Presented at ISA Summit - Stockholm, Sweden
March 19, 2009
Dean Nelson
Sr. Director, Global Lab & Datacenter Design Services (GDS)


                                                              1
Unique
Challenge

            2
Demand and Capacity Are Colliding...
...And Data Centers Are Right in The MIDDLE!
                                              800
               Watts per                    (8,600W m2)
                                                           Power
               Square Foot/Meter
   Demand
                                                          ●
 ●

                                                           Costs
   Users                                                  ●
 ●
                                                          ●Space
   Services
 ●

                                                          ●Heat
 ● Access




                                120
                    40        (1300W m2)
                  (430W m2)


                                             Next
                  2003        2005
                                           Generation

                                                                   3
Moore’s Law in Action


                                   zv


                     128 Threads, 16 Cores                  768 Cores, 28.5kW
64 Threads in 1997
     E10K                      5140                               6048
                                                                Full Rack 30x
                                                                          42
   1&½ Footprint                  Size
                                Power                  720W
    9620 Watts                                                  30 kWatts
                                                       each
                       (Systems at peak utilization)

     1,800 lbs.                Weight                           ~2200 lbs.
                                                       2x per
    ~150k tpm             Performance                           ~300k tpm
                                                        5140
                                                                                4
Reality: Heterogeneous Data Centers




  Industry Average is Between 4-6kw/cabinet; >20kw Skyscrapers will
         be Integrated; Must Deal with mixed load environment
                                                                      5
Why is this topic
 important?

                    6
Unprecedented Activity
• Sun Datacenter Briefings over 17 months (07/07-2/09)
   > >675 – an average of ~8 per week
   > California = >4,000 people representing >400 customer companies
     have engaged in briefings and toured Santa Clara, CA, India and
     UK datacenters in 15 months
   > Colorado = Almost 1,000 people in less than two months
   > Challenges: Power, cooling, space, connectivity and utility costs
   > Interest: Investment Protection, Future-Proofing, Efficiency
• Investments
   > 21 of these companies spending $19B in datacenter projects in the
     US alone
   > Does not include Microsoft, Google, Facebook or DRT


                                                                         7
A different perspective
 A single server is responsible for about the same amount of CO2 as a
 typical automobile driven for a year

       Usually
         on
        24x7



     Server                 Auto Travel                Air Travel
  440 Watt Server             Toyota Camry          Commercial Airliner
  3,942 kWh/year              15,000 m/year      Vancouver-Toronto (7 trips)
  5.3 Tonnes CO2            (24,000 km/year)          5.2 Tonnes CO2
                             5.3 Tonnes CO2



                                                                               8
A different perspective
A single server is responsible for about the same amount of CO2 as a typical automobile
driven for a year




                                                                  BUT
            Usually
              on
             24x7




                      =
                                                           Moore's Law Mandates
                                                             Efficiency Gains

                                                           Automotive Equivalent
                                                            Efficiency, 10 year
                                                                   period


                                                            163 MPG!
                                                                                          9
Changing Priorities & Drivers
• $15B investment ($1.2B solar project)
• First Carbon Neutral, Waste Free, Car-Free City

    Investment in
   solar innovation
    will change the
         industry




                      • At the end of a dock instead of the end of a street
                                                                              10
Floating Data Centers
•Tier1-Tier3 ECO datacenters at US and international ports
•Capacity: 4000 racks and over 350 SunMDs
•75MW of power, free cooling from ocean water
•Six months time to market, up to 40% less than traditional build




                             • At the end of a dock instead of the end of a street
                                                                                     11
Strategy
           12
A New Age




                        Information Age Participation Age
  Industrial Age
                         All Things Connected
    Global Production                           Unprecedented Contribution
                          Data Storm Building
   Global Consumption                           Unprecedented Consumption

                                                                             13
Top 20 Social Networks


                                 1.3 Billion Users
                                   and growing




Source: http://en.wikipedia.org/wiki/List_of_social_networking_websites (as of 11/10/2008)
                                                                                             14
The Shift
                   Internet Infrastructure
                High Performance Computing
   1m                                            IT = Weapon
                    Software as Services
                 Global Consumer Services
  100k                                                           UNDER
                                                                 SERVED
   10k
                                                                             Moore’s
    1k                                                                        Law

                                                                                   Core
  100                                                                            Enterprise
                                                                                   Apps
   10
                                                                  OVER
                                                                 SERVED
    1                                         IT = Cost

    .1
         1990         1995             2000               2005            2010

                                                                                              15
Innovate
           16
A moment of silence...

                   • Raised Floors Are Dead
                      > No longer required
                      > Go against physics
                      > Increasingly cumbersome
                      > Expensive
                   • Next Generation
                     equipment requires a new
                     way of thinking...



                                                  17
Pod Architecture
Modular Data Center Building Blocks
    Container and/or Brick & Mortar




                                      18
Modular Pod Components
 Physical Design
     Influenced by cooling, brick and mortar
 •

     and/or container

 Cooling – Closely Coupled
     In-row or overhead, not-aisle containment,
 •

     and passive

 Power Distribution
     Overhead or under-floor busway
 •




 Cabling
     Localize switching in each pod
 •




                                                  19
Cooling in Sun Modular Datacenter
    Integrated cooling modules
•


    Circular airflow, 5 cooling zones per module
•


    Variable-speed fans on a per-fan basis
•


    Handles densities up to 25 kW/rack
•




                                                   20
Sun Pod Architecture




                       21
Sun Pod Architecture




                       22
Closeup: Power Distribution
Modular overhead, hot-pluggable busway with conductors
to handle multiple voltages and phases
    Requires no floor
•

    space or cooling
        Transformers moved
    >

        outside the datacenter
    Snap-in cans with
•

    short whips
        Non-disruptive
    >


        Reduced copper
    >

        consumption
        No in-place abandonment
    >


        Significant time reduction – from months to minutes
    >


                                                              23
Closeup: Power Distribution
Modular overhead, hot-pluggable busway
with conductors to handle multiple
voltages and phases
    Supports multiple
•

    Tier levels
        Use multiple
    >

        busways
    Scalable by
•

    removing
    jumpers

                                         24
Act
      25
Design Services – Holistic Solution
                                 Global Lab and Datacenter
                                     Design Services


    Facilities                                                                    IT/Eng
                                             GDS

                                    Bridging the gap
                               Between Facilities and IT/Eng


• Central design competency center
• Understanding IT/Eng requirements, speak facilities’ language
• Design services provide holistic solution
• Aligned Business Organizations
   > http://www.sun.com/aboutsun/environment/docs/aligning_business_organizations.pdf
                                                                                           26
History: Sun’s Internal Challenge
• Facilities is Sun’s second largest expense
   > Real estate, utility, tax, and support costs
• 20+ years of organic growth
   > New products, reorgs, acquisitions
   > Lack of design standards and control of implementations for global
     technical infrastructure
   > Duplication and inefficiencies
• Multi-billion dollar IT/R&D technical infrastructure portfolio
   > 860k ft2 (80k m2) of Eng and IT space globally (reduced from 1.4M ft2 - 80k m2)
   > 1,068 individual rooms (reduced from 1,685)
   > IT space = 17% of the portfolio (143k ft2 / 13k m2 – 275 rooms)
   > Engineering/Services = 83% of the portfolio (718k ft2 / 67k m2 – 793 rooms)
                                                                                       27
Corporate Drive to Reduce Costs
• Spotlight: Santa Clara, CA - 2007
 > Shed 1.8M ft2 (167k m2) of real estate
 > Compress 202k ft2 (18.8k m2) of datacenters space into < 80k ft2 (7,400
    2
   m ) of new Datacenter space in Santa Clara
 > Project included every major business unit in Sun
 > 12 month project duration (complete by 06/30/2007)
• Approach
 > Phase I: Move 84k ft2 (7,800 m2) of datacenters into existing space
 > Phase II: Compress and build < 80k ft2 (7,400 m2) of next generation
   datacenter space in 12 months



                                                                             28
Spotlight: Hardware Replacement
                                      • 88% space compression
                                      • 61% utility reduction
                                      • $9M cost avoidance
                                      • 2.2MW to 500Kw
                                      • 450% compute increase
                                      • 550 racks to 65
                                      • 3,227 tons CO2 reduced
                                      • 312 cars off the road
                                      • Minimal downtime
                                      • Completed in 3 months
                                      • 2:1 Server, 3:1 Storage
                                      • 2,915 devices replaced


  Reality: ROI Sweet Spot = >4 to 1 Replacement Ratio
                                                                  29
Bring Out Your Dead...




                     30
Global Consolidation
                                              • $250M investment
                                              • 41% global datacenter
                                                space compression
                                                > 1.44M ft2 to 858k ft2
                                              • Scalable/Future Proof
                                                > 9MW to 21MW (CA)
                                                > 7MW to 10MW (CO)
                                              • Largest Liebert/APC
                                                installs
                                              • 15 Buildings to 2
                                              • 152 Datacenters to 14
                                              • $1.2M Utility Rebates
                                                $250k Innovation Award
   China, India, UK, Czech Republic, Norway
                                              • Enabled company pace
                                              • Reduced opex 30% (CA)


                                                                          31
Colorado DC Consolidation
                                              • Largest, most complex & costly
                                                 consolidation in Sun's history
                                               • 66% space compression
                                              •• 496k Datacenter compression
                                                 66% ft2 to 126k ft2
                                                        2         2
                                                   496k ft to 126k ft
                                                >
                                               • Scalable/Future Proof
                                              • Scalable/Future Proof
                                                  > 7MW to 10MW
                                                 > 7MW to 10MW
                                              •• First & Largest Liebert XD
                                                 First & Largest Liebert XD
                                               dynamic cooling install
                                                 dynamic cooling installs
                                              •• Water treatment saves 600k
                                               • gallons/year, eliminates chemicals
                                              •• Waterside economizer, free
                                                 cooling > 1/3 of year.
                                              •• Compressed 165k ft2 raised floor
                                               • to <700 ft2 ($4M Cost Avoidance)
                                              • Flywheel UPS, eliminates
                                                batteries.
                                              • Chillers 32% more efficient at avg
   China, India, UK, Czech Republic, Norway     load than ASHRAE std
                                              • 2 ACE Awards
                                              • Removed 1M kWh per month
                                              • Removed 5% of global carbon
                                                                                     32
Share
        33
Power Usage Effectiveness (PUE)
  SCA11-1500 Data Center Efficiency Benchmark
                                                                                                                                      SCA11-1500 Power Use
                                                            SCA11-1500 Software Datacenter PUE
                                                                      Load                              % of Total Load
                                                                                            kW
• 573 kW less support                                      IT Load                               798          78.02%

  power compared to                                        Chiller Plant                         126          12.28%

  industry PUE target (2)*                                 RC/CRAC Loads                           39         3.84%
                                                           UPS/Transformer Loss                    39         3.86%                                            IT Load
                                                           Lighting                                20         2.00%
• 36% More efficient than
                                                                                                                                                               Lighting

                                                           Total Load                           1023                                                           UPS/Transformer Loss


  the industry PUE target                                  Total Support Loads                   225                                                           RC/CRAC Loads

                                                                                                                                                               Chiller Plant
                                                           PUE                                  1.28
  and almost 50% better                                    DciE                                78%
  that industry PUE
  average (2.5)*                                                                                                                         Typical Data Center
                                                                           Target Datacenter PUE
                                                                                            kW
                                                                      Load                              % of Total Load*
• $400,000 Annual opex                                     IT Load                               798          50.00%


  savings compared to
                                                           Chiller Plant                         399          25.00%
                                                           RC/CRAC Loads                         192          12.00%

  typical data center                                      UPS/Transformer Loss                  160          10.00%

  ($0.08/kWh)                                              Lighting                                48         3.00%
                                                           Total Load                           1596                                                           IT Load
                                                           Total Support Loads                   798                                                           Lighting

                                                           PUE                                  2.00                                                           UPS/Transformer Loss

                                                                                                                                                               RC/CRAC Loads
                                                                                               50%
                                                           DciE
                                                                                                                                                               Chiller Plant



 * Industry average & target from uptime institute: http://www.datacenterknowledge.com/archives/2008/Jan/22/case_study_ups_green_data_center.html
                                                                                                                                                                               34
Best Practices = Competitive Weapon
• Align Facilities, IT & Engineering
  > Partnering nets significant short term & long term savings
    http://www.sun.com/aboutsun/environment/docs/aligning_business_organizations.pdf

• Hardware Replacement
  > Apply new hardware solutions and extend the life of your DC
    http://www.sun.com/aboutsun/environment/docs/creating_energy_efficient_dchw_consolidation.pdf

• Simplify Datacenter design with the POD concept
  > Power: Modular, Scalable, Smart                      http://www.sun.com/aboutsun/environment/docs/powering_energy_efficientdc.pdf

  > Cooling: Adaptable, Scalable, Smart                       http://www.sun.com/aboutsun/environment/docs/cooling_energy_effiicientdc.pdf

  > Cabling: Distributed vs Centralized                    http://www.sun.com/aboutsun/environment/docs/connecting_energy_efficientdc.pdf

  > Measurement: Power to control                     http://www.sun.com/aboutsun/environment/docs/accurately_measure_dcpower.pdf


• Data Center Tour Videos
    > California: http://www.sun.com/aboutsun/environment/media/datacenter_tour.xml
    > Colorado: http://www.sun.com/featured-articles/2009-0126/feature/index.jsp
                                                                                                                                             35
Sun Blueprints
• First Chapter - Modularity
  Released June 10, 2008
• Second Chapter - Electrical
  Released March 10, 2009
• Total of nine chapters to be
  released over the next 12
  months
• Download:
  http://sun.com/blueprints



                                 36
Participate &
 Contribute
                37
Hosted Chill Off
• Load: Up to 320, Sun V20z 1U servers
      > Selected legacy servers to create hostile environment (currently EOL)
      > Max load 10kW per rack




                                                   v



                                              Rittal LCP+
 APC InRow RC             Liebert XDV+                            IBM/Vette RDHX              Spraycool
                                              Contained Rack
InRow Architecture with      Overhead,                         Passive Heat Exchanger Door Chip Level Cooling
                                               Water based
 Thermal Containment      Refrigerant based                            Water based          Fluorinert based
     Water based
                                                                                                                38
Chill-Off Results
        less
      efficient




       more
      efficient




                    TREND




                            39
Chill-Off 2

      less
    efficient




     more
    efficient




                FILL PERFORMANCE CHART




                                         40
TEST PARTICIPANTS


Clustered Systems




TESTING SUPPORT




    REVIEWERS




      SPONSORS




                    41
Chill Off 2 Close Up...
Ultra-efficient no-fan, high-density
servers that plug into the pod
infrastructure


Breaking our own
warranty. We are
experimenting with this
type of configuration in
the chill off now...
                                       42
Data Center End User Community
      • 785 members, 481 Companies, 39 Countries,
        59 Industries              An exclusive group of global datacenter
                                              owners, operators and users
      • http://datacenterpulse.org     influencing the datacenter industry
                                                through the end user lens.




* Membership stats as of 9:05pm 03/18/2009.
                                                                             43
Open, Global, Focused
• Formed Sept/2008
• First Global Summit Held in CA, February 2008
   > Un-conference, topics defined and driven by members
   > In-person & On-line
   > Selected Topics: Top 10, Metrics, Certification, Cloud, Industry
     Alignment, Fanless Servers, Power
• Access
   > Website: http://www.datacenterpulse.org
            : http://www.youtube.com/user/datacenterpulse
   >
• Join the Group through
   > Owner/Operators http://www.linkedin.com/groups?gid=841187
   > Industry http://www.linkedin.com/groups?gid=1315947
                                                                        44
The Top 10 (Feb/2009)
 1) Align Industry Organizations
 2) Data Center Certification Standard
 3) Standard Data Center Stack
 4) Update or Dump Tier Levels
 5) More Products with Modularity
 6) Simple Top Level Efficiency Metric
 7) End to End IT/Facilities Measurement
 8) Standard Conductive Cooling Interface
 9) 480V/277V Power Supplies
 10) Independent Data Center Repository
                                            45
Draft: Standard Data Center Stack

 • Industry Alignment
 • add all




                                    46
Thank You

Dean Nelson
Sr. Director of Global Lab & Datacenter Design Services (GDS)
dean.nelson@sun.com
http://blogs.sun.com/geekism


                                                                47

More Related Content

Viewers also liked

Disrupting the Data Center: Unleashing the Digital Services Economy
Disrupting the Data Center: Unleashing the Digital Services EconomyDisrupting the Data Center: Unleashing the Digital Services Economy
Disrupting the Data Center: Unleashing the Digital Services EconomyIntel IT Center
 
Re-architecting the Datacenter to Deliver Better Experiences (Intel)
Re-architecting the Datacenter to Deliver Better Experiences (Intel)Re-architecting the Datacenter to Deliver Better Experiences (Intel)
Re-architecting the Datacenter to Deliver Better Experiences (Intel)COMPUTEX TAIPEI
 
Cloud Computing and the Datacenter of the Future
Cloud Computing and the Datacenter of the FutureCloud Computing and the Datacenter of the Future
Cloud Computing and the Datacenter of the FutureAppistry
 
Machine Learning + Analytics
Machine Learning + AnalyticsMachine Learning + Analytics
Machine Learning + AnalyticsSplunk
 
Topic 15: Datacenter Design and Networking
Topic 15: Datacenter Design and NetworkingTopic 15: Datacenter Design and Networking
Topic 15: Datacenter Design and NetworkingZubair Nabi
 
MachineLearning.ppt
MachineLearning.pptMachineLearning.ppt
MachineLearning.pptbutest
 
Introduction to Machine Learning
Introduction to Machine LearningIntroduction to Machine Learning
Introduction to Machine LearningLior Rokach
 

Viewers also liked (8)

Disrupting the Data Center: Unleashing the Digital Services Economy
Disrupting the Data Center: Unleashing the Digital Services EconomyDisrupting the Data Center: Unleashing the Digital Services Economy
Disrupting the Data Center: Unleashing the Digital Services Economy
 
Re-architecting the Datacenter to Deliver Better Experiences (Intel)
Re-architecting the Datacenter to Deliver Better Experiences (Intel)Re-architecting the Datacenter to Deliver Better Experiences (Intel)
Re-architecting the Datacenter to Deliver Better Experiences (Intel)
 
Cloud Computing and the Datacenter of the Future
Cloud Computing and the Datacenter of the FutureCloud Computing and the Datacenter of the Future
Cloud Computing and the Datacenter of the Future
 
Machine Learning + Analytics
Machine Learning + AnalyticsMachine Learning + Analytics
Machine Learning + Analytics
 
Topic 15: Datacenter Design and Networking
Topic 15: Datacenter Design and NetworkingTopic 15: Datacenter Design and Networking
Topic 15: Datacenter Design and Networking
 
MachineLearning.ppt
MachineLearning.pptMachineLearning.ppt
MachineLearning.ppt
 
Machine Learning for Dummies
Machine Learning for DummiesMachine Learning for Dummies
Machine Learning for Dummies
 
Introduction to Machine Learning
Introduction to Machine LearningIntroduction to Machine Learning
Introduction to Machine Learning
 

Similar to Datacenter Revolution Dean Nelson, Sun

Sun sparc enterprise t5140 and t5240 servers customer presentation
Sun sparc enterprise t5140 and t5240 servers customer presentationSun sparc enterprise t5140 and t5240 servers customer presentation
Sun sparc enterprise t5140 and t5240 servers customer presentationxKinAnx
 
High Performance Computing - Challenges on the Road to Exascale Computing
High Performance Computing - Challenges on the Road to Exascale ComputingHigh Performance Computing - Challenges on the Road to Exascale Computing
High Performance Computing - Challenges on the Road to Exascale ComputingHeiko Joerg Schick
 
Unwiring the Planet:: Wireless Communications & Climate Change
Unwiring the Planet:: Wireless Communications & Climate ChangeUnwiring the Planet:: Wireless Communications & Climate Change
Unwiring the Planet:: Wireless Communications & Climate Change3GDR
 
invited speech at Ge2013, Udine 2013
invited speech at Ge2013, Udine 2013 invited speech at Ge2013, Udine 2013
invited speech at Ge2013, Udine 2013 Roberto Siagri
 
Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07Michael P Totten
 
Dirk van der Woude - Amsterdam and FttH: some preconditions to a greener city
Dirk van der Woude - Amsterdam and FttH: some preconditions to a greener cityDirk van der Woude - Amsterdam and FttH: some preconditions to a greener city
Dirk van der Woude - Amsterdam and FttH: some preconditions to a greener cityShane Mitchell
 
Cryptographic Data Splitting and Cloud Computing
Cryptographic Data Splitting and Cloud ComputingCryptographic Data Splitting and Cloud Computing
Cryptographic Data Splitting and Cloud ComputingGovCloud Network
 
The Growing Interdependence of the Internet and Climate Change
The Growing Interdependence of the Internet and Climate ChangeThe Growing Interdependence of the Internet and Climate Change
The Growing Interdependence of the Internet and Climate ChangeLarry Smarr
 
Sustainable IT?
Sustainable IT?Sustainable IT?
Sustainable IT?Cisco
 
Evento Startup Essential Barcelona
Evento Startup Essential BarcelonaEvento Startup Essential Barcelona
Evento Startup Essential BarcelonaManuel Jaffrin
 
Green Commputing - Paradigm Shift in Computing Technology, ICT & its Applicat...
Green Commputing - Paradigm Shift in Computing Technology, ICT & its Applicat...Green Commputing - Paradigm Shift in Computing Technology, ICT & its Applicat...
Green Commputing - Paradigm Shift in Computing Technology, ICT & its Applicat...Dr. Sunil Kr. Pandey
 
CTC Global's ACCC conductor reduces CO2 emissions
CTC Global's ACCC conductor reduces CO2 emissionsCTC Global's ACCC conductor reduces CO2 emissions
CTC Global's ACCC conductor reduces CO2 emissionsDave Bryant
 
Sun sparc enterprise t5440 server customer presentation
Sun sparc enterprise t5440 server customer presentationSun sparc enterprise t5440 server customer presentation
Sun sparc enterprise t5440 server customer presentationxKinAnx
 
Best Practices for Achieving Return on Investment through Energy Efficient Co...
Best Practices for Achieving Return on Investment through Energy Efficient Co...Best Practices for Achieving Return on Investment through Energy Efficient Co...
Best Practices for Achieving Return on Investment through Energy Efficient Co...Climate Savers Computing Initiative
 
ICT and sustainable Cities
ICT and sustainable CitiesICT and sustainable Cities
ICT and sustainable CitiesACIDD
 

Similar to Datacenter Revolution Dean Nelson, Sun (20)

10 fn s34
10 fn s3410 fn s34
10 fn s34
 
10 fn s34
10 fn s3410 fn s34
10 fn s34
 
Sun sparc enterprise t5140 and t5240 servers customer presentation
Sun sparc enterprise t5140 and t5240 servers customer presentationSun sparc enterprise t5140 and t5240 servers customer presentation
Sun sparc enterprise t5140 and t5240 servers customer presentation
 
High Performance Computing - Challenges on the Road to Exascale Computing
High Performance Computing - Challenges on the Road to Exascale ComputingHigh Performance Computing - Challenges on the Road to Exascale Computing
High Performance Computing - Challenges on the Road to Exascale Computing
 
Unwiring the Planet:: Wireless Communications & Climate Change
Unwiring the Planet:: Wireless Communications & Climate ChangeUnwiring the Planet:: Wireless Communications & Climate Change
Unwiring the Planet:: Wireless Communications & Climate Change
 
invited speech at Ge2013, Udine 2013
invited speech at Ge2013, Udine 2013 invited speech at Ge2013, Udine 2013
invited speech at Ge2013, Udine 2013
 
Greencomputing by nadeemsarshar
Greencomputing by nadeemsarsharGreencomputing by nadeemsarshar
Greencomputing by nadeemsarshar
 
Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07
 
Dirk van der Woude - Amsterdam and FttH: some preconditions to a greener city
Dirk van der Woude - Amsterdam and FttH: some preconditions to a greener cityDirk van der Woude - Amsterdam and FttH: some preconditions to a greener city
Dirk van der Woude - Amsterdam and FttH: some preconditions to a greener city
 
SuperGreenComputing
SuperGreenComputingSuperGreenComputing
SuperGreenComputing
 
Cryptographic Data Splitting and Cloud Computing
Cryptographic Data Splitting and Cloud ComputingCryptographic Data Splitting and Cloud Computing
Cryptographic Data Splitting and Cloud Computing
 
The Growing Interdependence of the Internet and Climate Change
The Growing Interdependence of the Internet and Climate ChangeThe Growing Interdependence of the Internet and Climate Change
The Growing Interdependence of the Internet and Climate Change
 
Sustainable IT?
Sustainable IT?Sustainable IT?
Sustainable IT?
 
EcoStruxure
EcoStruxure EcoStruxure
EcoStruxure
 
Evento Startup Essential Barcelona
Evento Startup Essential BarcelonaEvento Startup Essential Barcelona
Evento Startup Essential Barcelona
 
Green Commputing - Paradigm Shift in Computing Technology, ICT & its Applicat...
Green Commputing - Paradigm Shift in Computing Technology, ICT & its Applicat...Green Commputing - Paradigm Shift in Computing Technology, ICT & its Applicat...
Green Commputing - Paradigm Shift in Computing Technology, ICT & its Applicat...
 
CTC Global's ACCC conductor reduces CO2 emissions
CTC Global's ACCC conductor reduces CO2 emissionsCTC Global's ACCC conductor reduces CO2 emissions
CTC Global's ACCC conductor reduces CO2 emissions
 
Sun sparc enterprise t5440 server customer presentation
Sun sparc enterprise t5440 server customer presentationSun sparc enterprise t5440 server customer presentation
Sun sparc enterprise t5440 server customer presentation
 
Best Practices for Achieving Return on Investment through Energy Efficient Co...
Best Practices for Achieving Return on Investment through Energy Efficient Co...Best Practices for Achieving Return on Investment through Energy Efficient Co...
Best Practices for Achieving Return on Investment through Energy Efficient Co...
 
ICT and sustainable Cities
ICT and sustainable CitiesICT and sustainable Cities
ICT and sustainable Cities
 

More from Niklas Johnsson

District Cooling Jenny Dahlberg, Fortum
District Cooling   Jenny Dahlberg, FortumDistrict Cooling   Jenny Dahlberg, Fortum
District Cooling Jenny Dahlberg, FortumNiklas Johnsson
 
Data Center Efficiency Martijn Loderus, Sun
Data  Center  Efficiency    Martijn  Loderus,  SunData  Center  Efficiency    Martijn  Loderus,  Sun
Data Center Efficiency Martijn Loderus, SunNiklas Johnsson
 
Nordic Connectivity Daniel Sjöberg, Telia Sonera I C
Nordic  Connectivity    Daniel  Sjöberg,  Telia Sonera I CNordic  Connectivity    Daniel  Sjöberg,  Telia Sonera I C
Nordic Connectivity Daniel Sjöberg, Telia Sonera I CNiklas Johnsson
 
Sweden Datacenters Tomas Sokolnicki, I S A
Sweden    Datacenters    Tomas  Sokolnicki,  I S ASweden    Datacenters    Tomas  Sokolnicki,  I S A
Sweden Datacenters Tomas Sokolnicki, I S ANiklas Johnsson
 
Malmberg Water Peter Bäckström
Malmberg  Water    Peter  BäckströmMalmberg  Water    Peter  Bäckström
Malmberg Water Peter BäckströmNiklas Johnsson
 
Mobile Innovation Companies Sweden Show
Mobile Innovation Companies Sweden ShowMobile Innovation Companies Sweden Show
Mobile Innovation Companies Sweden ShowNiklas Johnsson
 

More from Niklas Johnsson (6)

District Cooling Jenny Dahlberg, Fortum
District Cooling   Jenny Dahlberg, FortumDistrict Cooling   Jenny Dahlberg, Fortum
District Cooling Jenny Dahlberg, Fortum
 
Data Center Efficiency Martijn Loderus, Sun
Data  Center  Efficiency    Martijn  Loderus,  SunData  Center  Efficiency    Martijn  Loderus,  Sun
Data Center Efficiency Martijn Loderus, Sun
 
Nordic Connectivity Daniel Sjöberg, Telia Sonera I C
Nordic  Connectivity    Daniel  Sjöberg,  Telia Sonera I CNordic  Connectivity    Daniel  Sjöberg,  Telia Sonera I C
Nordic Connectivity Daniel Sjöberg, Telia Sonera I C
 
Sweden Datacenters Tomas Sokolnicki, I S A
Sweden    Datacenters    Tomas  Sokolnicki,  I S ASweden    Datacenters    Tomas  Sokolnicki,  I S A
Sweden Datacenters Tomas Sokolnicki, I S A
 
Malmberg Water Peter Bäckström
Malmberg  Water    Peter  BäckströmMalmberg  Water    Peter  Bäckström
Malmberg Water Peter Bäckström
 
Mobile Innovation Companies Sweden Show
Mobile Innovation Companies Sweden ShowMobile Innovation Companies Sweden Show
Mobile Innovation Companies Sweden Show
 

Recently uploaded

TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 

Recently uploaded (20)

TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 

Datacenter Revolution Dean Nelson, Sun

  • 1. Presented at ISA Summit - Stockholm, Sweden March 19, 2009 Dean Nelson Sr. Director, Global Lab & Datacenter Design Services (GDS) 1
  • 3. Demand and Capacity Are Colliding... ...And Data Centers Are Right in The MIDDLE! 800 Watts per (8,600W m2) Power Square Foot/Meter Demand ● ● Costs Users ● ● ●Space Services ● ●Heat ● Access 120 40 (1300W m2) (430W m2) Next 2003 2005 Generation 3
  • 4. Moore’s Law in Action zv 128 Threads, 16 Cores 768 Cores, 28.5kW 64 Threads in 1997 E10K 5140 6048 Full Rack 30x 42 1&½ Footprint Size Power 720W 9620 Watts 30 kWatts each (Systems at peak utilization) 1,800 lbs. Weight ~2200 lbs. 2x per ~150k tpm Performance ~300k tpm 5140 4
  • 5. Reality: Heterogeneous Data Centers Industry Average is Between 4-6kw/cabinet; >20kw Skyscrapers will be Integrated; Must Deal with mixed load environment 5
  • 6. Why is this topic important? 6
  • 7. Unprecedented Activity • Sun Datacenter Briefings over 17 months (07/07-2/09) > >675 – an average of ~8 per week > California = >4,000 people representing >400 customer companies have engaged in briefings and toured Santa Clara, CA, India and UK datacenters in 15 months > Colorado = Almost 1,000 people in less than two months > Challenges: Power, cooling, space, connectivity and utility costs > Interest: Investment Protection, Future-Proofing, Efficiency • Investments > 21 of these companies spending $19B in datacenter projects in the US alone > Does not include Microsoft, Google, Facebook or DRT 7
  • 8. A different perspective A single server is responsible for about the same amount of CO2 as a typical automobile driven for a year Usually on 24x7 Server Auto Travel Air Travel 440 Watt Server Toyota Camry Commercial Airliner 3,942 kWh/year 15,000 m/year Vancouver-Toronto (7 trips) 5.3 Tonnes CO2 (24,000 km/year) 5.2 Tonnes CO2 5.3 Tonnes CO2 8
  • 9. A different perspective A single server is responsible for about the same amount of CO2 as a typical automobile driven for a year BUT Usually on 24x7 = Moore's Law Mandates Efficiency Gains Automotive Equivalent Efficiency, 10 year period 163 MPG! 9
  • 10. Changing Priorities & Drivers • $15B investment ($1.2B solar project) • First Carbon Neutral, Waste Free, Car-Free City Investment in solar innovation will change the industry • At the end of a dock instead of the end of a street 10
  • 11. Floating Data Centers •Tier1-Tier3 ECO datacenters at US and international ports •Capacity: 4000 racks and over 350 SunMDs •75MW of power, free cooling from ocean water •Six months time to market, up to 40% less than traditional build • At the end of a dock instead of the end of a street 11
  • 12. Strategy 12
  • 13. A New Age Information Age Participation Age Industrial Age All Things Connected Global Production Unprecedented Contribution Data Storm Building Global Consumption Unprecedented Consumption 13
  • 14. Top 20 Social Networks 1.3 Billion Users and growing Source: http://en.wikipedia.org/wiki/List_of_social_networking_websites (as of 11/10/2008) 14
  • 15. The Shift Internet Infrastructure High Performance Computing 1m IT = Weapon Software as Services Global Consumer Services 100k UNDER SERVED 10k Moore’s 1k Law Core 100 Enterprise Apps 10 OVER SERVED 1 IT = Cost .1 1990 1995 2000 2005 2010 15
  • 16. Innovate 16
  • 17. A moment of silence... • Raised Floors Are Dead > No longer required > Go against physics > Increasingly cumbersome > Expensive • Next Generation equipment requires a new way of thinking... 17
  • 18. Pod Architecture Modular Data Center Building Blocks Container and/or Brick & Mortar 18
  • 19. Modular Pod Components Physical Design Influenced by cooling, brick and mortar • and/or container Cooling – Closely Coupled In-row or overhead, not-aisle containment, • and passive Power Distribution Overhead or under-floor busway • Cabling Localize switching in each pod • 19
  • 20. Cooling in Sun Modular Datacenter Integrated cooling modules • Circular airflow, 5 cooling zones per module • Variable-speed fans on a per-fan basis • Handles densities up to 25 kW/rack • 20
  • 23. Closeup: Power Distribution Modular overhead, hot-pluggable busway with conductors to handle multiple voltages and phases Requires no floor • space or cooling Transformers moved > outside the datacenter Snap-in cans with • short whips Non-disruptive > Reduced copper > consumption No in-place abandonment > Significant time reduction – from months to minutes > 23
  • 24. Closeup: Power Distribution Modular overhead, hot-pluggable busway with conductors to handle multiple voltages and phases Supports multiple • Tier levels Use multiple > busways Scalable by • removing jumpers 24
  • 25. Act 25
  • 26. Design Services – Holistic Solution Global Lab and Datacenter Design Services Facilities IT/Eng GDS Bridging the gap Between Facilities and IT/Eng • Central design competency center • Understanding IT/Eng requirements, speak facilities’ language • Design services provide holistic solution • Aligned Business Organizations > http://www.sun.com/aboutsun/environment/docs/aligning_business_organizations.pdf 26
  • 27. History: Sun’s Internal Challenge • Facilities is Sun’s second largest expense > Real estate, utility, tax, and support costs • 20+ years of organic growth > New products, reorgs, acquisitions > Lack of design standards and control of implementations for global technical infrastructure > Duplication and inefficiencies • Multi-billion dollar IT/R&D technical infrastructure portfolio > 860k ft2 (80k m2) of Eng and IT space globally (reduced from 1.4M ft2 - 80k m2) > 1,068 individual rooms (reduced from 1,685) > IT space = 17% of the portfolio (143k ft2 / 13k m2 – 275 rooms) > Engineering/Services = 83% of the portfolio (718k ft2 / 67k m2 – 793 rooms) 27
  • 28. Corporate Drive to Reduce Costs • Spotlight: Santa Clara, CA - 2007 > Shed 1.8M ft2 (167k m2) of real estate > Compress 202k ft2 (18.8k m2) of datacenters space into < 80k ft2 (7,400 2 m ) of new Datacenter space in Santa Clara > Project included every major business unit in Sun > 12 month project duration (complete by 06/30/2007) • Approach > Phase I: Move 84k ft2 (7,800 m2) of datacenters into existing space > Phase II: Compress and build < 80k ft2 (7,400 m2) of next generation datacenter space in 12 months 28
  • 29. Spotlight: Hardware Replacement • 88% space compression • 61% utility reduction • $9M cost avoidance • 2.2MW to 500Kw • 450% compute increase • 550 racks to 65 • 3,227 tons CO2 reduced • 312 cars off the road • Minimal downtime • Completed in 3 months • 2:1 Server, 3:1 Storage • 2,915 devices replaced Reality: ROI Sweet Spot = >4 to 1 Replacement Ratio 29
  • 30. Bring Out Your Dead... 30
  • 31. Global Consolidation • $250M investment • 41% global datacenter space compression > 1.44M ft2 to 858k ft2 • Scalable/Future Proof > 9MW to 21MW (CA) > 7MW to 10MW (CO) • Largest Liebert/APC installs • 15 Buildings to 2 • 152 Datacenters to 14 • $1.2M Utility Rebates $250k Innovation Award China, India, UK, Czech Republic, Norway • Enabled company pace • Reduced opex 30% (CA) 31
  • 32. Colorado DC Consolidation • Largest, most complex & costly consolidation in Sun's history • 66% space compression •• 496k Datacenter compression 66% ft2 to 126k ft2 2 2 496k ft to 126k ft > • Scalable/Future Proof • Scalable/Future Proof > 7MW to 10MW > 7MW to 10MW •• First & Largest Liebert XD First & Largest Liebert XD dynamic cooling install dynamic cooling installs •• Water treatment saves 600k • gallons/year, eliminates chemicals •• Waterside economizer, free cooling > 1/3 of year. •• Compressed 165k ft2 raised floor • to <700 ft2 ($4M Cost Avoidance) • Flywheel UPS, eliminates batteries. • Chillers 32% more efficient at avg China, India, UK, Czech Republic, Norway load than ASHRAE std • 2 ACE Awards • Removed 1M kWh per month • Removed 5% of global carbon 32
  • 33. Share 33
  • 34. Power Usage Effectiveness (PUE) SCA11-1500 Data Center Efficiency Benchmark SCA11-1500 Power Use SCA11-1500 Software Datacenter PUE Load % of Total Load kW • 573 kW less support IT Load 798 78.02% power compared to Chiller Plant 126 12.28% industry PUE target (2)* RC/CRAC Loads 39 3.84% UPS/Transformer Loss 39 3.86% IT Load Lighting 20 2.00% • 36% More efficient than Lighting Total Load 1023 UPS/Transformer Loss the industry PUE target Total Support Loads 225 RC/CRAC Loads Chiller Plant PUE 1.28 and almost 50% better DciE 78% that industry PUE average (2.5)* Typical Data Center Target Datacenter PUE kW Load % of Total Load* • $400,000 Annual opex IT Load 798 50.00% savings compared to Chiller Plant 399 25.00% RC/CRAC Loads 192 12.00% typical data center UPS/Transformer Loss 160 10.00% ($0.08/kWh) Lighting 48 3.00% Total Load 1596 IT Load Total Support Loads 798 Lighting PUE 2.00 UPS/Transformer Loss RC/CRAC Loads 50% DciE Chiller Plant * Industry average & target from uptime institute: http://www.datacenterknowledge.com/archives/2008/Jan/22/case_study_ups_green_data_center.html 34
  • 35. Best Practices = Competitive Weapon • Align Facilities, IT & Engineering > Partnering nets significant short term & long term savings http://www.sun.com/aboutsun/environment/docs/aligning_business_organizations.pdf • Hardware Replacement > Apply new hardware solutions and extend the life of your DC http://www.sun.com/aboutsun/environment/docs/creating_energy_efficient_dchw_consolidation.pdf • Simplify Datacenter design with the POD concept > Power: Modular, Scalable, Smart http://www.sun.com/aboutsun/environment/docs/powering_energy_efficientdc.pdf > Cooling: Adaptable, Scalable, Smart http://www.sun.com/aboutsun/environment/docs/cooling_energy_effiicientdc.pdf > Cabling: Distributed vs Centralized http://www.sun.com/aboutsun/environment/docs/connecting_energy_efficientdc.pdf > Measurement: Power to control http://www.sun.com/aboutsun/environment/docs/accurately_measure_dcpower.pdf • Data Center Tour Videos > California: http://www.sun.com/aboutsun/environment/media/datacenter_tour.xml > Colorado: http://www.sun.com/featured-articles/2009-0126/feature/index.jsp 35
  • 36. Sun Blueprints • First Chapter - Modularity Released June 10, 2008 • Second Chapter - Electrical Released March 10, 2009 • Total of nine chapters to be released over the next 12 months • Download: http://sun.com/blueprints 36
  • 38. Hosted Chill Off • Load: Up to 320, Sun V20z 1U servers > Selected legacy servers to create hostile environment (currently EOL) > Max load 10kW per rack v Rittal LCP+ APC InRow RC Liebert XDV+ IBM/Vette RDHX Spraycool Contained Rack InRow Architecture with Overhead, Passive Heat Exchanger Door Chip Level Cooling Water based Thermal Containment Refrigerant based Water based Fluorinert based Water based 38
  • 39. Chill-Off Results less efficient more efficient TREND 39
  • 40. Chill-Off 2 less efficient more efficient FILL PERFORMANCE CHART 40
  • 41. TEST PARTICIPANTS Clustered Systems TESTING SUPPORT REVIEWERS SPONSORS 41
  • 42. Chill Off 2 Close Up... Ultra-efficient no-fan, high-density servers that plug into the pod infrastructure Breaking our own warranty. We are experimenting with this type of configuration in the chill off now... 42
  • 43. Data Center End User Community • 785 members, 481 Companies, 39 Countries, 59 Industries An exclusive group of global datacenter owners, operators and users • http://datacenterpulse.org influencing the datacenter industry through the end user lens. * Membership stats as of 9:05pm 03/18/2009. 43
  • 44. Open, Global, Focused • Formed Sept/2008 • First Global Summit Held in CA, February 2008 > Un-conference, topics defined and driven by members > In-person & On-line > Selected Topics: Top 10, Metrics, Certification, Cloud, Industry Alignment, Fanless Servers, Power • Access > Website: http://www.datacenterpulse.org : http://www.youtube.com/user/datacenterpulse > • Join the Group through > Owner/Operators http://www.linkedin.com/groups?gid=841187 > Industry http://www.linkedin.com/groups?gid=1315947 44
  • 45. The Top 10 (Feb/2009) 1) Align Industry Organizations 2) Data Center Certification Standard 3) Standard Data Center Stack 4) Update or Dump Tier Levels 5) More Products with Modularity 6) Simple Top Level Efficiency Metric 7) End to End IT/Facilities Measurement 8) Standard Conductive Cooling Interface 9) 480V/277V Power Supplies 10) Independent Data Center Repository 45
  • 46. Draft: Standard Data Center Stack • Industry Alignment • add all 46
  • 47. Thank You Dean Nelson Sr. Director of Global Lab & Datacenter Design Services (GDS) dean.nelson@sun.com http://blogs.sun.com/geekism 47