

Activity and input
assumption.

Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
LFA – Project Planning
Matrix
Col I
Project Structure

Col II

Col III

Objectively variable
indicators (OVI)

Means of
verification (MV)

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Activities (Inputs)

Col IV
Assumption risks

Overall goal hypothesis.

Step 5. Verify vertical
logic. Use
‘if–then’
test to check cause and
effect.
Purpose / objective
assumptions

Output assumptions.

Activity and input
assumption.

Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
Assumptions / Risks
Assumptions are major conditions which are outside the

direct control of the project, but which are so important
that they will have to be met or have to hold true if the
project is to achieve its objectives.
Sources of generating Assumptions:
1. Unselected Objectives from ‘Objective Tree’
2. Constraints/ weaknesses of different stakeholders in the
project- from Stakeholder Analysis
3. Negative side effects of the project interventions
4. Rational, logic argumentations: “Which other external factors
must become true to achieve Outputs/Results, assuming that
Wetted by Jc Lohith Shetty,
all the activities are already achieved?” and so on..
Asst Professor, St Aloysius
LFA – Project Planning
Matrix
Col I

Col II

Col III

Col IV

Project Structure

Objectively variable
indicators (OVI)

Means of
verification (MV)

Assumption risks

Goal ( Overall
Programme goal

Step 7a. What will indicate
whether the goal has been
achieved?

Step 8a. How will
you verify goal
OVIs.

Overall goal hypothesis.

Purpose (Objectives
short term and long
term.)

Step 7b.
What will
indicate
whether
the
purpose or objective has
been achieved?

Step 8b. How will
you verify purpose
OVIs ?

Purpose / objective
assumptions

Outputs (results)

Step 7c. What will indicate
that the outputs have been
achieved? This indicators
define terms of reference
and the deliverables of the
project.

Step 8c. How will
you verify output
OVIs?

Output assumptions.

Activities (Inputs)

Step 7d
What project
Step 8d. How will
inputs and budget will be
you verify activity
the main OVIs here. What
OVIs. The project
inputs are needed to
accounts will be a
carryout the activities?
major MOV here.
Staff, transport, material,
finance etc. Wetted by Jc Lohith Shetty,

Step 6a. Define the
assumptions.
Include
here
anything that must
happens before the
project commence.
Asst Professor, St Aloysius

Activity and input
assumption.

Critical conditions
LFA – Project Planning
Matrix
Col I
Project Structure

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Activities (Inputs)

Col II
Objectively variable
indicators (OVI)

Col III
Means of
verification (MV)

Col IV
Assumption risks

Overall goal hypothesis.

Step 6b. Check the logic.
Will
the
completed
activities
lead
to
achievements
of
the
outputs? Are all the
resources
needed
to
achieve the outputs? What
assumptions external to
project have been made? If
assumption / risk high
redesign. Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius

Purpose / objective
assumptions

Output assumptions.

Activity and input
assumption.
LFA – Project Planning
Matrix
Col I
Project Structure

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Activities (Inputs)

Col II
Objectively variable
indicators (OVI)

Col III
Means of
verification (MV)

Col IV
Assumption risks

Overall goal hypothesis.

Step 6c. Define the
assumption. If the outputs
are produced would the
purpose be achieved?
What
assumptions
external to the projects
have been made about the
achievements
of
the
outputs?
If
risk
/
assumptions are Jc Lohith Shetty,
Wetted by too great
Asst the project.
then redesignProfessor, St Aloysius

Purpose / objective
assumptions

Output assumptions.

Activity and input
assumption.
LFA – Project Planning
Matrix
Col I
Project Structure

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Activities (Inputs)

Col II
Objectively variable
indicators (OVI)

Col III
Means of
verification (MV)

Step 6d. Define the
assumptions. If the
project purpose is
achieved, will this
contribute to solving
the problem – need. If
no, then redesign the
project.
If
yes,
mention
the
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
assumptions.

Col IV
Assumption risks

Overall goal hypothesis.

Purpose / objective
assumptions

Output assumptions.

Activity and input
assumption.
LFA – Project Planning
Matrix
Col I

Col II

Col III

Col IV

Project Structure

Objectively variable
indicators (OVI)

Means of
verification (MV)

Assumption risks

Goal ( Overall
Programme goal

Step 7a. What will indicate
whether the goal has been
achieved?

Step 8a. How will
you verify goal
OVIs.

Overall goal hypothesis.

Purpose (Objectives
short term and long
term.)

Step 7b.
What will
indicate
whether
the
purpose or objective has
been achieved?

Step 8b. How will
you verify purpose
OVIs ?

Purpose / objective
assumptions

Outputs (results)

Step 7c. What will indicate
that the outputs have been
achieved? This indicators
define terms of reference
and the deliverables of the
project.

Step 8c. How will
you verify output
OVIs?

Output assumptions.

Activities (Inputs)

Step 7d
What project
Step 8d. How will
inputs and budget will be
you verify activity
the main OVIs here. What
OVIs. The project
inputs are needed to
accounts will be a
carryout the activities?
major MOV here.
Staff, transport, material,
finance etc. Wetted by Jc Lohith Shetty,

Step 6e. Define the
assumptions. What
external factors are
needed for, or may
prevent the long
term sustainability
of the project.
Asst Professor, St Aloysius

Activity and input
assumption.

Critical conditions
LFA – Project Planning
Matrix
Col I
Project Structure

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Col II

Col III

Objectively variable
indicators (OVI)

Means of
verification (MV)

Col IV
Assumption risks

Step 7a. What will
indicate
whether
the goal has been
achieved?

Activities (Inputs)

Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
LFA – Project Planning
Matrix
Col I
Project Structure

Col II

Col III

Objectively variable
indicators (OVI)

Means of
verification (MV)

Col IV
Assumption risks

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Activities (Inputs)

Step 7b. What will
indicate
whether
the purpose or
objective has been
achieved?
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius

Critical conditions
LFA – Project Planning
Matrix
Col I
Project Structure

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Activities (Inputs)

Col II

Col III

Objectively variable
indicators (OVI)

Means of
verification (MV)

Col IV
Assumption risks

Step 7c.
What will
indicate that the outputs
have been achieved?
This indicators define
terms of reference and
the deliverables of the
project.
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
LFA – Project Planning
Matrix
Col I
Project Structure

Goal ( Overall
Programme goal)
Purpose (Objectives
short term and long
term.)
Outputs (results)

Activities (Inputs)

Col II

Col III

Objectively variable
indicators (OVI)

Means of
verification (MV)

Col IV
Assumption risks

Step 7d What project
inputs and budget will
be the main OVIs here.
What inputs are needed
to
carryout
the
activities?
Staff,
transport,
material,
finance etc.
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
LFA – Project Planning
Matrix
Col I

Col II

Col III

Col IV

Project Structure

Objectively variable
indicators (OVI)

Means of
verification (MV)

Assumption risks

Goal ( Overall
Programme goal

Step 7a. What will indicate
whether the goal has been
achieved?

Step 8a. How will
you verify goal
OVIs.

Overall goal hypothesis.

Purpose (Objectives
short term and long
term.)

Step 7b.
What will
indicate
whether
the
purpose or objective has
been achieved?

Step 8b. How will
you verify purpose
OVIs ?

Purpose / objective
assumptions

Outputs (results)

Step 7c. What will indicate
that the outputs have been
achieved? This indicators
define terms of reference
and the deliverables of the
project.

Step 8c. How will
you verify output
OVIs?

Output assumptions.

Activities (Inputs)

Step 7d
What project
Step 8d. How will
inputs and budget will be
you verify activity
the main OVIs here. What
OVIs. The project
inputs are needed to
accounts will be a
carryout the activities?
major MOV here.
Staff, transport, material,
finance etc.
Wetted by Jc Lohith Shetty,

Step 8a. How
will you verify
goal OVIs.

Asst Professor, St Aloysius

Activity and input
assumption.

Critical conditions
LFA – Project Planning
Matrix
Col I

Col II

Col III

Col IV

Project Structure

Objectively variable
indicators (OVI)

Means of
verification (MV)

Assumption risks

Goal ( Overall
Programme goal

Step 7a. What will indicate
whether the goal has been
achieved?

Step 8a. How will
you verify goal
OVIs.

Overall goal hypothesis.

Purpose (Objectives
short term and long
term.)

Step 7b.
What will
indicate
whether
the
purpose or objective has
been achieved?

Step 8b. How will
you verify purpose
OVIs ?

Purpose / objective
assumptions

Outputs (results)

Step 7c. What will indicate
that the outputs have been
achieved? This indicators
define terms of reference
and the deliverables of the
project.

Step 8c. How will
you verify output
OVIs?

Output assumptions.

Activities (Inputs)

Step 8b. How
will you verify
purpose OVIs ?

Step 7d
What project
Step 8d. How will
inputs and budget will be
you verify activity
the main OVIs here. What
OVIs. The project
inputs are needed to
accounts will be a
carryout the activities?
major MOV here.
Staff, transport, material,
finance etc. Wetted by Jc Lohith Shetty,

Asst Professor, St Aloysius

Activity and input
assumption.

Critical conditions
LFA – Project Planning
Matrix
Col I

Col II

Col III

Col IV

Project Structure

Objectively variable
indicators (OVI)

Means of
verification (MV)

Assumption risks

Goal ( Overall
Programme goal

Step 7a. What will indicate
whether the goal has been
achieved?

Step 8a. How will
you verify goal
OVIs.

Overall goal hypothesis.

Purpose (Objectives
short term and long
term.)

Step 7b.
What will
indicate
whether
the
purpose or objective has
been achieved?

Step 8b. How will
you verify purpose
OVIs ?

Purpose / objective
assumptions

Outputs (results)

Step 7c. What will indicate
that the outputs have been
achieved? This indicators
define terms of reference
and the deliverables of the
project.

Step 8c. How will
you verify output
OVIs?

Output assumptions.

Activities (Inputs)

Step 7d
What project
Step 8d. How will
inputs and budget will be
you verify activity
the main OVIs here. What
OVIs. The project
inputs are needed to
accounts will be a
carryout the activities?
major MOV here.
Staff, transport, material,
finance etc. Wetted by Jc Lohith Shetty,

Step 8c. How will you
verify output OVIs?

Asst Professor, St Aloysius

Activity and input
assumption.

Critical conditions
LFA – Project Planning
Matrix
Col I

Col II

Col III
Means of
verification (MV)

Col IV

Project Structure

Objectively variable
indicators (OVI)

Goal ( Overall
Programme goal

Step 7a. What will indicate
whether the goal has been
achieved?

Step 8a. How will
you verify goal
OVIs.

Overall goal hypothesis.

Purpose (Objectives
short term and long
term.)

Step 7b.
What will
indicate
whether
the
purpose or objective has
been achieved?

Step 8b. How will
you verify purpose
OVIs ?

Purpose / objective
assumptions

Outputs (results)

Step 7c. What will indicate
that the outputs have been
achieved? This indicators
define terms of reference
and the deliverables of the
project.

Step 8c. How will
you verify output
OVIs?

Output assumptions.

Activities (Inputs)

Step 7d
What project
Step 8d. How will
inputs and budget will be
you verify activity
the main OVIs here. What
OVIs. The project
inputs are needed to
accounts will be a
carryout the activities?
major MOV here.
Staff, transport, material,
finance etc. Wetted by Jc Lohith Shetty,

Step 8d. How will
you verify activity
OVIs. The project
accounts will be a
major MOV here

Asst Professor, St Aloysius

Assumption risks

Activity and input
assumption.

Critical conditions
LFA – Project Planning
Matrix
Col I

Col II

Col III

Col IV

Project Structure

Objectively variable
indicators (OVI)

Means of
verification (MV)

Assumption risks

Goal ( Overall
Programme goal

Step 7a. What will indicate
whether the goal has been
achieved?

Step 8a. How will
you verify goal
OVIs.

Overall goal hypothesis.

Purpose (Objectives
short term and long
term.)

Step 7b.
What will
indicate
whether
the
purpose or objective has
been achieved?

Step 8b. How will
you verify purpose
OVIs ?

Purpose / objective
assumptions

Outputs (results)

Step 7c. What will indicate
that the outputs have been
achieved? This indicators
define terms of reference
and the deliverables of the
project.

Step 8c. How will
you verify output
OVIs?

Output assumptions.

Activities (Inputs)

Step 7d
What project
inputs and budget will be
the main OVIs here. What
inputs are needed to
carryout the activities?
Staff, transport, material,
finance etc.
Wetted by

Step 8d. How will
you verify activity
OVIs. The project
accounts will be a
major MOV here.

Activity and input
assumption.

Jc Lohith Shetty,
Asst Professor, St Aloysius

Critical conditions
Steps in the formulation of a project
•
•

•

•

Preparatory Phase
Determine subject of analysis
Determine Stakeholders involved
Analysis
Analysis of problems
Analysis of objectives
Cluster objectives
Planning
Scope the project
Intervention logic
Assumption
Indicators and Means of verification
Implementation Planning
Strategies & Best Practices
Cross cutting issues- Equity, Gender, Exit and Sustainability
Institutional arrangements
Organisation- Personnel, Infrastructure & Scheduling
Monitoring & Evaluation
Learning & Reinforcement Mechanisms
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
TEN STEPS OF LF PROCESS
1. Define PROJECT PURPOSE (MISSION)
2. Define the GOAL(VISION)
3. Define OUT PUT strategy for achieving PP
4. Define key ACTIVITIES for each output
5. Identify key ASSUMPTIONS
6. Verify VERTICAL LOGIC
7. Define objectively verifiable INDICATORS
8. Verify HORIZONTAL LOGIC
9. Decide on MEANS OF VERIFICATION
10. REVIEW Design

Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
IV. Implementation Planning
Strategies & Best Practices
Cross cutting issues- Equity, Gender, Exit
and Sustainability
Institutional arrangements
Organisation- Personnel, Infrastructure
& Scheduling
Monitoring & Evaluation
Learning & Reinforcement Mechanisms
Wetted by Jc Lohith Shetty,
Asst Professor, St Aloysius
The Project Manager’s
Responsibilities:
1.

Produce Outputs- A Management “Contract”
• personal commitment

2.
3.

4.

• Management tools, e.g., Log frame Scheduling
Techniques, Influence, Persuasion, Coordination
Monitor assumptions at all levels.
Alert top management when:
• Output achievement uncertain.
• Outputs being produced on schedule but not
likely to result in project purpose/goal
achievement
Recommend corrective actions.Lohith Shetty,
Wetted by Jc
Asst Professor, St Aloysius

More Related Content

What's hot

Importance of M&E
Importance of M&EImportance of M&E
Importance of M&Eclearsateam
 
Monitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical frameworkMonitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical frameworkPreston Healthcare Consulting
 
Participatory learning and action
Participatory learning and actionParticipatory learning and action
Participatory learning and actionAparna Chaudhary
 
Monitoring and evaluation (2)
Monitoring and evaluation (2)Monitoring and evaluation (2)
Monitoring and evaluation (2)Dr.RAJEEV KASHYAP
 
Theory of Change
Theory of ChangeTheory of Change
Theory of Changeclearsateam
 
Introduction to monitoring and evaluation
Introduction to monitoring and evaluationIntroduction to monitoring and evaluation
Introduction to monitoring and evaluationMeshack Lomoywara
 
Participatory Approach (PA)
Participatory Approach (PA)Participatory Approach (PA)
Participatory Approach (PA)Khemraj Subedi
 
Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and EvaluationMadhawa Waidyaratna
 
Presentation on PRA & PLA Process
Presentation on PRA & PLA ProcessPresentation on PRA & PLA Process
Presentation on PRA & PLA ProcessGULZAR HUSSAIN
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframeWesley Opaki
 
Basics of Monitoring & Evaluation
Basics of Monitoring & EvaluationBasics of Monitoring & Evaluation
Basics of Monitoring & EvaluationFida Karim 🇵🇰
 
Participatory Monitoring and Evaluation
Participatory Monitoring and EvaluationParticipatory Monitoring and Evaluation
Participatory Monitoring and EvaluationLen Fontanilla
 

What's hot (20)

Importance of M&E
Importance of M&EImportance of M&E
Importance of M&E
 
Logical framework
Logical  frameworkLogical  framework
Logical framework
 
Monitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical frameworkMonitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical framework
 
Participatory learning and action
Participatory learning and actionParticipatory learning and action
Participatory learning and action
 
Monitoring and evaluation (2)
Monitoring and evaluation (2)Monitoring and evaluation (2)
Monitoring and evaluation (2)
 
Log frame-analysis
Log frame-analysisLog frame-analysis
Log frame-analysis
 
Theory of Change
Theory of ChangeTheory of Change
Theory of Change
 
Project Monitoring & Evaluation
Project Monitoring & EvaluationProject Monitoring & Evaluation
Project Monitoring & Evaluation
 
Introduction to monitoring and evaluation
Introduction to monitoring and evaluationIntroduction to monitoring and evaluation
Introduction to monitoring and evaluation
 
Participatory Approach (PA)
Participatory Approach (PA)Participatory Approach (PA)
Participatory Approach (PA)
 
Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and Evaluation
 
Presentation on PRA & PLA Process
Presentation on PRA & PLA ProcessPresentation on PRA & PLA Process
Presentation on PRA & PLA Process
 
Components of a monitoring and evaluation system
Components of a monitoring and evaluation system  Components of a monitoring and evaluation system
Components of a monitoring and evaluation system
 
Project cycle
Project cycleProject cycle
Project cycle
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframe
 
Basics of Monitoring & Evaluation
Basics of Monitoring & EvaluationBasics of Monitoring & Evaluation
Basics of Monitoring & Evaluation
 
Monitoring and Evaluation
Monitoring and EvaluationMonitoring and Evaluation
Monitoring and Evaluation
 
Final ppt
Final pptFinal ppt
Final ppt
 
Participatory Monitoring and Evaluation
Participatory Monitoring and EvaluationParticipatory Monitoring and Evaluation
Participatory Monitoring and Evaluation
 
Monitoring and Evaluation
Monitoring and Evaluation Monitoring and Evaluation
Monitoring and Evaluation
 

Viewers also liked

5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOsTony
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 
Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)rexcris
 
Preparing a logical framework for your project
Preparing a logical framework for your projectPreparing a logical framework for your project
Preparing a logical framework for your projectKarzen & Karzen d.o.o.
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: IndicatorsTony
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Erik Kijne
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal WritingTony
 
Lfa problem tree analysis
Lfa   problem tree analysisLfa   problem tree analysis
Lfa problem tree analysisLiris Thomas
 
Logical framework approach
Logical framework approachLogical framework approach
Logical framework approachMuhanad Sabha
 
A Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisA Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisTony
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalnooone
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]skzarif
 
Writing Successful Project Proposal
Writing Successful Project ProposalWriting Successful Project Proposal
Writing Successful Project ProposalGhulam Qadir
 
Proposal format
Proposal formatProposal format
Proposal formatMr SMAK
 
LOG FRAME, THE PROJECT SUMMARY
LOG FRAME, THE PROJECT SUMMARYLOG FRAME, THE PROJECT SUMMARY
LOG FRAME, THE PROJECT SUMMARYJacob Anyieth
 
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual ConferenceThe 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual ConferenceJames Kovacevic, MMP CMRP CAMA
 
C8 logical framework approach (lfa)
C8 logical framework approach (lfa)C8 logical framework approach (lfa)
C8 logical framework approach (lfa)ocasiconference
 

Viewers also liked (20)

5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)
 
Preparing a logical framework for your project
Preparing a logical framework for your projectPreparing a logical framework for your project
Preparing a logical framework for your project
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: Indicators
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
 
Lfa
LfaLfa
Lfa
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
 
Lfa problem tree analysis
Lfa   problem tree analysisLfa   problem tree analysis
Lfa problem tree analysis
 
Developing a problem tree
Developing a problem treeDeveloping a problem tree
Developing a problem tree
 
Logical framework approach
Logical framework approachLogical framework approach
Logical framework approach
 
A Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisA Guide to Logical Framework Analysis
A Guide to Logical Framework Analysis
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposal
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]
 
Writing Successful Project Proposal
Writing Successful Project ProposalWriting Successful Project Proposal
Writing Successful Project Proposal
 
Proposal format
Proposal formatProposal format
Proposal format
 
LOG FRAME, THE PROJECT SUMMARY
LOG FRAME, THE PROJECT SUMMARYLOG FRAME, THE PROJECT SUMMARY
LOG FRAME, THE PROJECT SUMMARY
 
2. The Logical Framework
2. The Logical Framework2. The Logical Framework
2. The Logical Framework
 
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual ConferenceThe 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
The 5 Levels of Maintenance Scheduling - SMRP 2016 Annual Conference
 
C8 logical framework approach (lfa)
C8 logical framework approach (lfa)C8 logical framework approach (lfa)
C8 logical framework approach (lfa)
 

Similar to Lfa Logical Framework Analysis

Tools of project planning and desgn
Tools of project planning and desgnTools of project planning and desgn
Tools of project planning and desgnMORTUZATOHAN
 
3 proj plan notes
3 proj plan notes3 proj plan notes
3 proj plan notesTony
 
Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notesTony
 
Introduction to monitoring and evaluation Ungaluk Program 2015
Introduction to monitoring and evaluation Ungaluk Program 2015Introduction to monitoring and evaluation Ungaluk Program 2015
Introduction to monitoring and evaluation Ungaluk Program 2015Martin Comeau
 
M3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptxM3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptxbipuait
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"Shafiyazahoor327
 
Workbook for Designing a Process Evaluation
 Workbook for Designing a Process Evaluation  Workbook for Designing a Process Evaluation
Workbook for Designing a Process Evaluation MoseStaton39
 
Workbook for Designing a Process Evaluation .docx
Workbook for Designing a Process Evaluation .docxWorkbook for Designing a Process Evaluation .docx
Workbook for Designing a Process Evaluation .docxAASTHA76
 
Workbook for Designing a Process Evaluation
 Workbook for Designing a Process Evaluation  Workbook for Designing a Process Evaluation
Workbook for Designing a Process Evaluation MikeEly930
 
NCRD LFA as M&E Tool Budgeting and Work Planning 7-3-23.pptx
NCRD LFA as M&E Tool Budgeting and Work Planning  7-3-23.pptxNCRD LFA as M&E Tool Budgeting and Work Planning  7-3-23.pptx
NCRD LFA as M&E Tool Budgeting and Work Planning 7-3-23.pptxssuser4d2c78
 
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...AntoineAbdelMassih2
 

Similar to Lfa Logical Framework Analysis (20)

Tools of project planning and desgn
Tools of project planning and desgnTools of project planning and desgn
Tools of project planning and desgn
 
3 proj plan notes
3 proj plan notes3 proj plan notes
3 proj plan notes
 
Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notes
 
Introduction to monitoring and evaluation Ungaluk Program 2015
Introduction to monitoring and evaluation Ungaluk Program 2015Introduction to monitoring and evaluation Ungaluk Program 2015
Introduction to monitoring and evaluation Ungaluk Program 2015
 
M3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptxM3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptx
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Objective Oriented Project Planning
Objective Oriented Project PlanningObjective Oriented Project Planning
Objective Oriented Project Planning
 
Workbook for Designing a Process Evaluation
 Workbook for Designing a Process Evaluation  Workbook for Designing a Process Evaluation
Workbook for Designing a Process Evaluation
 
Workbook for Designing a Process Evaluation .docx
Workbook for Designing a Process Evaluation .docxWorkbook for Designing a Process Evaluation .docx
Workbook for Designing a Process Evaluation .docx
 
Workbook for Designing a Process Evaluation
 Workbook for Designing a Process Evaluation  Workbook for Designing a Process Evaluation
Workbook for Designing a Process Evaluation
 
NCRD LFA as M&E Tool Budgeting and Work Planning 7-3-23.pptx
NCRD LFA as M&E Tool Budgeting and Work Planning  7-3-23.pptxNCRD LFA as M&E Tool Budgeting and Work Planning  7-3-23.pptx
NCRD LFA as M&E Tool Budgeting and Work Planning 7-3-23.pptx
 
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...
 
Ngo’s project management
Ngo’s project managementNgo’s project management
Ngo’s project management
 
Program Evaluation 1
Program Evaluation 1Program Evaluation 1
Program Evaluation 1
 
"Assessing Outcomes in CGIAR: Practical Approaches and Methods"
"Assessing Outcomes in CGIAR: Practical Approaches and Methods""Assessing Outcomes in CGIAR: Practical Approaches and Methods"
"Assessing Outcomes in CGIAR: Practical Approaches and Methods"
 
05 Project management
05 Project management05 Project management
05 Project management
 
Ms4 lfa
Ms4 lfaMs4 lfa
Ms4 lfa
 
A2011214171642 1
A2011214171642 1A2011214171642 1
A2011214171642 1
 
Logframe brainstormers
Logframe brainstormersLogframe brainstormers
Logframe brainstormers
 

More from JFM Lohith Shetty

Social Sciences Perspective for Social Work I
Social Sciences Perspective for Social Work ISocial Sciences Perspective for Social Work I
Social Sciences Perspective for Social Work IJFM Lohith Shetty
 
Social Sciences Perspective for Social Work II
Social Sciences Perspective for Social Work IISocial Sciences Perspective for Social Work II
Social Sciences Perspective for Social Work IIJFM Lohith Shetty
 
Social Sciences Perspective for Social Work
Social Sciences Perspective for Social WorkSocial Sciences Perspective for Social Work
Social Sciences Perspective for Social WorkJFM Lohith Shetty
 
Organisational Behavior and Development
Organisational Behavior and DevelopmentOrganisational Behavior and Development
Organisational Behavior and DevelopmentJFM Lohith Shetty
 
Organisational Behavior and Development
Organisational Behavior and DevelopmentOrganisational Behavior and Development
Organisational Behavior and DevelopmentJFM Lohith Shetty
 
Organisational Behavior and Development
Organisational Behavior and DevelopmentOrganisational Behavior and Development
Organisational Behavior and DevelopmentJFM Lohith Shetty
 
SSPSW Politics and Economics
SSPSW Politics and EconomicsSSPSW Politics and Economics
SSPSW Politics and EconomicsJFM Lohith Shetty
 
Mangalore chats veg n sweets
Mangalore chats veg n sweetsMangalore chats veg n sweets
Mangalore chats veg n sweetsJFM Lohith Shetty
 
India China USA economies @2017 end
India China USA economies @2017 endIndia China USA economies @2017 end
India China USA economies @2017 endJFM Lohith Shetty
 
Personality Development Tips
Personality Development TipsPersonality Development Tips
Personality Development TipsJFM Lohith Shetty
 
The Industrial Employment (Standing Orders) Act 1946
The Industrial Employment (Standing Orders) Act 1946The Industrial Employment (Standing Orders) Act 1946
The Industrial Employment (Standing Orders) Act 1946JFM Lohith Shetty
 
The Industrial Disputes Act 1947
The Industrial Disputes Act 1947The Industrial Disputes Act 1947
The Industrial Disputes Act 1947JFM Lohith Shetty
 
The Payment of Wages Act 1936
The Payment of Wages Act 1936The Payment of Wages Act 1936
The Payment of Wages Act 1936JFM Lohith Shetty
 
The Motor Transport Workers Act 1961
The Motor Transport Workers Act 1961The Motor Transport Workers Act 1961
The Motor Transport Workers Act 1961JFM Lohith Shetty
 
The Plantations Labour Act 1951
The Plantations Labour Act 1951The Plantations Labour Act 1951
The Plantations Labour Act 1951JFM Lohith Shetty
 

More from JFM Lohith Shetty (20)

Social Sciences Perspective for Social Work I
Social Sciences Perspective for Social Work ISocial Sciences Perspective for Social Work I
Social Sciences Perspective for Social Work I
 
Social Sciences Perspective for Social Work II
Social Sciences Perspective for Social Work IISocial Sciences Perspective for Social Work II
Social Sciences Perspective for Social Work II
 
Social Sciences Perspective for Social Work
Social Sciences Perspective for Social WorkSocial Sciences Perspective for Social Work
Social Sciences Perspective for Social Work
 
SSPSW Economics
SSPSW EconomicsSSPSW Economics
SSPSW Economics
 
Organisational Behavior and Development
Organisational Behavior and DevelopmentOrganisational Behavior and Development
Organisational Behavior and Development
 
Organisational Behavior and Development
Organisational Behavior and DevelopmentOrganisational Behavior and Development
Organisational Behavior and Development
 
Organisational Behavior and Development
Organisational Behavior and DevelopmentOrganisational Behavior and Development
Organisational Behavior and Development
 
SSPSW Politics and Economics
SSPSW Politics and EconomicsSSPSW Politics and Economics
SSPSW Politics and Economics
 
Mangalore chats veg n sweets
Mangalore chats veg n sweetsMangalore chats veg n sweets
Mangalore chats veg n sweets
 
Mangalore at a Glance
Mangalore at a GlanceMangalore at a Glance
Mangalore at a Glance
 
India China USA economies @2017 end
India China USA economies @2017 endIndia China USA economies @2017 end
India China USA economies @2017 end
 
Personality Development Tips
Personality Development TipsPersonality Development Tips
Personality Development Tips
 
Leader vs Manager
Leader vs ManagerLeader vs Manager
Leader vs Manager
 
Introduction to Ergonomics
Introduction to ErgonomicsIntroduction to Ergonomics
Introduction to Ergonomics
 
Active Listening
Active ListeningActive Listening
Active Listening
 
The Industrial Employment (Standing Orders) Act 1946
The Industrial Employment (Standing Orders) Act 1946The Industrial Employment (Standing Orders) Act 1946
The Industrial Employment (Standing Orders) Act 1946
 
The Industrial Disputes Act 1947
The Industrial Disputes Act 1947The Industrial Disputes Act 1947
The Industrial Disputes Act 1947
 
The Payment of Wages Act 1936
The Payment of Wages Act 1936The Payment of Wages Act 1936
The Payment of Wages Act 1936
 
The Motor Transport Workers Act 1961
The Motor Transport Workers Act 1961The Motor Transport Workers Act 1961
The Motor Transport Workers Act 1961
 
The Plantations Labour Act 1951
The Plantations Labour Act 1951The Plantations Labour Act 1951
The Plantations Labour Act 1951
 

Recently uploaded

Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxAneriPatwari
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17Celine George
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptxAneriPatwari
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 

Recently uploaded (20)

Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptx
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptx
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 

Lfa Logical Framework Analysis

  • 1. Logical Framework Analysis (LFA) Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius College (Autonomous), President 2014, JCI Mangalore
  • 2. Logical frame work Analysis • What is Logical Framework Analysis? • The Logical Framework Approach (LFA) is a management tool mainly used in the design, monitoring and evaluation of international development projects. It is also widely known as Goal Oriented Project Planning (GOPP) or Objectives Oriented Project Planning (OOPP). Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius College (Autonomous), President 2014, JCI Mangalore
  • 3. LFA: What is it all about? • Used as a tool to convert problems/ objectives into a project. It links the goal and objectives of a project to its inputs and outputs. • Helps in developing objective indicators for all stages of the project and means of verification for the indicators; overall assumptions and risk factors which have a bearing on the success / failure of the project. • Also helps in collecting data required for monitoring and assessing the impact of the project. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 4. LFA IS A TOOL FOR IMPROVING THE QUALITY OF PROJECTS The Logical Framework Approach is analytical tool for objectives- oriented project planning and management The key words are: • • • • Objectives oriented Target group oriented Participatory Clearly stating the Assumptions Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 5. LFA I Preparatory Phase II Analysis Phase III Planning Phase Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 6. I. Preparatory Phase A. • • • Determine the Focus Area Determine the focus area to be analyzed Study the focus area Present results of fact finding in short report B. Analyze Stakeholders involved • Identify all stakeholders who have a relation to the focus area • Identify what the most important stakeholders contribute to and benefit from the focus area. Wetted Shetty, invite to the • Determine who to by Jc LohithAloysius workshop Asst Professor, St
  • 7. II. Analysis Phase A. Analyze the problems • • • • • • • • • • Formulate problems from point of view of the identified Stakeholders. Check whether all relevant problems of stakeholders are included Check that problems are understood Select a tentative “starter” problem Identify direct causes of starter problem Identify direct effects of starter problem Continue identifying cause-effect relationships Check completeness of the diagram Add additional problems if necessary Draw connecting lines to make “Problem Tree” Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 8. B. Analyze the Objectives • • • • Restate problems as positive statements, “reached” situations (objectives) Compare problems and objectives. Discuss the formulations. Examine the “means-end” relationships and adjust chart if needed Draw connecting lines (“Objective Tree”) C. Clustering • • Identify clusters of related objectives in terms of expertise required/ commonality/ theme/ affinity Give a name to each cluster Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 9. III. Planning Phase A. Scope the project • • • Identify which clusters are outside of project responsibility/resources Determine willingness to contribute by stakeholders to clusters. Determine the priority ranking for addressing the different objective clusters. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 10. Checklist of Criteria Relationship with state/ national policies/ MDGs Attractiveness to target groups Contribution to other clusters Probability of success Side effects: Positive/Negative Urgency Resource availability - Funds - Counterpart institutions - Expertise required/available - Time horizon • History of the project • Sustainability • Etc…. • • • • • • • Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 11. B. Determine Intervention Logic and External Factors • Identify Overall Goal from the objective tree • Select Project Objectives/Purpose from objective tree outputs/results that • Identify contribute to achieving the project objectives/purpose. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 12. LFA – Project Planning Matrix Col I Project Structure Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Activities (Inputs) Col II Col III Objectively variable indicators (OVI) Means of verification (MV) Col IV Assumption risks Overall goal hypothesis. Step I. Define goal. What is the wider sector goal? What overall problem or need are you trying to address? The goal does not change, it may be affected by external factors. Purpose / objective assumptions Output assumptions. Activity and input assumption. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 13. LFA – Project Planning Matrix Col I Project Structure Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Activities (Inputs) Col II Col III Objectively variable indicators (OVI) Means of verification (MV) Col IV Assumption risks Overall goal hypothesis. Step 2. Define the objective/purpose. What impact do you hope to make? How will the user benefit? Purpose may also be affected by factors outside your project. Purpose / objective assumptions Output assumptions. Activity and input assumption. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 14. LFA – Project Planning Matrix Col I Project Structure Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Activities (Inputs) Col II Col III Objectively variable indicators (OVI) Means of verification (MV) Col IV Assumption risks Overall goal hypothesis. Step 3. Define the outputs. What will be the measurable end results of the planned activities? What results will the project be directly responsible for? Project team is accountable for the results. Purpose / objective assumptions Output assumptions. Activity and input assumption. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 15. LFA – Project Planning Matrix Col I Project Structure Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Activities (Inputs) Col II Col III Objectively variable indicators (OVI) Means of verification (MV) Col IV Assumption risks Overall goal hypothesis. Step 4. Define the activities. What will actually be done to achieve the outputs? This is a summary presentation showing what needs to be done to achieve each output. Purpose / objective assumptions Output assumptions. Activity and input assumption. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 16. LFA – Project Planning Matrix Col I Project Structure Col II Col III Objectively variable indicators (OVI) Means of verification (MV) Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Activities (Inputs) Col IV Assumption risks Overall goal hypothesis. Step 5. Verify vertical logic. Use ‘if–then’ test to check cause and effect. Purpose / objective assumptions Output assumptions. Activity and input assumption. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 17. Assumptions / Risks Assumptions are major conditions which are outside the direct control of the project, but which are so important that they will have to be met or have to hold true if the project is to achieve its objectives. Sources of generating Assumptions: 1. Unselected Objectives from ‘Objective Tree’ 2. Constraints/ weaknesses of different stakeholders in the project- from Stakeholder Analysis 3. Negative side effects of the project interventions 4. Rational, logic argumentations: “Which other external factors must become true to achieve Outputs/Results, assuming that Wetted by Jc Lohith Shetty, all the activities are already achieved?” and so on.. Asst Professor, St Aloysius
  • 18. LFA – Project Planning Matrix Col I Col II Col III Col IV Project Structure Objectively variable indicators (OVI) Means of verification (MV) Assumption risks Goal ( Overall Programme goal Step 7a. What will indicate whether the goal has been achieved? Step 8a. How will you verify goal OVIs. Overall goal hypothesis. Purpose (Objectives short term and long term.) Step 7b. What will indicate whether the purpose or objective has been achieved? Step 8b. How will you verify purpose OVIs ? Purpose / objective assumptions Outputs (results) Step 7c. What will indicate that the outputs have been achieved? This indicators define terms of reference and the deliverables of the project. Step 8c. How will you verify output OVIs? Output assumptions. Activities (Inputs) Step 7d What project Step 8d. How will inputs and budget will be you verify activity the main OVIs here. What OVIs. The project inputs are needed to accounts will be a carryout the activities? major MOV here. Staff, transport, material, finance etc. Wetted by Jc Lohith Shetty, Step 6a. Define the assumptions. Include here anything that must happens before the project commence. Asst Professor, St Aloysius Activity and input assumption. Critical conditions
  • 19. LFA – Project Planning Matrix Col I Project Structure Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Activities (Inputs) Col II Objectively variable indicators (OVI) Col III Means of verification (MV) Col IV Assumption risks Overall goal hypothesis. Step 6b. Check the logic. Will the completed activities lead to achievements of the outputs? Are all the resources needed to achieve the outputs? What assumptions external to project have been made? If assumption / risk high redesign. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius Purpose / objective assumptions Output assumptions. Activity and input assumption.
  • 20. LFA – Project Planning Matrix Col I Project Structure Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Activities (Inputs) Col II Objectively variable indicators (OVI) Col III Means of verification (MV) Col IV Assumption risks Overall goal hypothesis. Step 6c. Define the assumption. If the outputs are produced would the purpose be achieved? What assumptions external to the projects have been made about the achievements of the outputs? If risk / assumptions are Jc Lohith Shetty, Wetted by too great Asst the project. then redesignProfessor, St Aloysius Purpose / objective assumptions Output assumptions. Activity and input assumption.
  • 21. LFA – Project Planning Matrix Col I Project Structure Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Activities (Inputs) Col II Objectively variable indicators (OVI) Col III Means of verification (MV) Step 6d. Define the assumptions. If the project purpose is achieved, will this contribute to solving the problem – need. If no, then redesign the project. If yes, mention the Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius assumptions. Col IV Assumption risks Overall goal hypothesis. Purpose / objective assumptions Output assumptions. Activity and input assumption.
  • 22. LFA – Project Planning Matrix Col I Col II Col III Col IV Project Structure Objectively variable indicators (OVI) Means of verification (MV) Assumption risks Goal ( Overall Programme goal Step 7a. What will indicate whether the goal has been achieved? Step 8a. How will you verify goal OVIs. Overall goal hypothesis. Purpose (Objectives short term and long term.) Step 7b. What will indicate whether the purpose or objective has been achieved? Step 8b. How will you verify purpose OVIs ? Purpose / objective assumptions Outputs (results) Step 7c. What will indicate that the outputs have been achieved? This indicators define terms of reference and the deliverables of the project. Step 8c. How will you verify output OVIs? Output assumptions. Activities (Inputs) Step 7d What project Step 8d. How will inputs and budget will be you verify activity the main OVIs here. What OVIs. The project inputs are needed to accounts will be a carryout the activities? major MOV here. Staff, transport, material, finance etc. Wetted by Jc Lohith Shetty, Step 6e. Define the assumptions. What external factors are needed for, or may prevent the long term sustainability of the project. Asst Professor, St Aloysius Activity and input assumption. Critical conditions
  • 23. LFA – Project Planning Matrix Col I Project Structure Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Col II Col III Objectively variable indicators (OVI) Means of verification (MV) Col IV Assumption risks Step 7a. What will indicate whether the goal has been achieved? Activities (Inputs) Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 24. LFA – Project Planning Matrix Col I Project Structure Col II Col III Objectively variable indicators (OVI) Means of verification (MV) Col IV Assumption risks Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Activities (Inputs) Step 7b. What will indicate whether the purpose or objective has been achieved? Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius Critical conditions
  • 25. LFA – Project Planning Matrix Col I Project Structure Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Activities (Inputs) Col II Col III Objectively variable indicators (OVI) Means of verification (MV) Col IV Assumption risks Step 7c. What will indicate that the outputs have been achieved? This indicators define terms of reference and the deliverables of the project. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 26. LFA – Project Planning Matrix Col I Project Structure Goal ( Overall Programme goal) Purpose (Objectives short term and long term.) Outputs (results) Activities (Inputs) Col II Col III Objectively variable indicators (OVI) Means of verification (MV) Col IV Assumption risks Step 7d What project inputs and budget will be the main OVIs here. What inputs are needed to carryout the activities? Staff, transport, material, finance etc. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 27. LFA – Project Planning Matrix Col I Col II Col III Col IV Project Structure Objectively variable indicators (OVI) Means of verification (MV) Assumption risks Goal ( Overall Programme goal Step 7a. What will indicate whether the goal has been achieved? Step 8a. How will you verify goal OVIs. Overall goal hypothesis. Purpose (Objectives short term and long term.) Step 7b. What will indicate whether the purpose or objective has been achieved? Step 8b. How will you verify purpose OVIs ? Purpose / objective assumptions Outputs (results) Step 7c. What will indicate that the outputs have been achieved? This indicators define terms of reference and the deliverables of the project. Step 8c. How will you verify output OVIs? Output assumptions. Activities (Inputs) Step 7d What project Step 8d. How will inputs and budget will be you verify activity the main OVIs here. What OVIs. The project inputs are needed to accounts will be a carryout the activities? major MOV here. Staff, transport, material, finance etc. Wetted by Jc Lohith Shetty, Step 8a. How will you verify goal OVIs. Asst Professor, St Aloysius Activity and input assumption. Critical conditions
  • 28. LFA – Project Planning Matrix Col I Col II Col III Col IV Project Structure Objectively variable indicators (OVI) Means of verification (MV) Assumption risks Goal ( Overall Programme goal Step 7a. What will indicate whether the goal has been achieved? Step 8a. How will you verify goal OVIs. Overall goal hypothesis. Purpose (Objectives short term and long term.) Step 7b. What will indicate whether the purpose or objective has been achieved? Step 8b. How will you verify purpose OVIs ? Purpose / objective assumptions Outputs (results) Step 7c. What will indicate that the outputs have been achieved? This indicators define terms of reference and the deliverables of the project. Step 8c. How will you verify output OVIs? Output assumptions. Activities (Inputs) Step 8b. How will you verify purpose OVIs ? Step 7d What project Step 8d. How will inputs and budget will be you verify activity the main OVIs here. What OVIs. The project inputs are needed to accounts will be a carryout the activities? major MOV here. Staff, transport, material, finance etc. Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius Activity and input assumption. Critical conditions
  • 29. LFA – Project Planning Matrix Col I Col II Col III Col IV Project Structure Objectively variable indicators (OVI) Means of verification (MV) Assumption risks Goal ( Overall Programme goal Step 7a. What will indicate whether the goal has been achieved? Step 8a. How will you verify goal OVIs. Overall goal hypothesis. Purpose (Objectives short term and long term.) Step 7b. What will indicate whether the purpose or objective has been achieved? Step 8b. How will you verify purpose OVIs ? Purpose / objective assumptions Outputs (results) Step 7c. What will indicate that the outputs have been achieved? This indicators define terms of reference and the deliverables of the project. Step 8c. How will you verify output OVIs? Output assumptions. Activities (Inputs) Step 7d What project Step 8d. How will inputs and budget will be you verify activity the main OVIs here. What OVIs. The project inputs are needed to accounts will be a carryout the activities? major MOV here. Staff, transport, material, finance etc. Wetted by Jc Lohith Shetty, Step 8c. How will you verify output OVIs? Asst Professor, St Aloysius Activity and input assumption. Critical conditions
  • 30. LFA – Project Planning Matrix Col I Col II Col III Means of verification (MV) Col IV Project Structure Objectively variable indicators (OVI) Goal ( Overall Programme goal Step 7a. What will indicate whether the goal has been achieved? Step 8a. How will you verify goal OVIs. Overall goal hypothesis. Purpose (Objectives short term and long term.) Step 7b. What will indicate whether the purpose or objective has been achieved? Step 8b. How will you verify purpose OVIs ? Purpose / objective assumptions Outputs (results) Step 7c. What will indicate that the outputs have been achieved? This indicators define terms of reference and the deliverables of the project. Step 8c. How will you verify output OVIs? Output assumptions. Activities (Inputs) Step 7d What project Step 8d. How will inputs and budget will be you verify activity the main OVIs here. What OVIs. The project inputs are needed to accounts will be a carryout the activities? major MOV here. Staff, transport, material, finance etc. Wetted by Jc Lohith Shetty, Step 8d. How will you verify activity OVIs. The project accounts will be a major MOV here Asst Professor, St Aloysius Assumption risks Activity and input assumption. Critical conditions
  • 31. LFA – Project Planning Matrix Col I Col II Col III Col IV Project Structure Objectively variable indicators (OVI) Means of verification (MV) Assumption risks Goal ( Overall Programme goal Step 7a. What will indicate whether the goal has been achieved? Step 8a. How will you verify goal OVIs. Overall goal hypothesis. Purpose (Objectives short term and long term.) Step 7b. What will indicate whether the purpose or objective has been achieved? Step 8b. How will you verify purpose OVIs ? Purpose / objective assumptions Outputs (results) Step 7c. What will indicate that the outputs have been achieved? This indicators define terms of reference and the deliverables of the project. Step 8c. How will you verify output OVIs? Output assumptions. Activities (Inputs) Step 7d What project inputs and budget will be the main OVIs here. What inputs are needed to carryout the activities? Staff, transport, material, finance etc. Wetted by Step 8d. How will you verify activity OVIs. The project accounts will be a major MOV here. Activity and input assumption. Jc Lohith Shetty, Asst Professor, St Aloysius Critical conditions
  • 32. Steps in the formulation of a project • • • • Preparatory Phase Determine subject of analysis Determine Stakeholders involved Analysis Analysis of problems Analysis of objectives Cluster objectives Planning Scope the project Intervention logic Assumption Indicators and Means of verification Implementation Planning Strategies & Best Practices Cross cutting issues- Equity, Gender, Exit and Sustainability Institutional arrangements Organisation- Personnel, Infrastructure & Scheduling Monitoring & Evaluation Learning & Reinforcement Mechanisms Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 33. TEN STEPS OF LF PROCESS 1. Define PROJECT PURPOSE (MISSION) 2. Define the GOAL(VISION) 3. Define OUT PUT strategy for achieving PP 4. Define key ACTIVITIES for each output 5. Identify key ASSUMPTIONS 6. Verify VERTICAL LOGIC 7. Define objectively verifiable INDICATORS 8. Verify HORIZONTAL LOGIC 9. Decide on MEANS OF VERIFICATION 10. REVIEW Design Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 34. IV. Implementation Planning Strategies & Best Practices Cross cutting issues- Equity, Gender, Exit and Sustainability Institutional arrangements Organisation- Personnel, Infrastructure & Scheduling Monitoring & Evaluation Learning & Reinforcement Mechanisms Wetted by Jc Lohith Shetty, Asst Professor, St Aloysius
  • 35. The Project Manager’s Responsibilities: 1. Produce Outputs- A Management “Contract” • personal commitment 2. 3. 4. • Management tools, e.g., Log frame Scheduling Techniques, Influence, Persuasion, Coordination Monitor assumptions at all levels. Alert top management when: • Output achievement uncertain. • Outputs being produced on schedule but not likely to result in project purpose/goal achievement Recommend corrective actions.Lohith Shetty, Wetted by Jc Asst Professor, St Aloysius