Network Construction Dr. Mahmoud Abbas Mahmoud
0
Network Construction
Dr. Mahmoud Abbas Mahmoud
Assistant Professor
2016
Network Construction Dr. Mahmoud Abbas Mahmoud
1
Network Construction
1- Introduction
Network scheduling is a technique used for planning, and scheduling large
projects in the field of construction, maintenance, fabrication, purchasing
computer system etc. The technique is a method of minimizing the trouble spots
such as production, delays and interruptions, by determining critical factors and
coordinating various parts of the overall job. There are two basic planning and
control technique that utilize a network to complete a predetermined project or
schedule. These are Programme Evaluation and Review Technique (PERT) and
Critical Path Method (CPM). A project is defined as a combination of interrelated
activities all of which must be executed in a certain order for its completion
2- Basic Terms
To understand the network techniques one should be familiar with a few basic
terms of which both CPM and PERT are special applications.
Network It is the graphic representation of logically and sequentially connected
activities. Note: There are two types of network diagrams.
(i) Activity on Arrow (AOA) diagram or Arrow Diagram
(ii) Activity on Node (AON) diagram or Precedence Diagram Method (PDM)
In the following sections we will explain how to construct (AOA) diagram which
also called arrow diagram, while (AON) diagram will be explained later on.
Activity An activity represents some action and is a time consuming effort
necessary to complete a particular part of the overall project. Thus, each and every
activity has a point of time where it begins and a point where it ends. It is
represented in the network by an arrow as follows.
Here A is called the activity and i and j are start and end nodes.
Event The beginning and end points of an activity are called events or nodes.
Event is a point in the time and does not consume any resources. It is represented
Network Construction Dr. Mahmoud Abbas Mahmoud
2
by a numbered circle. The head event called the jth event has always a number
higher than the tail event called the ith event.
Merge and burst events it is not necessary for an event to be the ending event of
only one activity but can be the ending event of two or more activities. Such event
is defined as a Merge event.
If the event happens to be the beginning event of two or more activities it is
defined as a Burst event
Preceding, succeeding and concurrent activities
Activities which must be accomplished before a given event can occur are termed
as preceding activities.
Activities which cannot be accomplished until an event has occurred are termed
as succeeding activities.
Activities which can be accomplished concurrently are known as concurrent
activities.
This classification is relative, which means that one activity can be preceding to
a certain event, and the same activity can be succeeding to some other event or it
may be a concurrent activity with one or more activities.
Network Construction Dr. Mahmoud Abbas Mahmoud
3
Dummy activity certain activities which neither consumes time nor resources but
are used simply to represent a connection or a link between the events are known
as dummies. It is shown in the network by a dotted line. The purpose of
introducing dummy activity is -
(i) To maintain uniqueness in the numbering system as every activity may have
distinct set of events by which the activity can be identified.
(ii) To maintain a proper logic in the network.
Note: No two activities can be identified by the same beginning and end event. In
such cases, a dummy activity is introduced to resolve the problem.
3- Common Errors
Following are the three common errors in a network construction:
Looping (cycling): In a network diagram looping error is also known as cycling
error. Drawing an endless loop in a network is known as error of looping. A loop
can be formed if an activity were represented as going back in line.
Dangling To disconnect an activity before the completion of all the activities in
a network diagram is known as Dangling.
Network Construction Dr. Mahmoud Abbas Mahmoud
4
Redundancy If a dummy activity is the only activity emanating from an event
and which can be eliminated is known as redundancy.
4- Rules of Network Construction
There are number of rules in connection with the handling of events and activities
of a project network that should be followed.
(i) Try to avoid arrows which cross each other.
(ii) Use straight arrows.
(iii) No event can occur until every activity preceding, it has been completed.
(iv) An event cannot occur twice i.e. there must be no loops.
(v) An activity succeeding an event cannot be started until that event has occurred.
(vi) Use arrows from left to right. Avoid mixing two directions, vertical and
standing arrows may be used if necessary.
(vii) Dummies should be introduced if it is extremely necessary.
(viii) The network has only one entry point called the start event and one point of
emergence called the end or terminal event.
Numbering the Events
After the network is drawn in a logical sequence every event is assigned a number.
The number sequence must be such so as to reflect the flow of the network. In
numbering the events the following rules should be observed.
(i) Event numbers should be unique.
(ii) Event numbering should be carried out on a sequential basis from left to right.
(iii) The initial event which has all outgoing arrows with no incoming arrow is
numbered as 1.
(iv) Delete all arrows emerging from all the numbered events. This will
create at least one new start event out of the preceding events.
Network Construction Dr. Mahmoud Abbas Mahmoud
5
(v) Number all new start events 2,3 and so on. Repeat this process until all the
terminal event without any successor activity is reached, number the terminal
node suitably.
Note: The head of an arrow should always bear a number higher than the one
assigned to the tail of the arrow.
EXAMPLE- 1
Construct the arrow diagram comprising activities A, B, C, ……….., and L, such
that the following relationships are satisfied.
1. A, B, and C, the first activities of the project, can start simultaneously.
2. A and B precede D.
3. B precedes E, F, and H.
4. F and C precede G.
5. E and H precede I and J.
6. C, D, F, and J precede K.
7. K precedes L.
8. I, G, and L are the terminal activities of the project.
SOLUTION
The resulting arrow diagram is shown below. The diagram shows that the dummy
activities D1 and D2 are used to establish correct precedence relationships. D3 is
used to identify activities E and H with unique end events. The event of the project
are numbered such that their ascending order indicates the direction of progress
in the project.
Network Construction Dr. Mahmoud Abbas Mahmoud
6
EXAMPLE- 2
Construct a network for the project whose activities and their precedence
relationships are as given in Table 1:
TABLE 1
Activity A B C D E F G H I
Predecessor
Activity
- A A - D B, C, E F D G, H
SOLUTION From the given constraints, it is clear that A, D are the starting
activity and I the terminal activity. B, C are starting with the same event and are
both the predecessors of the activity F. Also E has to be the predecessor of F.
Hence, we have to introduce a dummy activity.
Network Construction Dr. Mahmoud Abbas Mahmoud
7
D1 is the dummy activity.
Finally we have the following network.
EXAMPLE- 3
Construct a network for the project whose activities and their precedence
relationships are as given in Table 2.
TABLE 2
Activity A B C D E F G H I J K
Predecessor
Activity
- - - A C B, D B, D E, F A G, H E, F
SOLUTION
Network Construction Dr. Mahmoud Abbas Mahmoud
8
Network Construction Dr. Mahmoud Abbas Mahmoud
9
Network Construction Dr. Mahmoud Abbas Mahmoud
10
EXAMPLE- 4
Construct the network for the project whose activities, their durations and their
precedence relationships are as given in Table 3:
(Note: In this Example durations are given therefore durations should be
mentioned on the network)
TABLE 3
Activity
Predecessor
Activity
Duration
A - 2
B A 6
C B 6
D B 1
E A 3
F E, D 3
G C, F 2
SOLUTION

Mais conteúdo relacionado

Mais procurados

Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineeringrathodjaydeep2
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management pptRajeshPV12
 
4.10 determination of float & slack in cpm network calculations
4.10 determination of float & slack in cpm network calculations4.10 determination of float & slack in cpm network calculations
4.10 determination of float & slack in cpm network calculationsVishal Tidake
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...A Makwana
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Critical path method (cpm)
Critical path method (cpm)Critical path method (cpm)
Critical path method (cpm)hoang tung
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project ManagementAravind Samala
 
Bot(build operate transfer)
Bot(build operate transfer)Bot(build operate transfer)
Bot(build operate transfer)Satish Kambaliya
 
“Construction Risk Management”
“Construction Risk Management”“Construction Risk Management”
“Construction Risk Management”Ary Jamil
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
Critical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksCritical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksPrasad Thanthratey
 
Construction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdfConstruction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdfMeleseMengistu
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentationArchDuty
 

Mais procurados (20)

Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineering
 
Construction Project Management ppt
Construction Project Management pptConstruction Project Management ppt
Construction Project Management ppt
 
4.10 determination of float & slack in cpm network calculations
4.10 determination of float & slack in cpm network calculations4.10 determination of float & slack in cpm network calculations
4.10 determination of float & slack in cpm network calculations
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Critical path method (cpm)
Critical path method (cpm)Critical path method (cpm)
Critical path method (cpm)
 
122 value engineering
122 value engineering122 value engineering
122 value engineering
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Bot(build operate transfer)
Bot(build operate transfer)Bot(build operate transfer)
Bot(build operate transfer)
 
“Construction Risk Management”
“Construction Risk Management”“Construction Risk Management”
“Construction Risk Management”
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Preliminary estimate
Preliminary estimatePreliminary estimate
Preliminary estimate
 
Time cost-trade-off
Time cost-trade-offTime cost-trade-off
Time cost-trade-off
 
Critical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksCritical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/Slacks
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Project planning
Project planning Project planning
Project planning
 
Construction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdfConstruction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdf
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentation
 

Semelhante a Network construction

Semelhante a Network construction (20)

CPM and PERT
CPM and  PERTCPM and  PERT
CPM and PERT
 
PERT-CPM PPT.pptx
PERT-CPM PPT.pptxPERT-CPM PPT.pptx
PERT-CPM PPT.pptx
 
Ovi project
Ovi  projectOvi  project
Ovi project
 
CPM PERT.pptx
CPM PERT.pptxCPM PERT.pptx
CPM PERT.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
Unit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and schedulingUnit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and scheduling
 
Ii. pert cpm
Ii. pert cpmIi. pert cpm
Ii. pert cpm
 
Pert cpm-22-3-21
Pert cpm-22-3-21Pert cpm-22-3-21
Pert cpm-22-3-21
 
Appliedresearchmethodologylecture1 111207045430-phpapp01
Appliedresearchmethodologylecture1 111207045430-phpapp01Appliedresearchmethodologylecture1 111207045430-phpapp01
Appliedresearchmethodologylecture1 111207045430-phpapp01
 
Network problem cpm and pert BY MITESH KUMAR
Network problem cpm and pert BY MITESH KUMARNetwork problem cpm and pert BY MITESH KUMAR
Network problem cpm and pert BY MITESH KUMAR
 
EEM MID2.PPT.pptx
EEM MID2.PPT.pptxEEM MID2.PPT.pptx
EEM MID2.PPT.pptx
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques
 
Cpm network analysis and problems
Cpm network analysis and problemsCpm network analysis and problems
Cpm network analysis and problems
 
PERT AND CPM 2.pdf
PERT AND CPM  2.pdfPERT AND CPM  2.pdf
PERT AND CPM 2.pdf
 
Spm
SpmSpm
Spm
 
Network analysis
Network analysisNetwork analysis
Network analysis
 
Pert & cpm
Pert & cpmPert & cpm
Pert & cpm
 
Lecture 2 PERT-CPM.pdf
Lecture 2 PERT-CPM.pdfLecture 2 PERT-CPM.pdf
Lecture 2 PERT-CPM.pdf
 
IGNOU PERT CPM
IGNOU PERT CPMIGNOU PERT CPM
IGNOU PERT CPM
 
Pert cpm SIDDANNA M BALAPGOL
Pert cpm SIDDANNA M BALAPGOLPert cpm SIDDANNA M BALAPGOL
Pert cpm SIDDANNA M BALAPGOL
 

Mais de Dr. Mahmoud Al-Naimi

أسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdfأسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdfDr. Mahmoud Al-Naimi
 
Certificate - Dr. Mahmoud AL-Naimi
Certificate  - Dr. Mahmoud AL-NaimiCertificate  - Dr. Mahmoud AL-Naimi
Certificate - Dr. Mahmoud AL-NaimiDr. Mahmoud Al-Naimi
 
ملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعDr. Mahmoud Al-Naimi
 
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفةكيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفةDr. Mahmoud Al-Naimi
 
(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...Dr. Mahmoud Al-Naimi
 
أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)Dr. Mahmoud Al-Naimi
 
Product design and manufacture lecture 1
Product design and manufacture lecture  1Product design and manufacture lecture  1
Product design and manufacture lecture 1Dr. Mahmoud Al-Naimi
 
Easy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projectsEasy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projectsDr. Mahmoud Al-Naimi
 
Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Dr. Mahmoud Al-Naimi
 
Easy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationEasy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationDr. Mahmoud Al-Naimi
 
ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق Dr. Mahmoud Al-Naimi
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Dr. Mahmoud Al-Naimi
 
Computer in Design and Manufacturing
Computer in Design and Manufacturing Computer in Design and Manufacturing
Computer in Design and Manufacturing Dr. Mahmoud Al-Naimi
 
إنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكيةإنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكيةDr. Mahmoud Al-Naimi
 

Mais de Dr. Mahmoud Al-Naimi (20)

أسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdfأسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdf
 
Certificate - Dr. Mahmoud AL-Naimi
Certificate  - Dr. Mahmoud AL-NaimiCertificate  - Dr. Mahmoud AL-Naimi
Certificate - Dr. Mahmoud AL-Naimi
 
ملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريع
 
Resource allocation and smoothing
Resource allocation and smoothingResource allocation and smoothing
Resource allocation and smoothing
 
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفةكيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
 
(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...
 
أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)
 
(Aoa) and (aon) networks
(Aoa) and (aon) networks(Aoa) and (aon) networks
(Aoa) and (aon) networks
 
Applications dr. mahmoud al-naimi
Applications   dr. mahmoud al-naimiApplications   dr. mahmoud al-naimi
Applications dr. mahmoud al-naimi
 
Product design and manufacture lecture 1
Product design and manufacture lecture  1Product design and manufacture lecture  1
Product design and manufacture lecture 1
 
Easy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projectsEasy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projects
 
Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations
 
Easy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationEasy steps to network construction and critical path determination
Easy steps to network construction and critical path determination
 
ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق
 
Control charts for variables
Control charts for variables Control charts for variables
Control charts for variables
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
 
Evolution of mrp type systems
Evolution of mrp type systemsEvolution of mrp type systems
Evolution of mrp type systems
 
Computer in Design and Manufacturing
Computer in Design and Manufacturing Computer in Design and Manufacturing
Computer in Design and Manufacturing
 
إنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكيةإنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكية
 
Production planning hierarchy
Production planning hierarchyProduction planning hierarchy
Production planning hierarchy
 

Último

"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming languageSmritiSharma901052
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 

Último (20)

"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming language
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 

Network construction

  • 1. Network Construction Dr. Mahmoud Abbas Mahmoud 0 Network Construction Dr. Mahmoud Abbas Mahmoud Assistant Professor 2016
  • 2. Network Construction Dr. Mahmoud Abbas Mahmoud 1 Network Construction 1- Introduction Network scheduling is a technique used for planning, and scheduling large projects in the field of construction, maintenance, fabrication, purchasing computer system etc. The technique is a method of minimizing the trouble spots such as production, delays and interruptions, by determining critical factors and coordinating various parts of the overall job. There are two basic planning and control technique that utilize a network to complete a predetermined project or schedule. These are Programme Evaluation and Review Technique (PERT) and Critical Path Method (CPM). A project is defined as a combination of interrelated activities all of which must be executed in a certain order for its completion 2- Basic Terms To understand the network techniques one should be familiar with a few basic terms of which both CPM and PERT are special applications. Network It is the graphic representation of logically and sequentially connected activities. Note: There are two types of network diagrams. (i) Activity on Arrow (AOA) diagram or Arrow Diagram (ii) Activity on Node (AON) diagram or Precedence Diagram Method (PDM) In the following sections we will explain how to construct (AOA) diagram which also called arrow diagram, while (AON) diagram will be explained later on. Activity An activity represents some action and is a time consuming effort necessary to complete a particular part of the overall project. Thus, each and every activity has a point of time where it begins and a point where it ends. It is represented in the network by an arrow as follows. Here A is called the activity and i and j are start and end nodes. Event The beginning and end points of an activity are called events or nodes. Event is a point in the time and does not consume any resources. It is represented
  • 3. Network Construction Dr. Mahmoud Abbas Mahmoud 2 by a numbered circle. The head event called the jth event has always a number higher than the tail event called the ith event. Merge and burst events it is not necessary for an event to be the ending event of only one activity but can be the ending event of two or more activities. Such event is defined as a Merge event. If the event happens to be the beginning event of two or more activities it is defined as a Burst event Preceding, succeeding and concurrent activities Activities which must be accomplished before a given event can occur are termed as preceding activities. Activities which cannot be accomplished until an event has occurred are termed as succeeding activities. Activities which can be accomplished concurrently are known as concurrent activities. This classification is relative, which means that one activity can be preceding to a certain event, and the same activity can be succeeding to some other event or it may be a concurrent activity with one or more activities.
  • 4. Network Construction Dr. Mahmoud Abbas Mahmoud 3 Dummy activity certain activities which neither consumes time nor resources but are used simply to represent a connection or a link between the events are known as dummies. It is shown in the network by a dotted line. The purpose of introducing dummy activity is - (i) To maintain uniqueness in the numbering system as every activity may have distinct set of events by which the activity can be identified. (ii) To maintain a proper logic in the network. Note: No two activities can be identified by the same beginning and end event. In such cases, a dummy activity is introduced to resolve the problem. 3- Common Errors Following are the three common errors in a network construction: Looping (cycling): In a network diagram looping error is also known as cycling error. Drawing an endless loop in a network is known as error of looping. A loop can be formed if an activity were represented as going back in line. Dangling To disconnect an activity before the completion of all the activities in a network diagram is known as Dangling.
  • 5. Network Construction Dr. Mahmoud Abbas Mahmoud 4 Redundancy If a dummy activity is the only activity emanating from an event and which can be eliminated is known as redundancy. 4- Rules of Network Construction There are number of rules in connection with the handling of events and activities of a project network that should be followed. (i) Try to avoid arrows which cross each other. (ii) Use straight arrows. (iii) No event can occur until every activity preceding, it has been completed. (iv) An event cannot occur twice i.e. there must be no loops. (v) An activity succeeding an event cannot be started until that event has occurred. (vi) Use arrows from left to right. Avoid mixing two directions, vertical and standing arrows may be used if necessary. (vii) Dummies should be introduced if it is extremely necessary. (viii) The network has only one entry point called the start event and one point of emergence called the end or terminal event. Numbering the Events After the network is drawn in a logical sequence every event is assigned a number. The number sequence must be such so as to reflect the flow of the network. In numbering the events the following rules should be observed. (i) Event numbers should be unique. (ii) Event numbering should be carried out on a sequential basis from left to right. (iii) The initial event which has all outgoing arrows with no incoming arrow is numbered as 1. (iv) Delete all arrows emerging from all the numbered events. This will create at least one new start event out of the preceding events.
  • 6. Network Construction Dr. Mahmoud Abbas Mahmoud 5 (v) Number all new start events 2,3 and so on. Repeat this process until all the terminal event without any successor activity is reached, number the terminal node suitably. Note: The head of an arrow should always bear a number higher than the one assigned to the tail of the arrow. EXAMPLE- 1 Construct the arrow diagram comprising activities A, B, C, ……….., and L, such that the following relationships are satisfied. 1. A, B, and C, the first activities of the project, can start simultaneously. 2. A and B precede D. 3. B precedes E, F, and H. 4. F and C precede G. 5. E and H precede I and J. 6. C, D, F, and J precede K. 7. K precedes L. 8. I, G, and L are the terminal activities of the project. SOLUTION The resulting arrow diagram is shown below. The diagram shows that the dummy activities D1 and D2 are used to establish correct precedence relationships. D3 is used to identify activities E and H with unique end events. The event of the project are numbered such that their ascending order indicates the direction of progress in the project.
  • 7. Network Construction Dr. Mahmoud Abbas Mahmoud 6 EXAMPLE- 2 Construct a network for the project whose activities and their precedence relationships are as given in Table 1: TABLE 1 Activity A B C D E F G H I Predecessor Activity - A A - D B, C, E F D G, H SOLUTION From the given constraints, it is clear that A, D are the starting activity and I the terminal activity. B, C are starting with the same event and are both the predecessors of the activity F. Also E has to be the predecessor of F. Hence, we have to introduce a dummy activity.
  • 8. Network Construction Dr. Mahmoud Abbas Mahmoud 7 D1 is the dummy activity. Finally we have the following network. EXAMPLE- 3 Construct a network for the project whose activities and their precedence relationships are as given in Table 2. TABLE 2 Activity A B C D E F G H I J K Predecessor Activity - - - A C B, D B, D E, F A G, H E, F SOLUTION
  • 9. Network Construction Dr. Mahmoud Abbas Mahmoud 8
  • 10. Network Construction Dr. Mahmoud Abbas Mahmoud 9
  • 11. Network Construction Dr. Mahmoud Abbas Mahmoud 10 EXAMPLE- 4 Construct the network for the project whose activities, their durations and their precedence relationships are as given in Table 3: (Note: In this Example durations are given therefore durations should be mentioned on the network) TABLE 3 Activity Predecessor Activity Duration A - 2 B A 6 C B 6 D B 1 E A 3 F E, D 3 G C, F 2 SOLUTION