SlideShare uma empresa Scribd logo
1 de 65
Baixar para ler offline
Digital Engineering a Lunar Rover
Demonstration of Innoslate’s Digital Thread
1
October 19th, 2021, Dr. Steven H. Dam
Ask Us Your Questions
• Ask us your questions using the panel
on the right
• This presentation is being recorded and
will be made available to you.
• Contact us after the webinar through
o support@Innoslate.com
o Call 571.485.7800
o LinkedIn Innoslate User Group
o Twitter
Meet Your Host
• President and Founder of SPEC Innovations
• Participated in the development of C4ISR and
the DoDAF
• Expert Systems Engineering Professionals
Certificate
• steven.dam@specinnovations.com
• @stevenhdam
Special Thanks To
4
Michael Campbell
Mallory Jones
Michael Jordan
Lilleigh Stevie
Andy Tapia
SPEC Innovations Background
NASA’s Break the Ice Challenge
Innoslate’s Digital Thread
Project Initiation
Task One – Research and Design Lunar Rover Prototype
Task Two – Build Lunar Rover Prototype
Task Three – Task Three - Test Lunar Rover Prototype
Task Four – Task Four - Demonstrate Digital Thread
5
Agenda
SPEC Innovations Background
Developed MBSE tool Innoslate, supports the entire Systems
Engineering Lifecycle
Software release v4.5 revealed more features to support a modern
digital thread experience within the MBSE tool
Interested in NASA’s Break the Ice Challenge to demonstrate
Innoslate’s Digital Thread
Goal: to produce a lunar rover prototype system using a complete
digital thread
Scope: system boundary to remain within the physical limitations of
the lunar rover prototype
6
Competition hosted by NASA
Solutions sought for:
Excavating regolith
Maximizing water delivered
Minimizing mass of equipment
Minimizing power consumption
Goal: Extract 10,000 kg of water from regolith in 365 days
7
Break the Ice Challenge
Excavate icy regolith at Excavation Site
Extract water from icy regolith using the NASA Water
Extraction Plant
Deliver water to Delivery Site
Performance parameters and environmental
constraints also provided by NASA
8
Mission Requirements
Used to step through the lunar rover prototype
lifecycle in Innoslate’s Digital Thread
9
Stepping Through the Lifecycle
Project Initiation
Used Documents, Diagrams, and Project
Management Views to initiate the Lunar Rover
Project
10
Defines the project’s:
Scope,
Schedule,
Budget, and
Technical execution
11
Documents View
PMP Document:
Lunar Rover PMP
Project Management Plan
Statement of Work
SOW created in an Action
diagram to define the
technical work
Tasks include:
Research & Development
Build
Test
Demonstrate
Challenge Deliverables
12
Diagrams View
Action Diagram:
Lunar Rover SOW
Auto-generated by opening a Timeline diagram or Gantt
chart from the SOW Action diagram
13
Timeline Diagram:
Lunar Rover SOW Diagrams View
Gantt Chart:
Lunar Rover SOW
Charts View
Schedule
Used to keep track of the status of each Task
14
Project
Management View
Kanban Board:
Lunar Rover
SOW
Kanban Board
Task One: Research & Design
Focuses on Architecture Development and Design phases
using Innoslate’s Documents, Diagrams, and Modeling &
Simulation
15
Sub-Tasks:
Research
Design
Incorporate Innoslate’s
Digital Thread
Produced documents:
Requirements, BOM, and
Final Report
16
Task One SOW
Diagrams View
Action Diagram:
Lunar Rover SOW
System Architecture Research
Investigated Break the Ice Challenge Rules
documentation to extract information:
Terms and definitions
Technical Constraints
Environmental Conditions
Mission Requirements
Technical Goals
Supporting Assets and Equipment
17
“As-Is” System Architecture:
Ground communication
Lunar Lander
Excavation Site
Delivery Site
NASA Water Extraction Plant
NASA Power Plant
18
Diagrams View
Asset Diagram:
System Architecture
Design – Context Analysis
Action diagram visualizes the Mission Scenario –
Includes all Actions the rover will perform on the surface
of the Moon
19
Action Diagram:
Mission Scenario Diagrams View
Mission Scenario
Created a Functional
Requirements checklist to
compare each prototype
design
Evaluated designs by
totality of functional
requirements met
20
Notes Document:
Prototype Options
Documents View
Existing Prototype Design Comparison
An Analytical Hierarchy Process (AHP) was conducted to
create weighting criteria for scoring and selecting a prototype
design option
Each prototype design was given a score using the weights
21
Criteria Weights Table
Design Options Score Table
Design Analysis
LEO Rover prototype selected with
the highest AHP score and the most
functional requirements met (27/47)
Ensures all parts have been acquired
Asset diagram created to track the
purchase details of items in the BOM –
Tracking numbers, order numbers,
shipping time estimates, serial numbers,
SKU numbers
Trace these entities to see their data
on Dashboards and in reports
Combine with user guides, SOP's
and more to develop a digital library of
all architecture assets
22
Documents View
Notes Document:
Bill of Materials
Bill of Materials
LEO Rover doesn’t meet all the
functional requirements
Additional equipment purchased:
3-D Printer for excavator claw,
materials storage unit, tire fenders
Robotic arm for excavating regolith
LiDAR sensor for navigation
LED lights for improving visuals
23
LiDAR
LEDs
3D Printer
Additional Equipment
Updated CBS previously created to record the costs of the
rover and its hardware components
Costs were rolled up within Database view to estimate the
total cost of the lunar rover’s hardware
24
Diagrams View
Hierarchy Chart:
CBS Entity View
Cost Acquisition
Used Ansys CAD tool
(SpaceClaim) to modify
LEO Rover design
Created 3-D Prints from
SpaceClaim for key
additional components
(Task 2)
Used Innoslate’s CAD
Viewer to store designs of
the final lunar rover
prototype
25
CAD Viewer
CAD Viewer:
Final Prototype Design
Final Prototype Design
“To-Be” System Architecture:
Ground communication
Lunar Lander
Excavation Site
Delivery Site
NASA Water Extraction Plant
NASA Power Plant
Lunar Rover
26
Diagrams View
Asset Diagram:
System Architecture * Connects the entire system
Final System Architecture
Using site locations and
distances specified by the
challenge, a travel route was
mapped for the rover
Distances scaled down to
the prototype’s size for travel
time calculation in Task
Three
27
* See Appendix for scale calculations
Rover Route
Models the excavation process the rover completes
each time it navigates to the Excavation Site
Running the simulator calculates the amount of regolith
the rover can excavate per excavation cycle
28
Action Diagram:
Excavation Scenario
Diagrams View
Excavation Scenario is one portion of the
Mission Scenario, previously described
Excavation Scenario
Focuses on Hardware and Software Acquisition
Phase using Innoslate’s Modeling & Simulation and
design engineering tools Ansys, STK, MatLab, and
GitHub
29
Task Two: Build
Sub-Tasks:
Build 3-D Printer and Print
Additional Equipment
Assemble Lunar Rover
Prototype
Incorporate Innoslate’s
Digital Thread
Produced SPECTER
prototype and Final Report
30
Task Two SOW
Diagrams View
Action Diagram:
Lunar Rover SOW
Creality Ender 3-D Printer was purchased to 3-D print
additional materials identified in Task One
Confirmed the 3-D printer was functioning properly through a
print test
31
Build & Test 3-D Printer
Successful Print Test
Equipment:
Creality Ender
3-D Printer
Additional equipment
printed for prototype:
Excavator Claw
Storage Unit
Tire Fenders
32
Printed Components
Equipment:
Excavator Claw,
Storage Unit, &
Tire Fenders
Assembled with the
servo motor and
Raspberry Pi
Mounted 3-D printer
Excavator Claw to the
Robotic Arm’s
grabbers
33
Build Robotic Arm
Equipment:
Excavator System
LEO Rover prototype was assembled upon delivery
LEO’s Raspberry Pi was also configured to be controlled from
a SPEC laptop
34
LEO Rover Prototype
Equipment:
LEO Rover Prototype
All of the components were
then assembled together to
create SPEC Innovation’s
SPECTER
Space Prospect Exploration
Convoy Transporting &
Evaluating Regolith
35
SPECTER
Equipment:
SPECTER
GitHub repository created for interfacing with SPECTER
Firmware allows messages to be sent to the equipment
components for performing functions
Messages also in return sent back and displayed to user:
Ambient temperature recording
Distance obstacles are from front and rear of rover body
Obstacle collision warning if rover body approaches too closely
36
SPECTER User Interface
Use a token to access GitHub
via Innoslate
View all the project’s
repositories on the GitHub
Dashboard
Issue created for each
message
SPEC’s software team then
added the code and published
the updates for SPECTER’s UI
37
GitHub Repositories
GitHub Access
via Innoslate
Innoslate Repositories:
SPECTER UI and
Firmware
GitHub Issue
Displayed to user:
Distance obstacles are
from front and rear of rover
body
Obstacle collision warning
if rover body approaches too
closely
Current voltage output
38
SPECTER UI Cont’d
SPECTER UI:
SPECTER Camera
View and Control
SPECTER
AGI’s Systems Tool Kit (STK) used to model the rover’s travel route
on the lunar surface in order to calculate time to reach the mission’s
goal of 10,000 kg of collected water
Assumptions made during model development:
Same route followed by rover for every regolith excavation and delivery
Rover has excavation rate of 100 kg of regolith per hour
Rover has carrying capacity of 100 kg
Rover can complete 10 excavation cycles before recharging battery
One full charge is 4 hours
Unloading regolith requires 15 minutes, and loading water requires 1 hour
39
Rover Route Analysis
Built to represent mission environment
Object representation in STK:
The Moon = Central Body
Site locations = Lat./ Long. Coordinates
Rover = Ground Vehicle
Communication w/ Earth = Satellites
Fidelity of STK model increased by adding
lunar terrain elevation, obstacles and
cratered regions
40
STK Model
STK Model:
Rover Route
STK
Action diagram simulates the mission scenario with STK
Represents one rover excavating regolith, transporting regolith to Water
Extraction Plant, and delivering water for storage
Runs until 10,000 kg of water is collected or the rover reaches 365 Earth
days on the Moon
41
STK – Innoslate Co-Simulation
Diagrams View
Action Diagram: One Rover
Sequence Scenario
Scripts added to Action entities to
communicate with STK model:
Initialize STK
Create global variables for time to traverse
values acquired in STK
Calculate duration components (start & end
times) and velocity vector components
Use duration components to calculate
travel times between lunar sites
42
STK – Innoslate Co-Simulation Cont’d
Diagrams View
Action Diagram: One Rover
Sequence Scenario
Initialize STK
Travel Duration to
Excavation Site
STK – Innoslate co-simulation run in the Action diagram calculated a
duration of 10.67 months to collect 10,000 kg of water using the previous
assumptions
43
Route Analysis Results
Calculated total distance
of 3,500 km the rover will
travel during the mission
Majority of mission will be
dedicated to excavation
and extraction processes
Action Diagram: One Rover
Sequence Scenario
Modeling &
Simulation
Results verified using a co-simulation with MATLAB
Velocity vectors in the X, Y, and Z planes were retrieved from
STK through Innoslate
Function script written in MATLAB to calculate the magnitude
of the lunar rover velocity
44
MATLAB Results Verification
MATLAB Function:
Rover Velocity Magnitude
MATLAB
Same Innoslate Action
diagram was executed but
with scripts to initialize
MATLAB instead of STK
“Total Distance Travelled”
Resource also added to keep
count and compute the
kilometers travelled by the
rover during its mission
APIs applied in Settings
45
MATLAB – Innoslate Co-Simulation
API settings in light mode
Same results found using a GET Request in the MATLAB -
Innoslate co-simulation
Duration of 10.67 months to collect 10,000 kg of water using the same,
previous assumptions
Total distance of 3,500 km the rover will travel during the mission
46
MATLAB Verification Results
Action Diagram: One Rover
Sequence Scenario
Modeling &
Simulation
Focuses on Phases Integration & Test, Operations Test &
Evaluation and Transition phases using Innoslate’s Test Center
and integration tools Ansys and LabView
47
Task Three: Test
Sub-Tasks:
V&V Requirements and Test
Suites
Lunar Environment Simulation
Test SPECTER Prototype
Conduct Performance and
Environmental Analysis
Incorporate Innoslate’s Digital
Thread
Produced Final Report
Document
48
Task Three SOW
Action Diagram:
Lunar Rover SOW
Diagrams View
Test suites were created in Innoslate’s Test Center to verify the
SPECTER prototype and each of its components function
properly and as expected
Test cases traced back to their corresponding requirement for
verification
Test suites created verify the following:
Robotic Arm and Servo Motor
Excavator Claw
LEO Rover Prototype
49
Verification Testing
Ansys platform’s Spaceclaim and Static Structural were used
to analyze and locate design flaws for the excavator claw
Metrics calculated:
Surface Area
Volume
Maximum Load Capacity
Maximum Pressure Tolerance
These metrics are used for simulating the Mission and
Excavation Scenarios models
50
Excavator Design Analysis
Used to analyze the excavator claw design’s CAD drawing
Calculated surface area and volume for the excavator claw
Modified Density Equation to calculate the maximum load
mass capacity the excavator claw can support per dig during
excavation
51
Ansys Spaceclaim
Max Load Mass
= Regolith Density * Excavator Claw Volume
= 231.9 g of regolith
Equation Editor
*Regolith density provided
by Break the Ice Challenge
Ansys Spaceclaim:
Excavator Claw
Continued Spaceclaim analysis of the excavator claw
Determined excavator claw pressure tolerance during
excavation using varying load capacities
Utilized Pressure Equation for each partial load capacity to
calculate the pressure tolerances the excavator claw can endure
during the lunar rover mission
52
Ansys Static Structural
60% Load Capacity = 139 g 80% Load Capacity = 185 g
Identified pressure points and area where the excavator claw
will be impacted during excavation
53
Ansys Static Structural Cont’d
Pressure = Mass Load Capacity * Lunar Gravity * Excavator Claw Surface Area
(60%) = 3.355 Pa
(80%) = 4.466 Pa
Equation Editor
Ansys Static Structural:
Excavator Claw
Direction of
Pressure
Used to perform a structural
analysis of the excavator design
Determines the strength and
stability of the design under
loading conditions
Analysis conducted for both
carrying capacities:
Strain Test
Stress Test
Deformation Test
54
Excavator Analysis Results
Test suite for LEO rover
55
LEO Rover Testing
Test plans were created in Documents View before
simulating lunar environmental conditions to validate
the SPECTER prototype
Test plans created validate the following SPECTER
Functionality:
Navigation – Speeds and travel times
Excavation – Regolith detection and collection
Storage – Materials containment and protection
Equipment Protection – Dust mitigation
56
Validation Testing
Conducted to validate SPECTER’s functionality and
efficiency. Parameters calculated:
Landed mass of rover’s equipment, the NASA Water Extraction Plant
mass, and total landed mass
Mass of total water delivered during the mission lifetime (365 days)
Power consumed by the rover, the NASA Water Extraction Plant, and
total power consumed during the mission lifetime
57
Performance Analysis
LEO Rover Prototype has a mass of 6 kg and a carrying capacity of 5kg,
resulting in a ratio of 5:6 carrying capacity to body mass
The average carrying capacity of a full-size rover is 100kg. Using the 5:6
ratio, this is an estimated rover body mass of 120 kg
Therefore, the full-size to prototype scale rovers have a mass ratio of 1:20
58
Prototype
Mass
Full-Size
Mass
Prototype to Full-
Size Ratio
Carrying Capacity 5 kg 100 kg 20:1
Rover Body 6 kg 120 kg
Carrying Capacity
to Mass Ratio
5:6
Landed Mass Analysis
The following masses have also been added to the rover’s body for
excavation functionality
Each piece of equipment reduces the rover’s total carrying capacity
(5 kg) and by consequence also reduces how much regolith or water
it can store at any given time in the mission
59
Equipment Prototype
Mass
Mass to Carrying
Capacity Ratio
Scaled, Full-
Size Mass
Robot Arm 1 kg 1:5 20 kg
Storage Unit < 1 kg < 1:5 < 20 kg
Battery < 1 kg < 1:5 < 20 kg
Solar Panels 0.3 kg 0.3:5 6 kg
Regolith Mass < 3 kg < 3:5 < 60 kg
The full-size lunar
rover can hold an
additional mass of
less than 60 kg at any
point in the mission
< 66 kg
Total Mass
* Max Carrying Capacity
Landed Mass Analysis Cont’d
In conclusion, the total mass of the full-size rover, including its
supporting equipment, is less than 186 kg
The NASA Water Extraction Plant has a landed mass of 700 kg
Therefore, the total mass to be landed on the surface of the Moon
for this mission is estimated to be 886 kg
60
Landed Mass Analysis Cont’d
Conducted to ensure SPECTER will withstand extreme
environmental conditions on the surface of the Moon
Low temperatures at Delivery Site – Ranging 50-200 degrees K
Low temperatures at Excavation Site – Ranging 40-100 degrees K
Reduced gravity of 1.62 m/s²
Lunar dust with electronically charged particles smaller than 20 microns
Vacuum atmospheric pressure of 2.28x10−12
61
Documents View
Environmental Analysis
Each environmental condition is mitigated:
Low temperatures at sites: A Warm Electronics Box encloses the
rover’s avionics to keep the equipment warm at operable temperatures
Reduced gravity: The wide set body frame and rugged wheels stabilize
the rover during navigation
Vacuum: Non-pneumatic tires were used on the rover body
Lunar dust: Tire fenders prevent dust from entering the rover body
62
Documents View
Environmental Analysis Cont’d
Demonstration will be
provided as a video
Filming for the video began
today
We will send out an
announcement as soon as
the video is available
63
Task Four: Demo
Questions and
Answers
Use the panel on the right to ask your
questions.
65
Thank you.
Visit www.innoslate.com to get started on your
Digital Engineering journey.
Thank you to the other software products
that completed the digital thread.

Mais conteúdo relacionado

Mais procurados

Orbit design for exoplanet discovery spacecraft dr dora musielak 1 april 2019
Orbit design for exoplanet discovery spacecraft dr dora musielak 1 april 2019Orbit design for exoplanet discovery spacecraft dr dora musielak 1 april 2019
Orbit design for exoplanet discovery spacecraft dr dora musielak 1 april 2019Dora Musielak, Ph.D.
 
National Technology Day
National Technology DayNational Technology Day
National Technology DayMuskan Verma
 
ME6501 Cad 2 mark question and answer
ME6501 Cad 2 mark question and answerME6501 Cad 2 mark question and answer
ME6501 Cad 2 mark question and answerJavith Saleem
 
Six Week Industrial Training | Mechanical Engineering | Phadtare Engineering ...
Six Week Industrial Training | Mechanical Engineering | Phadtare Engineering ...Six Week Industrial Training | Mechanical Engineering | Phadtare Engineering ...
Six Week Industrial Training | Mechanical Engineering | Phadtare Engineering ...Yash Sawant
 
CAD CAM CAE and PLM Study
CAD CAM CAE and PLM StudyCAD CAM CAE and PLM Study
CAD CAM CAE and PLM StudyHarshadaPawar26
 
RESUME VIVEK KUKADE__Tool & Product Design
RESUME VIVEK KUKADE__Tool & Product DesignRESUME VIVEK KUKADE__Tool & Product Design
RESUME VIVEK KUKADE__Tool & Product Designvivek kukade
 
Study on Importance of Computer in Space Technology
Study on Importance of Computer in  Space TechnologyStudy on Importance of Computer in  Space Technology
Study on Importance of Computer in Space Technologymsnsela
 
REPORT ON SUMMER TRAINING IN MEMS AT CSIR-CEERI
REPORT ON SUMMER TRAINING IN MEMS AT CSIR-CEERIREPORT ON SUMMER TRAINING IN MEMS AT CSIR-CEERI
REPORT ON SUMMER TRAINING IN MEMS AT CSIR-CEERIManish Choudhary
 
I.t in space
I.t in spaceI.t in space
I.t in spacenunna09
 
FAILURE ANALYSIS OF IC ENGINE VALVES BY USING FEA
FAILURE ANALYSIS OF IC ENGINE VALVES BY USING FEAFAILURE ANALYSIS OF IC ENGINE VALVES BY USING FEA
FAILURE ANALYSIS OF IC ENGINE VALVES BY USING FEAIjripublishers Ijri
 
Introduction to Computer Graphics
Introduction to Computer GraphicsIntroduction to Computer Graphics
Introduction to Computer GraphicsYatin Singh
 

Mais procurados (20)

Android seminar ppt
Android seminar pptAndroid seminar ppt
Android seminar ppt
 
Orbit design for exoplanet discovery spacecraft dr dora musielak 1 april 2019
Orbit design for exoplanet discovery spacecraft dr dora musielak 1 april 2019Orbit design for exoplanet discovery spacecraft dr dora musielak 1 april 2019
Orbit design for exoplanet discovery spacecraft dr dora musielak 1 april 2019
 
National Technology Day
National Technology DayNational Technology Day
National Technology Day
 
ME6501 Cad 2 mark question and answer
ME6501 Cad 2 mark question and answerME6501 Cad 2 mark question and answer
ME6501 Cad 2 mark question and answer
 
Six Week Industrial Training | Mechanical Engineering | Phadtare Engineering ...
Six Week Industrial Training | Mechanical Engineering | Phadtare Engineering ...Six Week Industrial Training | Mechanical Engineering | Phadtare Engineering ...
Six Week Industrial Training | Mechanical Engineering | Phadtare Engineering ...
 
CAD CAM CAE and PLM Study
CAD CAM CAE and PLM StudyCAD CAM CAE and PLM Study
CAD CAM CAE and PLM Study
 
Digital clock project in C
Digital clock project in CDigital clock project in C
Digital clock project in C
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
 
space technology
space technologyspace technology
space technology
 
RESUME VIVEK KUKADE__Tool & Product Design
RESUME VIVEK KUKADE__Tool & Product DesignRESUME VIVEK KUKADE__Tool & Product Design
RESUME VIVEK KUKADE__Tool & Product Design
 
Study on Importance of Computer in Space Technology
Study on Importance of Computer in  Space TechnologyStudy on Importance of Computer in  Space Technology
Study on Importance of Computer in Space Technology
 
Hubble Telescope
Hubble TelescopeHubble Telescope
Hubble Telescope
 
Design of mechatronics systems
Design of mechatronics systemsDesign of mechatronics systems
Design of mechatronics systems
 
REPORT ON SUMMER TRAINING IN MEMS AT CSIR-CEERI
REPORT ON SUMMER TRAINING IN MEMS AT CSIR-CEERIREPORT ON SUMMER TRAINING IN MEMS AT CSIR-CEERI
REPORT ON SUMMER TRAINING IN MEMS AT CSIR-CEERI
 
PHP Project PPT
PHP Project PPTPHP Project PPT
PHP Project PPT
 
I.t in space
I.t in spaceI.t in space
I.t in space
 
FAILURE ANALYSIS OF IC ENGINE VALVES BY USING FEA
FAILURE ANALYSIS OF IC ENGINE VALVES BY USING FEAFAILURE ANALYSIS OF IC ENGINE VALVES BY USING FEA
FAILURE ANALYSIS OF IC ENGINE VALVES BY USING FEA
 
Modelling and Analysis Laboratory Manual
Modelling and Analysis Laboratory ManualModelling and Analysis Laboratory Manual
Modelling and Analysis Laboratory Manual
 
CNC & 3D Printing Lab Manual
CNC & 3D Printing Lab ManualCNC & 3D Printing Lab Manual
CNC & 3D Printing Lab Manual
 
Introduction to Computer Graphics
Introduction to Computer GraphicsIntroduction to Computer Graphics
Introduction to Computer Graphics
 

Semelhante a Digital Engineering of a Lunar Rover Prototype

Building a Digital Thread
Building a Digital ThreadBuilding a Digital Thread
Building a Digital ThreadTaylorDuffy11
 
Introduction to interactive data visualisation using R Shiny
Introduction to interactive data visualisation using R ShinyIntroduction to interactive data visualisation using R Shiny
Introduction to interactive data visualisation using R Shinyanamarisaguedes
 
Gsoc proposal 2021 polaris
Gsoc proposal 2021 polarisGsoc proposal 2021 polaris
Gsoc proposal 2021 polarisAyushBansal122
 
A Love Story with Kubevirt and Backstage from Cloud Native NoVA meetup Feb 2024
A Love Story with Kubevirt and Backstage from Cloud Native NoVA meetup Feb 2024A Love Story with Kubevirt and Backstage from Cloud Native NoVA meetup Feb 2024
A Love Story with Kubevirt and Backstage from Cloud Native NoVA meetup Feb 2024Cloud Native NoVA
 
Smalltalks 2013 - A web console to control nanosatellites
Smalltalks 2013 - A web console to control nanosatellitesSmalltalks 2013 - A web console to control nanosatellites
Smalltalks 2013 - A web console to control nanosatellitesNahuel Garbezza
 
Cross Cloud CI Intro
Cross Cloud CI IntroCross Cloud CI Intro
Cross Cloud CI IntroW Watson
 
Mulvery Detail - English
Mulvery Detail - EnglishMulvery Detail - English
Mulvery Detail - EnglishDaichi Teruya
 
Track A-2 基於 Spark 的數據分析
Track A-2 基於 Spark 的數據分析Track A-2 基於 Spark 的數據分析
Track A-2 基於 Spark 的數據分析Etu Solution
 
Application of programming languages in civil engineering
Application of programming languages in civil engineeringApplication of programming languages in civil engineering
Application of programming languages in civil engineeringMuhammad Usama Umer
 
React Native custom components
React Native custom componentsReact Native custom components
React Native custom componentsJeremy Grancher
 
Swift at IBM: Mobile, open source and the drive to the cloud
Swift at IBM: Mobile, open source and the drive to the cloudSwift at IBM: Mobile, open source and the drive to the cloud
Swift at IBM: Mobile, open source and the drive to the cloudDev_Events
 
Continuous Integration with Cloud Foundry Concourse and Docker on OpenPOWER
Continuous Integration with Cloud Foundry Concourse and Docker on OpenPOWERContinuous Integration with Cloud Foundry Concourse and Docker on OpenPOWER
Continuous Integration with Cloud Foundry Concourse and Docker on OpenPOWERIndrajit Poddar
 
Contributing to OpenStack
Contributing to OpenStackContributing to OpenStack
Contributing to OpenStackdevkulkarni
 
Docker Enterprise Workshop - Intro
Docker Enterprise Workshop - IntroDocker Enterprise Workshop - Intro
Docker Enterprise Workshop - IntroPatrick Chanezon
 
CI-CD Jenkins, GitHub Actions, Tekton
CI-CD Jenkins, GitHub Actions, Tekton CI-CD Jenkins, GitHub Actions, Tekton
CI-CD Jenkins, GitHub Actions, Tekton Araf Karsh Hamid
 
Engineering and Industrial Mobile Application (APP) Development
Engineering and Industrial Mobile Application (APP) DevelopmentEngineering and Industrial Mobile Application (APP) Development
Engineering and Industrial Mobile Application (APP) DevelopmentLiving Online
 
Red Hat JBoss BRMS and BPMS Workbench and Rich Client Technology
Red Hat JBoss BRMS and BPMS Workbench and Rich Client TechnologyRed Hat JBoss BRMS and BPMS Workbench and Rich Client Technology
Red Hat JBoss BRMS and BPMS Workbench and Rich Client TechnologyMark Proctor
 
Neboneed Farhadi's Experience Portfolio
Neboneed Farhadi's Experience Portfolio Neboneed Farhadi's Experience Portfolio
Neboneed Farhadi's Experience Portfolio Neboneed Farhadi
 

Semelhante a Digital Engineering of a Lunar Rover Prototype (20)

Building a Digital Thread
Building a Digital ThreadBuilding a Digital Thread
Building a Digital Thread
 
Introduction to interactive data visualisation using R Shiny
Introduction to interactive data visualisation using R ShinyIntroduction to interactive data visualisation using R Shiny
Introduction to interactive data visualisation using R Shiny
 
Gsoc proposal 2021 polaris
Gsoc proposal 2021 polarisGsoc proposal 2021 polaris
Gsoc proposal 2021 polaris
 
Gsoc proposal
Gsoc proposalGsoc proposal
Gsoc proposal
 
A Love Story with Kubevirt and Backstage from Cloud Native NoVA meetup Feb 2024
A Love Story with Kubevirt and Backstage from Cloud Native NoVA meetup Feb 2024A Love Story with Kubevirt and Backstage from Cloud Native NoVA meetup Feb 2024
A Love Story with Kubevirt and Backstage from Cloud Native NoVA meetup Feb 2024
 
Smalltalks 2013 - A web console to control nanosatellites
Smalltalks 2013 - A web console to control nanosatellitesSmalltalks 2013 - A web console to control nanosatellites
Smalltalks 2013 - A web console to control nanosatellites
 
Cross Cloud CI Intro
Cross Cloud CI IntroCross Cloud CI Intro
Cross Cloud CI Intro
 
Mulvery Detail - English
Mulvery Detail - EnglishMulvery Detail - English
Mulvery Detail - English
 
Track A-2 基於 Spark 的數據分析
Track A-2 基於 Spark 的數據分析Track A-2 基於 Spark 的數據分析
Track A-2 基於 Spark 的數據分析
 
Application of programming languages in civil engineering
Application of programming languages in civil engineeringApplication of programming languages in civil engineering
Application of programming languages in civil engineering
 
React Native custom components
React Native custom componentsReact Native custom components
React Native custom components
 
Swift at IBM: Mobile, open source and the drive to the cloud
Swift at IBM: Mobile, open source and the drive to the cloudSwift at IBM: Mobile, open source and the drive to the cloud
Swift at IBM: Mobile, open source and the drive to the cloud
 
Continuous Integration with Cloud Foundry Concourse and Docker on OpenPOWER
Continuous Integration with Cloud Foundry Concourse and Docker on OpenPOWERContinuous Integration with Cloud Foundry Concourse and Docker on OpenPOWER
Continuous Integration with Cloud Foundry Concourse and Docker on OpenPOWER
 
Project
ProjectProject
Project
 
Contributing to OpenStack
Contributing to OpenStackContributing to OpenStack
Contributing to OpenStack
 
Docker Enterprise Workshop - Intro
Docker Enterprise Workshop - IntroDocker Enterprise Workshop - Intro
Docker Enterprise Workshop - Intro
 
CI-CD Jenkins, GitHub Actions, Tekton
CI-CD Jenkins, GitHub Actions, Tekton CI-CD Jenkins, GitHub Actions, Tekton
CI-CD Jenkins, GitHub Actions, Tekton
 
Engineering and Industrial Mobile Application (APP) Development
Engineering and Industrial Mobile Application (APP) DevelopmentEngineering and Industrial Mobile Application (APP) Development
Engineering and Industrial Mobile Application (APP) Development
 
Red Hat JBoss BRMS and BPMS Workbench and Rich Client Technology
Red Hat JBoss BRMS and BPMS Workbench and Rich Client TechnologyRed Hat JBoss BRMS and BPMS Workbench and Rich Client Technology
Red Hat JBoss BRMS and BPMS Workbench and Rich Client Technology
 
Neboneed Farhadi's Experience Portfolio
Neboneed Farhadi's Experience Portfolio Neboneed Farhadi's Experience Portfolio
Neboneed Farhadi's Experience Portfolio
 

Mais de Elizabeth Steiner

What Comes After MBSE Webinar
What Comes After MBSE WebinarWhat Comes After MBSE Webinar
What Comes After MBSE WebinarElizabeth Steiner
 
How to Verify and Validate a System or Process
How to Verify and Validate a System or ProcessHow to Verify and Validate a System or Process
How to Verify and Validate a System or ProcessElizabeth Steiner
 
How to MBSE Pt.3 - Configuration Management.pptx
How to MBSE Pt.3 - Configuration Management.pptxHow to MBSE Pt.3 - Configuration Management.pptx
How to MBSE Pt.3 - Configuration Management.pptxElizabeth Steiner
 
How to Develop and Simulate Models with No Coding Experience
How to Develop and Simulate Models with No Coding ExperienceHow to Develop and Simulate Models with No Coding Experience
How to Develop and Simulate Models with No Coding ExperienceElizabeth Steiner
 
How to Write Requirements - How to MBSE PT.1
How to Write Requirements - How to MBSE PT.1How to Write Requirements - How to MBSE PT.1
How to Write Requirements - How to MBSE PT.1Elizabeth Steiner
 
A Model-Based Systems Engineering Approach to Portfolio Management
A Model-Based Systems Engineering Approach to Portfolio ManagementA Model-Based Systems Engineering Approach to Portfolio Management
A Model-Based Systems Engineering Approach to Portfolio ManagementElizabeth Steiner
 
Requirements Management Using Innoslate
Requirements Management Using InnoslateRequirements Management Using Innoslate
Requirements Management Using InnoslateElizabeth Steiner
 
What is the Future of Systems Engineering?
What is the Future of Systems Engineering?What is the Future of Systems Engineering?
What is the Future of Systems Engineering?Elizabeth Steiner
 
Using Innoslate for Model-Based Systems Engineering
Using Innoslate for Model-Based Systems EngineeringUsing Innoslate for Model-Based Systems Engineering
Using Innoslate for Model-Based Systems EngineeringElizabeth Steiner
 
One Lifecycle One Tool webinar
One Lifecycle One Tool webinarOne Lifecycle One Tool webinar
One Lifecycle One Tool webinarElizabeth Steiner
 
Improve Product Design with High Quality Requirements
Improve Product Design with High Quality RequirementsImprove Product Design with High Quality Requirements
Improve Product Design with High Quality RequirementsElizabeth Steiner
 
What Is PLM and Why Is It Important
What Is PLM and Why Is It ImportantWhat Is PLM and Why Is It Important
What Is PLM and Why Is It ImportantElizabeth Steiner
 
Innoslate's Ontology - LML, SysML, DoDAF, and more
Innoslate's Ontology - LML, SysML, DoDAF, and moreInnoslate's Ontology - LML, SysML, DoDAF, and more
Innoslate's Ontology - LML, SysML, DoDAF, and moreElizabeth Steiner
 
Verification and Validation with Innoslate
Verification and Validation with InnoslateVerification and Validation with Innoslate
Verification and Validation with InnoslateElizabeth Steiner
 

Mais de Elizabeth Steiner (20)

What Comes After MBSE Webinar
What Comes After MBSE WebinarWhat Comes After MBSE Webinar
What Comes After MBSE Webinar
 
Dissecting SysML v2.pptx
Dissecting SysML v2.pptxDissecting SysML v2.pptx
Dissecting SysML v2.pptx
 
How to Verify and Validate a System or Process
How to Verify and Validate a System or ProcessHow to Verify and Validate a System or Process
How to Verify and Validate a System or Process
 
How to MBSE Pt.3 - Configuration Management.pptx
How to MBSE Pt.3 - Configuration Management.pptxHow to MBSE Pt.3 - Configuration Management.pptx
How to MBSE Pt.3 - Configuration Management.pptx
 
How to Develop and Simulate Models with No Coding Experience
How to Develop and Simulate Models with No Coding ExperienceHow to Develop and Simulate Models with No Coding Experience
How to Develop and Simulate Models with No Coding Experience
 
How to Write Requirements - How to MBSE PT.1
How to Write Requirements - How to MBSE PT.1How to Write Requirements - How to MBSE PT.1
How to Write Requirements - How to MBSE PT.1
 
Innoslate 4.5 and Sopatra
Innoslate 4.5 and SopatraInnoslate 4.5 and Sopatra
Innoslate 4.5 and Sopatra
 
A Model-Based Systems Engineering Approach to Portfolio Management
A Model-Based Systems Engineering Approach to Portfolio ManagementA Model-Based Systems Engineering Approach to Portfolio Management
A Model-Based Systems Engineering Approach to Portfolio Management
 
Developing Digital Twins
Developing Digital TwinsDeveloping Digital Twins
Developing Digital Twins
 
Innoslate Overview
Innoslate OverviewInnoslate Overview
Innoslate Overview
 
Requirements Management Using Innoslate
Requirements Management Using InnoslateRequirements Management Using Innoslate
Requirements Management Using Innoslate
 
What's New in Innoslate 4.3
What's New in Innoslate 4.3What's New in Innoslate 4.3
What's New in Innoslate 4.3
 
Innoslate for Academia
Innoslate for AcademiaInnoslate for Academia
Innoslate for Academia
 
What is the Future of Systems Engineering?
What is the Future of Systems Engineering?What is the Future of Systems Engineering?
What is the Future of Systems Engineering?
 
Using Innoslate for Model-Based Systems Engineering
Using Innoslate for Model-Based Systems EngineeringUsing Innoslate for Model-Based Systems Engineering
Using Innoslate for Model-Based Systems Engineering
 
One Lifecycle One Tool webinar
One Lifecycle One Tool webinarOne Lifecycle One Tool webinar
One Lifecycle One Tool webinar
 
Improve Product Design with High Quality Requirements
Improve Product Design with High Quality RequirementsImprove Product Design with High Quality Requirements
Improve Product Design with High Quality Requirements
 
What Is PLM and Why Is It Important
What Is PLM and Why Is It ImportantWhat Is PLM and Why Is It Important
What Is PLM and Why Is It Important
 
Innoslate's Ontology - LML, SysML, DoDAF, and more
Innoslate's Ontology - LML, SysML, DoDAF, and moreInnoslate's Ontology - LML, SysML, DoDAF, and more
Innoslate's Ontology - LML, SysML, DoDAF, and more
 
Verification and Validation with Innoslate
Verification and Validation with InnoslateVerification and Validation with Innoslate
Verification and Validation with Innoslate
 

Último

Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 

Último (20)

Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 

Digital Engineering of a Lunar Rover Prototype

  • 1. Digital Engineering a Lunar Rover Demonstration of Innoslate’s Digital Thread 1 October 19th, 2021, Dr. Steven H. Dam
  • 2. Ask Us Your Questions • Ask us your questions using the panel on the right • This presentation is being recorded and will be made available to you. • Contact us after the webinar through o support@Innoslate.com o Call 571.485.7800 o LinkedIn Innoslate User Group o Twitter
  • 3. Meet Your Host • President and Founder of SPEC Innovations • Participated in the development of C4ISR and the DoDAF • Expert Systems Engineering Professionals Certificate • steven.dam@specinnovations.com • @stevenhdam
  • 4. Special Thanks To 4 Michael Campbell Mallory Jones Michael Jordan Lilleigh Stevie Andy Tapia
  • 5. SPEC Innovations Background NASA’s Break the Ice Challenge Innoslate’s Digital Thread Project Initiation Task One – Research and Design Lunar Rover Prototype Task Two – Build Lunar Rover Prototype Task Three – Task Three - Test Lunar Rover Prototype Task Four – Task Four - Demonstrate Digital Thread 5 Agenda
  • 6. SPEC Innovations Background Developed MBSE tool Innoslate, supports the entire Systems Engineering Lifecycle Software release v4.5 revealed more features to support a modern digital thread experience within the MBSE tool Interested in NASA’s Break the Ice Challenge to demonstrate Innoslate’s Digital Thread Goal: to produce a lunar rover prototype system using a complete digital thread Scope: system boundary to remain within the physical limitations of the lunar rover prototype 6
  • 7. Competition hosted by NASA Solutions sought for: Excavating regolith Maximizing water delivered Minimizing mass of equipment Minimizing power consumption Goal: Extract 10,000 kg of water from regolith in 365 days 7 Break the Ice Challenge
  • 8. Excavate icy regolith at Excavation Site Extract water from icy regolith using the NASA Water Extraction Plant Deliver water to Delivery Site Performance parameters and environmental constraints also provided by NASA 8 Mission Requirements
  • 9. Used to step through the lunar rover prototype lifecycle in Innoslate’s Digital Thread 9 Stepping Through the Lifecycle
  • 10. Project Initiation Used Documents, Diagrams, and Project Management Views to initiate the Lunar Rover Project 10
  • 11. Defines the project’s: Scope, Schedule, Budget, and Technical execution 11 Documents View PMP Document: Lunar Rover PMP Project Management Plan
  • 12. Statement of Work SOW created in an Action diagram to define the technical work Tasks include: Research & Development Build Test Demonstrate Challenge Deliverables 12 Diagrams View Action Diagram: Lunar Rover SOW
  • 13. Auto-generated by opening a Timeline diagram or Gantt chart from the SOW Action diagram 13 Timeline Diagram: Lunar Rover SOW Diagrams View Gantt Chart: Lunar Rover SOW Charts View Schedule
  • 14. Used to keep track of the status of each Task 14 Project Management View Kanban Board: Lunar Rover SOW Kanban Board
  • 15. Task One: Research & Design Focuses on Architecture Development and Design phases using Innoslate’s Documents, Diagrams, and Modeling & Simulation 15
  • 16. Sub-Tasks: Research Design Incorporate Innoslate’s Digital Thread Produced documents: Requirements, BOM, and Final Report 16 Task One SOW Diagrams View Action Diagram: Lunar Rover SOW
  • 17. System Architecture Research Investigated Break the Ice Challenge Rules documentation to extract information: Terms and definitions Technical Constraints Environmental Conditions Mission Requirements Technical Goals Supporting Assets and Equipment 17
  • 18. “As-Is” System Architecture: Ground communication Lunar Lander Excavation Site Delivery Site NASA Water Extraction Plant NASA Power Plant 18 Diagrams View Asset Diagram: System Architecture Design – Context Analysis
  • 19. Action diagram visualizes the Mission Scenario – Includes all Actions the rover will perform on the surface of the Moon 19 Action Diagram: Mission Scenario Diagrams View Mission Scenario
  • 20. Created a Functional Requirements checklist to compare each prototype design Evaluated designs by totality of functional requirements met 20 Notes Document: Prototype Options Documents View Existing Prototype Design Comparison
  • 21. An Analytical Hierarchy Process (AHP) was conducted to create weighting criteria for scoring and selecting a prototype design option Each prototype design was given a score using the weights 21 Criteria Weights Table Design Options Score Table Design Analysis
  • 22. LEO Rover prototype selected with the highest AHP score and the most functional requirements met (27/47) Ensures all parts have been acquired Asset diagram created to track the purchase details of items in the BOM – Tracking numbers, order numbers, shipping time estimates, serial numbers, SKU numbers Trace these entities to see their data on Dashboards and in reports Combine with user guides, SOP's and more to develop a digital library of all architecture assets 22 Documents View Notes Document: Bill of Materials Bill of Materials
  • 23. LEO Rover doesn’t meet all the functional requirements Additional equipment purchased: 3-D Printer for excavator claw, materials storage unit, tire fenders Robotic arm for excavating regolith LiDAR sensor for navigation LED lights for improving visuals 23 LiDAR LEDs 3D Printer Additional Equipment
  • 24. Updated CBS previously created to record the costs of the rover and its hardware components Costs were rolled up within Database view to estimate the total cost of the lunar rover’s hardware 24 Diagrams View Hierarchy Chart: CBS Entity View Cost Acquisition
  • 25. Used Ansys CAD tool (SpaceClaim) to modify LEO Rover design Created 3-D Prints from SpaceClaim for key additional components (Task 2) Used Innoslate’s CAD Viewer to store designs of the final lunar rover prototype 25 CAD Viewer CAD Viewer: Final Prototype Design Final Prototype Design
  • 26. “To-Be” System Architecture: Ground communication Lunar Lander Excavation Site Delivery Site NASA Water Extraction Plant NASA Power Plant Lunar Rover 26 Diagrams View Asset Diagram: System Architecture * Connects the entire system Final System Architecture
  • 27. Using site locations and distances specified by the challenge, a travel route was mapped for the rover Distances scaled down to the prototype’s size for travel time calculation in Task Three 27 * See Appendix for scale calculations Rover Route
  • 28. Models the excavation process the rover completes each time it navigates to the Excavation Site Running the simulator calculates the amount of regolith the rover can excavate per excavation cycle 28 Action Diagram: Excavation Scenario Diagrams View Excavation Scenario is one portion of the Mission Scenario, previously described Excavation Scenario
  • 29. Focuses on Hardware and Software Acquisition Phase using Innoslate’s Modeling & Simulation and design engineering tools Ansys, STK, MatLab, and GitHub 29 Task Two: Build
  • 30. Sub-Tasks: Build 3-D Printer and Print Additional Equipment Assemble Lunar Rover Prototype Incorporate Innoslate’s Digital Thread Produced SPECTER prototype and Final Report 30 Task Two SOW Diagrams View Action Diagram: Lunar Rover SOW
  • 31. Creality Ender 3-D Printer was purchased to 3-D print additional materials identified in Task One Confirmed the 3-D printer was functioning properly through a print test 31 Build & Test 3-D Printer Successful Print Test Equipment: Creality Ender 3-D Printer
  • 32. Additional equipment printed for prototype: Excavator Claw Storage Unit Tire Fenders 32 Printed Components Equipment: Excavator Claw, Storage Unit, & Tire Fenders
  • 33. Assembled with the servo motor and Raspberry Pi Mounted 3-D printer Excavator Claw to the Robotic Arm’s grabbers 33 Build Robotic Arm Equipment: Excavator System
  • 34. LEO Rover prototype was assembled upon delivery LEO’s Raspberry Pi was also configured to be controlled from a SPEC laptop 34 LEO Rover Prototype Equipment: LEO Rover Prototype
  • 35. All of the components were then assembled together to create SPEC Innovation’s SPECTER Space Prospect Exploration Convoy Transporting & Evaluating Regolith 35 SPECTER Equipment: SPECTER
  • 36. GitHub repository created for interfacing with SPECTER Firmware allows messages to be sent to the equipment components for performing functions Messages also in return sent back and displayed to user: Ambient temperature recording Distance obstacles are from front and rear of rover body Obstacle collision warning if rover body approaches too closely 36 SPECTER User Interface
  • 37. Use a token to access GitHub via Innoslate View all the project’s repositories on the GitHub Dashboard Issue created for each message SPEC’s software team then added the code and published the updates for SPECTER’s UI 37 GitHub Repositories GitHub Access via Innoslate Innoslate Repositories: SPECTER UI and Firmware GitHub Issue
  • 38. Displayed to user: Distance obstacles are from front and rear of rover body Obstacle collision warning if rover body approaches too closely Current voltage output 38 SPECTER UI Cont’d SPECTER UI: SPECTER Camera View and Control SPECTER
  • 39. AGI’s Systems Tool Kit (STK) used to model the rover’s travel route on the lunar surface in order to calculate time to reach the mission’s goal of 10,000 kg of collected water Assumptions made during model development: Same route followed by rover for every regolith excavation and delivery Rover has excavation rate of 100 kg of regolith per hour Rover has carrying capacity of 100 kg Rover can complete 10 excavation cycles before recharging battery One full charge is 4 hours Unloading regolith requires 15 minutes, and loading water requires 1 hour 39 Rover Route Analysis
  • 40. Built to represent mission environment Object representation in STK: The Moon = Central Body Site locations = Lat./ Long. Coordinates Rover = Ground Vehicle Communication w/ Earth = Satellites Fidelity of STK model increased by adding lunar terrain elevation, obstacles and cratered regions 40 STK Model STK Model: Rover Route STK
  • 41. Action diagram simulates the mission scenario with STK Represents one rover excavating regolith, transporting regolith to Water Extraction Plant, and delivering water for storage Runs until 10,000 kg of water is collected or the rover reaches 365 Earth days on the Moon 41 STK – Innoslate Co-Simulation Diagrams View Action Diagram: One Rover Sequence Scenario
  • 42. Scripts added to Action entities to communicate with STK model: Initialize STK Create global variables for time to traverse values acquired in STK Calculate duration components (start & end times) and velocity vector components Use duration components to calculate travel times between lunar sites 42 STK – Innoslate Co-Simulation Cont’d Diagrams View Action Diagram: One Rover Sequence Scenario Initialize STK Travel Duration to Excavation Site
  • 43. STK – Innoslate co-simulation run in the Action diagram calculated a duration of 10.67 months to collect 10,000 kg of water using the previous assumptions 43 Route Analysis Results Calculated total distance of 3,500 km the rover will travel during the mission Majority of mission will be dedicated to excavation and extraction processes Action Diagram: One Rover Sequence Scenario Modeling & Simulation
  • 44. Results verified using a co-simulation with MATLAB Velocity vectors in the X, Y, and Z planes were retrieved from STK through Innoslate Function script written in MATLAB to calculate the magnitude of the lunar rover velocity 44 MATLAB Results Verification MATLAB Function: Rover Velocity Magnitude MATLAB
  • 45. Same Innoslate Action diagram was executed but with scripts to initialize MATLAB instead of STK “Total Distance Travelled” Resource also added to keep count and compute the kilometers travelled by the rover during its mission APIs applied in Settings 45 MATLAB – Innoslate Co-Simulation API settings in light mode
  • 46. Same results found using a GET Request in the MATLAB - Innoslate co-simulation Duration of 10.67 months to collect 10,000 kg of water using the same, previous assumptions Total distance of 3,500 km the rover will travel during the mission 46 MATLAB Verification Results Action Diagram: One Rover Sequence Scenario Modeling & Simulation
  • 47. Focuses on Phases Integration & Test, Operations Test & Evaluation and Transition phases using Innoslate’s Test Center and integration tools Ansys and LabView 47 Task Three: Test
  • 48. Sub-Tasks: V&V Requirements and Test Suites Lunar Environment Simulation Test SPECTER Prototype Conduct Performance and Environmental Analysis Incorporate Innoslate’s Digital Thread Produced Final Report Document 48 Task Three SOW Action Diagram: Lunar Rover SOW Diagrams View
  • 49. Test suites were created in Innoslate’s Test Center to verify the SPECTER prototype and each of its components function properly and as expected Test cases traced back to their corresponding requirement for verification Test suites created verify the following: Robotic Arm and Servo Motor Excavator Claw LEO Rover Prototype 49 Verification Testing
  • 50. Ansys platform’s Spaceclaim and Static Structural were used to analyze and locate design flaws for the excavator claw Metrics calculated: Surface Area Volume Maximum Load Capacity Maximum Pressure Tolerance These metrics are used for simulating the Mission and Excavation Scenarios models 50 Excavator Design Analysis
  • 51. Used to analyze the excavator claw design’s CAD drawing Calculated surface area and volume for the excavator claw Modified Density Equation to calculate the maximum load mass capacity the excavator claw can support per dig during excavation 51 Ansys Spaceclaim Max Load Mass = Regolith Density * Excavator Claw Volume = 231.9 g of regolith Equation Editor *Regolith density provided by Break the Ice Challenge Ansys Spaceclaim: Excavator Claw
  • 52. Continued Spaceclaim analysis of the excavator claw Determined excavator claw pressure tolerance during excavation using varying load capacities Utilized Pressure Equation for each partial load capacity to calculate the pressure tolerances the excavator claw can endure during the lunar rover mission 52 Ansys Static Structural 60% Load Capacity = 139 g 80% Load Capacity = 185 g
  • 53. Identified pressure points and area where the excavator claw will be impacted during excavation 53 Ansys Static Structural Cont’d Pressure = Mass Load Capacity * Lunar Gravity * Excavator Claw Surface Area (60%) = 3.355 Pa (80%) = 4.466 Pa Equation Editor Ansys Static Structural: Excavator Claw Direction of Pressure
  • 54. Used to perform a structural analysis of the excavator design Determines the strength and stability of the design under loading conditions Analysis conducted for both carrying capacities: Strain Test Stress Test Deformation Test 54 Excavator Analysis Results
  • 55. Test suite for LEO rover 55 LEO Rover Testing
  • 56. Test plans were created in Documents View before simulating lunar environmental conditions to validate the SPECTER prototype Test plans created validate the following SPECTER Functionality: Navigation – Speeds and travel times Excavation – Regolith detection and collection Storage – Materials containment and protection Equipment Protection – Dust mitigation 56 Validation Testing
  • 57. Conducted to validate SPECTER’s functionality and efficiency. Parameters calculated: Landed mass of rover’s equipment, the NASA Water Extraction Plant mass, and total landed mass Mass of total water delivered during the mission lifetime (365 days) Power consumed by the rover, the NASA Water Extraction Plant, and total power consumed during the mission lifetime 57 Performance Analysis
  • 58. LEO Rover Prototype has a mass of 6 kg and a carrying capacity of 5kg, resulting in a ratio of 5:6 carrying capacity to body mass The average carrying capacity of a full-size rover is 100kg. Using the 5:6 ratio, this is an estimated rover body mass of 120 kg Therefore, the full-size to prototype scale rovers have a mass ratio of 1:20 58 Prototype Mass Full-Size Mass Prototype to Full- Size Ratio Carrying Capacity 5 kg 100 kg 20:1 Rover Body 6 kg 120 kg Carrying Capacity to Mass Ratio 5:6 Landed Mass Analysis
  • 59. The following masses have also been added to the rover’s body for excavation functionality Each piece of equipment reduces the rover’s total carrying capacity (5 kg) and by consequence also reduces how much regolith or water it can store at any given time in the mission 59 Equipment Prototype Mass Mass to Carrying Capacity Ratio Scaled, Full- Size Mass Robot Arm 1 kg 1:5 20 kg Storage Unit < 1 kg < 1:5 < 20 kg Battery < 1 kg < 1:5 < 20 kg Solar Panels 0.3 kg 0.3:5 6 kg Regolith Mass < 3 kg < 3:5 < 60 kg The full-size lunar rover can hold an additional mass of less than 60 kg at any point in the mission < 66 kg Total Mass * Max Carrying Capacity Landed Mass Analysis Cont’d
  • 60. In conclusion, the total mass of the full-size rover, including its supporting equipment, is less than 186 kg The NASA Water Extraction Plant has a landed mass of 700 kg Therefore, the total mass to be landed on the surface of the Moon for this mission is estimated to be 886 kg 60 Landed Mass Analysis Cont’d
  • 61. Conducted to ensure SPECTER will withstand extreme environmental conditions on the surface of the Moon Low temperatures at Delivery Site – Ranging 50-200 degrees K Low temperatures at Excavation Site – Ranging 40-100 degrees K Reduced gravity of 1.62 m/s² Lunar dust with electronically charged particles smaller than 20 microns Vacuum atmospheric pressure of 2.28x10−12 61 Documents View Environmental Analysis
  • 62. Each environmental condition is mitigated: Low temperatures at sites: A Warm Electronics Box encloses the rover’s avionics to keep the equipment warm at operable temperatures Reduced gravity: The wide set body frame and rugged wheels stabilize the rover during navigation Vacuum: Non-pneumatic tires were used on the rover body Lunar dust: Tire fenders prevent dust from entering the rover body 62 Documents View Environmental Analysis Cont’d
  • 63. Demonstration will be provided as a video Filming for the video began today We will send out an announcement as soon as the video is available 63 Task Four: Demo
  • 64. Questions and Answers Use the panel on the right to ask your questions.
  • 65. 65 Thank you. Visit www.innoslate.com to get started on your Digital Engineering journey. Thank you to the other software products that completed the digital thread.