SlideShare uma empresa Scribd logo
1 de 12
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
Quality Control
TQM-Tools and
Techniques
(Applications)
Asst. Prof. Dr. Mahmoud Abbas Mahmoud
2014 - 2015
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
The Pareto Chart is a simple to use and
powerful graphic to identify where the
majority of problems in a process are
originating.
Pareto Chart
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
Steps:
1. Determine the method of classifying the
data: by problem, cause, type of
nonconformity, etc
2. Decide if dollars (best), weighted frequency,
or frequency is to be used to rank the
characteristics
3. Collect data for an appropriate time interval
Constructing a Pareto Diagram
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
Steps cont’d:
4. Summarize the data and rank order
categories from largest to smallest
5. Compute the cumulative percentage if it is
to be used
6. Construct the diagram and find the vital few
Constructing a Pareto Diagram
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
The count of paint defects from an
automotive assembly plant are as in table
below ;
Use Pareto diagram to analyze these data!
Case 1
OtherOrange
peal
Thin
paint
Sealer
under
Off-
color
SagDirt in
paint
ScratchDefect
11254221652Count
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
Pareto Diagram for Case 1
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
Case 2
The count of defects found in refrigerators
tested by production line inspectors are as in
table below :
Use Pareto diagram to analyze these data!
OtherCompress
or (noise)
Paint
scratch
Water
line screw
loose
Shelf trim
loose
Handel trim
loose
Door not
aligned
Defect
78453211157158Count
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
Cause-and-Effect Diagram
Cause-and-Effect Diagram
C
a
u
s
e
s
E
f
f
e
c
t
Quality
Characteristic
People Materials
Equipment Measurement
Work Methods
Environment
Primary
Cause
Secondary Cause
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
Cause-and-Effect Diagram Case 1
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
Cause-and-Effect Diagram Case 1
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
Construct a cause and effect diagram
for the case of computer downtime !!!
Cause-and-Effect Diagram Case 2
Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458.
All rights reserved
Cause-and-Effect Diagram

Mais conteúdo relacionado

Mais procurados

Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrolceutics1315
 
Acceptance sampling
Acceptance samplingAcceptance sampling
Acceptance samplingHassan Habib
 
Implementation of quality improvement tools in brass industry to improve qual...
Implementation of quality improvement tools in brass industry to improve qual...Implementation of quality improvement tools in brass industry to improve qual...
Implementation of quality improvement tools in brass industry to improve qual...Alexander Decker
 
Gr&r studies
Gr&r studiesGr&r studies
Gr&r studiesshilpi020
 
Understanding Gage R&R Analysis
Understanding Gage R&R AnalysisUnderstanding Gage R&R Analysis
Understanding Gage R&R AnalysisInstron
 
02training material for msa
02training material for msa02training material for msa
02training material for msa營松 林
 
Tolerance Stackups Using Oracle Crystal Ball
Tolerance Stackups Using Oracle Crystal BallTolerance Stackups Using Oracle Crystal Ball
Tolerance Stackups Using Oracle Crystal BallRamon Balisnomo
 
Qm0012 statistical process control and process capability
Qm0012  statistical process control and process capabilityQm0012  statistical process control and process capability
Qm0012 statistical process control and process capabilitysmumbahelp
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality controlSai Datri Arige
 
Statistical process control
Statistical process controlStatistical process control
Statistical process controlsandesh shah
 
Measurement System Analysis - Module 1
Measurement System Analysis - Module 1Measurement System Analysis - Module 1
Measurement System Analysis - Module 1Subhodeep Deb
 
Stochastic Process
Stochastic ProcessStochastic Process
Stochastic Processknksmart
 

Mais procurados (15)

Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrol
 
Introduction to Gage R&R
Introduction to Gage R&RIntroduction to Gage R&R
Introduction to Gage R&R
 
Acceptance sampling
Acceptance samplingAcceptance sampling
Acceptance sampling
 
Implementation of quality improvement tools in brass industry to improve qual...
Implementation of quality improvement tools in brass industry to improve qual...Implementation of quality improvement tools in brass industry to improve qual...
Implementation of quality improvement tools in brass industry to improve qual...
 
Gr&r studies
Gr&r studiesGr&r studies
Gr&r studies
 
Understanding Gage R&R Analysis
Understanding Gage R&R AnalysisUnderstanding Gage R&R Analysis
Understanding Gage R&R Analysis
 
02training material for msa
02training material for msa02training material for msa
02training material for msa
 
Tolerance Stackups Using Oracle Crystal Ball
Tolerance Stackups Using Oracle Crystal BallTolerance Stackups Using Oracle Crystal Ball
Tolerance Stackups Using Oracle Crystal Ball
 
Qm0012 statistical process control and process capability
Qm0012  statistical process control and process capabilityQm0012  statistical process control and process capability
Qm0012 statistical process control and process capability
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
3.... acceptance sampling
3.... acceptance sampling3.... acceptance sampling
3.... acceptance sampling
 
Measurement System Analysis
Measurement System AnalysisMeasurement System Analysis
Measurement System Analysis
 
Measurement System Analysis - Module 1
Measurement System Analysis - Module 1Measurement System Analysis - Module 1
Measurement System Analysis - Module 1
 
Stochastic Process
Stochastic ProcessStochastic Process
Stochastic Process
 

Destaque

Computer in Design and Manufacturing
Computer in Design and Manufacturing Computer in Design and Manufacturing
Computer in Design and Manufacturing Dr. Mahmoud Al-Naimi
 
Stake out by coordinates
Stake out by coordinatesStake out by coordinates
Stake out by coordinatesJurgen Mc More
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Dr. Mahmoud Al-Naimi
 
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفةكيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفةDr. Mahmoud Al-Naimi
 
ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق Dr. Mahmoud Al-Naimi
 
Product design and manufacture lecture 1
Product design and manufacture lecture  1Product design and manufacture lecture  1
Product design and manufacture lecture 1Dr. Mahmoud Al-Naimi
 
Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Dr. Mahmoud Al-Naimi
 
Material and capacity requirements planning (mrp and crp) part 1
Material and capacity requirements planning (mrp and crp) part  1Material and capacity requirements planning (mrp and crp) part  1
Material and capacity requirements planning (mrp and crp) part 1Dr. Mahmoud Al-Naimi
 
Material and capacity requirements planning (mrp and crp) part 2
Material and capacity requirements planning (mrp and crp) part  2Material and capacity requirements planning (mrp and crp) part  2
Material and capacity requirements planning (mrp and crp) part 2Dr. Mahmoud Al-Naimi
 
PM Session 6
PM Session 6PM Session 6
PM Session 6dmdk12
 
إدارة المخاطر للتنبؤ بالفشل المصرفي- أنموذج مقترح
 إدارة المخاطر للتنبؤ بالفشل المصرفي- أنموذج مقترح إدارة المخاطر للتنبؤ بالفشل المصرفي- أنموذج مقترح
إدارة المخاطر للتنبؤ بالفشل المصرفي- أنموذج مقترحabbas nazy
 
Solving linear programming model by simplex method
Solving linear programming model by simplex methodSolving linear programming model by simplex method
Solving linear programming model by simplex methodRoshan Kumar Patel
 
Hr manager action plan
Hr manager action planHr manager action plan
Hr manager action planEmad Sarhan
 
Managing Project Resources
Managing Project ResourcesManaging Project Resources
Managing Project ResourcesToyin Osunlaja
 
Simplex Method
Simplex MethodSimplex Method
Simplex MethodSachin MK
 

Destaque (20)

Vacuum Metallurgy: Lecture Vacuum heat treatment
Vacuum Metallurgy: Lecture Vacuum heat treatment Vacuum Metallurgy: Lecture Vacuum heat treatment
Vacuum Metallurgy: Lecture Vacuum heat treatment
 
Computer in Design and Manufacturing
Computer in Design and Manufacturing Computer in Design and Manufacturing
Computer in Design and Manufacturing
 
Ch17 Mrp
Ch17  MrpCh17  Mrp
Ch17 Mrp
 
Stake out by coordinates
Stake out by coordinatesStake out by coordinates
Stake out by coordinates
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
 
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفةكيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
 
ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق
 
Product design and manufacture lecture 1
Product design and manufacture lecture  1Product design and manufacture lecture  1
Product design and manufacture lecture 1
 
Evolution of mrp type systems
Evolution of mrp type systemsEvolution of mrp type systems
Evolution of mrp type systems
 
Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations
 
Resource allocation and smoothing
Resource allocation and smoothingResource allocation and smoothing
Resource allocation and smoothing
 
Material and capacity requirements planning (mrp and crp) part 1
Material and capacity requirements planning (mrp and crp) part  1Material and capacity requirements planning (mrp and crp) part  1
Material and capacity requirements planning (mrp and crp) part 1
 
Material and capacity requirements planning (mrp and crp) part 2
Material and capacity requirements planning (mrp and crp) part  2Material and capacity requirements planning (mrp and crp) part  2
Material and capacity requirements planning (mrp and crp) part 2
 
PM Session 6
PM Session 6PM Session 6
PM Session 6
 
إدارة المخاطر للتنبؤ بالفشل المصرفي- أنموذج مقترح
 إدارة المخاطر للتنبؤ بالفشل المصرفي- أنموذج مقترح إدارة المخاطر للتنبؤ بالفشل المصرفي- أنموذج مقترح
إدارة المخاطر للتنبؤ بالفشل المصرفي- أنموذج مقترح
 
(Aoa) and (aon) networks
(Aoa) and (aon) networks(Aoa) and (aon) networks
(Aoa) and (aon) networks
 
Solving linear programming model by simplex method
Solving linear programming model by simplex methodSolving linear programming model by simplex method
Solving linear programming model by simplex method
 
Hr manager action plan
Hr manager action planHr manager action plan
Hr manager action plan
 
Managing Project Resources
Managing Project ResourcesManaging Project Resources
Managing Project Resources
 
Simplex Method
Simplex MethodSimplex Method
Simplex Method
 

Semelhante a TQM Tools for Quality Improvement

Chapter 11- Reliability.ppt
Chapter 11- Reliability.pptChapter 11- Reliability.ppt
Chapter 11- Reliability.pptmohammedaljboby
 
Mitigating Risks and Ensuring Compliance
Mitigating Risks and Ensuring Compliance Mitigating Risks and Ensuring Compliance
Mitigating Risks and Ensuring Compliance EPAY Systems
 
J. Salinas resume012016
J. Salinas resume012016J. Salinas resume012016
J. Salinas resume012016Jaime Salinas
 
Int 327 ch01
Int 327 ch01Int 327 ch01
Int 327 ch01Lisa Vick
 
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...IJERA Editor
 
Test Environment Management: A Critical Requirement for Effective CI/CD
Test Environment Management: A Critical Requirement for Effective CI/CDTest Environment Management: A Critical Requirement for Effective CI/CD
Test Environment Management: A Critical Requirement for Effective CI/CDDevOps.com
 
More info._Mr_Rattanachai_T_Jan'2017
More info._Mr_Rattanachai_T_Jan'2017More info._Mr_Rattanachai_T_Jan'2017
More info._Mr_Rattanachai_T_Jan'2017Rattanachai Tawtatum
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...J. García - Verdugo
 
Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3TKMG, Inc.
 
Failure Mode Effect Analysis in a Frying Pan Manufacturing Industry
Failure Mode Effect Analysis in a Frying Pan Manufacturing IndustryFailure Mode Effect Analysis in a Frying Pan Manufacturing Industry
Failure Mode Effect Analysis in a Frying Pan Manufacturing IndustryIRJET Journal
 
SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016
SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016
SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016Roy Derks
 
Cause-Effect Graphing: Rigorous Test Case Design
Cause-Effect Graphing: Rigorous Test Case DesignCause-Effect Graphing: Rigorous Test Case Design
Cause-Effect Graphing: Rigorous Test Case DesignTechWell
 
Jeremy_Hallauer_s_resume
Jeremy_Hallauer_s_resumeJeremy_Hallauer_s_resume
Jeremy_Hallauer_s_resumeJeremy Hallauer
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET Journal
 
Risk Assessment Strategies PowerPoint Presentation Slides
Risk Assessment Strategies PowerPoint Presentation SlidesRisk Assessment Strategies PowerPoint Presentation Slides
Risk Assessment Strategies PowerPoint Presentation SlidesSlideTeam
 
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...IRJET Journal
 
Machine Learning and Predictive Quality Management (AIM311) - AWS re:Invent 2018
Machine Learning and Predictive Quality Management (AIM311) - AWS re:Invent 2018Machine Learning and Predictive Quality Management (AIM311) - AWS re:Invent 2018
Machine Learning and Predictive Quality Management (AIM311) - AWS re:Invent 2018Amazon Web Services
 

Semelhante a TQM Tools for Quality Improvement (20)

Attributes.ppt
Attributes.pptAttributes.ppt
Attributes.ppt
 
Chapter 11- Reliability.ppt
Chapter 11- Reliability.pptChapter 11- Reliability.ppt
Chapter 11- Reliability.ppt
 
Mitigating Risks and Ensuring Compliance
Mitigating Risks and Ensuring Compliance Mitigating Risks and Ensuring Compliance
Mitigating Risks and Ensuring Compliance
 
J. Salinas resume012016
J. Salinas resume012016J. Salinas resume012016
J. Salinas resume012016
 
Int 327 ch01
Int 327 ch01Int 327 ch01
Int 327 ch01
 
Reliabilty
ReliabiltyReliabilty
Reliabilty
 
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
 
FMICA ppt
FMICA pptFMICA ppt
FMICA ppt
 
Test Environment Management: A Critical Requirement for Effective CI/CD
Test Environment Management: A Critical Requirement for Effective CI/CDTest Environment Management: A Critical Requirement for Effective CI/CD
Test Environment Management: A Critical Requirement for Effective CI/CD
 
More info._Mr_Rattanachai_T_Jan'2017
More info._Mr_Rattanachai_T_Jan'2017More info._Mr_Rattanachai_T_Jan'2017
More info._Mr_Rattanachai_T_Jan'2017
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Failure Mode and Ef...
 
Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3Metrics-Based Process Mapping: Part 2 of 3
Metrics-Based Process Mapping: Part 2 of 3
 
Failure Mode Effect Analysis in a Frying Pan Manufacturing Industry
Failure Mode Effect Analysis in a Frying Pan Manufacturing IndustryFailure Mode Effect Analysis in a Frying Pan Manufacturing Industry
Failure Mode Effect Analysis in a Frying Pan Manufacturing Industry
 
SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016
SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016
SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016
 
Cause-Effect Graphing: Rigorous Test Case Design
Cause-Effect Graphing: Rigorous Test Case DesignCause-Effect Graphing: Rigorous Test Case Design
Cause-Effect Graphing: Rigorous Test Case Design
 
Jeremy_Hallauer_s_resume
Jeremy_Hallauer_s_resumeJeremy_Hallauer_s_resume
Jeremy_Hallauer_s_resume
 
IRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel EquipmentIRJET- Rejection Analysis in Fuel Equipment
IRJET- Rejection Analysis in Fuel Equipment
 
Risk Assessment Strategies PowerPoint Presentation Slides
Risk Assessment Strategies PowerPoint Presentation SlidesRisk Assessment Strategies PowerPoint Presentation Slides
Risk Assessment Strategies PowerPoint Presentation Slides
 
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...
IRJET- Failure Mode and Effect Analysis (FMEA) – A Case Study in Manufacturin...
 
Machine Learning and Predictive Quality Management (AIM311) - AWS re:Invent 2018
Machine Learning and Predictive Quality Management (AIM311) - AWS re:Invent 2018Machine Learning and Predictive Quality Management (AIM311) - AWS re:Invent 2018
Machine Learning and Predictive Quality Management (AIM311) - AWS re:Invent 2018
 

Mais de Dr. Mahmoud Al-Naimi

أسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdfأسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdfDr. Mahmoud Al-Naimi
 
Certificate - Dr. Mahmoud AL-Naimi
Certificate  - Dr. Mahmoud AL-NaimiCertificate  - Dr. Mahmoud AL-Naimi
Certificate - Dr. Mahmoud AL-NaimiDr. Mahmoud Al-Naimi
 
ملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعDr. Mahmoud Al-Naimi
 
(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...Dr. Mahmoud Al-Naimi
 
أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)Dr. Mahmoud Al-Naimi
 
Easy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projectsEasy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projectsDr. Mahmoud Al-Naimi
 
Easy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationEasy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationDr. Mahmoud Al-Naimi
 
إنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكيةإنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكيةDr. Mahmoud Al-Naimi
 

Mais de Dr. Mahmoud Al-Naimi (10)

أسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdfأسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdf
 
Certificate - Dr. Mahmoud AL-Naimi
Certificate  - Dr. Mahmoud AL-NaimiCertificate  - Dr. Mahmoud AL-Naimi
Certificate - Dr. Mahmoud AL-Naimi
 
ملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريع
 
(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...
 
أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)
 
Easy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projectsEasy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projects
 
Easy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationEasy steps to network construction and critical path determination
Easy steps to network construction and critical path determination
 
إنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكيةإنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكية
 
Network construction
Network construction  Network construction
Network construction
 
Production planning hierarchy
Production planning hierarchyProduction planning hierarchy
Production planning hierarchy
 

Último

KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 

Último (20)

KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 

TQM Tools for Quality Improvement

  • 1. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved Quality Control TQM-Tools and Techniques (Applications) Asst. Prof. Dr. Mahmoud Abbas Mahmoud 2014 - 2015
  • 2. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved The Pareto Chart is a simple to use and powerful graphic to identify where the majority of problems in a process are originating. Pareto Chart
  • 3. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved Steps: 1. Determine the method of classifying the data: by problem, cause, type of nonconformity, etc 2. Decide if dollars (best), weighted frequency, or frequency is to be used to rank the characteristics 3. Collect data for an appropriate time interval Constructing a Pareto Diagram
  • 4. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved Steps cont’d: 4. Summarize the data and rank order categories from largest to smallest 5. Compute the cumulative percentage if it is to be used 6. Construct the diagram and find the vital few Constructing a Pareto Diagram
  • 5. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved The count of paint defects from an automotive assembly plant are as in table below ; Use Pareto diagram to analyze these data! Case 1 OtherOrange peal Thin paint Sealer under Off- color SagDirt in paint ScratchDefect 11254221652Count
  • 6. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved Pareto Diagram for Case 1
  • 7. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved Case 2 The count of defects found in refrigerators tested by production line inspectors are as in table below : Use Pareto diagram to analyze these data! OtherCompress or (noise) Paint scratch Water line screw loose Shelf trim loose Handel trim loose Door not aligned Defect 78453211157158Count
  • 8. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved Cause-and-Effect Diagram Cause-and-Effect Diagram C a u s e s E f f e c t Quality Characteristic People Materials Equipment Measurement Work Methods Environment Primary Cause Secondary Cause
  • 9. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved Cause-and-Effect Diagram Case 1
  • 10. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved Cause-and-Effect Diagram Case 1
  • 11. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved Construct a cause and effect diagram for the case of computer downtime !!! Cause-and-Effect Diagram Case 2
  • 12. Besterfield: Quality Control, 8th ed.. © 2009 Pearson Education, Upper Saddle River, NJ 07458. All rights reserved Cause-and-Effect Diagram